Serial Number | 79405905 |
Word Mark | IE-GRID |
Filing Date | Wednesday, April 17, 2024 |
Status | 640 - NON-FINAL ACTION COUNTED - NOT MAILED |
Status Date | Wednesday, November 13, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Fuel cells; electrochemical fuel cells; rechargeable fuel cells; electric fuel cells; apparatus for regulating apparatus, electric current; fuel cell systems comprised of fuel cells for battery charging and replacement; apparatus, equipment and components for handling, transmitting and distributing electro-chemical power, namely, fuel cells and power distribution machines; apparatus and instruments for conducting, distributing, transforming, accumulating, regulating, adjusting and controlling electricity and fuel cells, namely, apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electric current; electric power distribution units; electro-chemical generators being fuel cells and batteries; power regulators, namely, voltage regulators for electric power; electric power converters; power connectors; power adapters; battery charging devices; battery terminals; communication transmission equipment, namely, telecommunications base station equipment for cellular and fixed networking and communications applications; electricity conduits; control panels (electricity); power distributing boxes; portable power chargers; batteries (electric); rechargeable batteries; electronic storage devices, namely, blank electronic storage media; accessories, parts, fittings, and testing apparatus for all of the aforesaid goods; machines and signal generator installations and parts thereof for transmission and distribution of electricity |
Goods and Services | Machines for generating electrical power; devices in the nature of engines and motors for generating electricity; machines, electric generator installations and parts thereof for generation of electricity and generation, transmission and distribution of energy, other than electricity; electric generators; parts and fittings for the aforesaid goods |
Pseudo Mark | INTELLIGENT ENERGY GRID |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 024, 031, 034, 035 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, October 3, 2024 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, October 3, 2024 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Intelligent Energy Limited |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | GB |
Event Date | Event Description |
Tuesday, October 8, 2024 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Tuesday, October 8, 2024 | APPLICATION FILING RECEIPT MAILED |
Thursday, October 3, 2024 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Thursday, November 14, 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Tuesday, November 19, 2024 | REFUSAL PROCESSED BY MPU |
Tuesday, November 19, 2024 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Saturday, December 7, 2024 | REFUSAL PROCESSED BY IB |
Wednesday, October 30, 2024 | ASSIGNED TO EXAMINER |
Wednesday, November 13, 2024 | NON-FINAL ACTION WRITTEN |
Sunday, February 2, 2025 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Sunday, February 2, 2025 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Monday, February 3, 2025 | TEAS/EMAIL CORRESPONDENCE ENTERED |