Serial Number | 79261763 |
Word Mark | IDEAL WORK |
Filing Date | Wednesday, November 28, 2018 |
Status | 700 - REGISTERED |
Status Date | Tuesday, October 10, 2023 |
Registration Number | 7184940 |
Registration Date | Tuesday, October 10, 2023 |
Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, July 25, 2023 |
Description of Mark | The mark consists of the word element "IDEAL WORK" in fancy font, where the word" IDEAL" is put above the word "WORK". The letters "I" and "W" overlap the lines of the square in which the mark is inscribed. |
Goods and Services | Non-metallic building materials, namely, wood paneling; non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal; non-agricultural lime for building purposes; slag-lime cement; mortar for building; plaster; screeds, namely, self-leveling concrete for use in building construction; binding materials for road repair, namely, road asphalt and polymeric bitumen emulsions; binding materials for floor repair, namely, adhesive and bonding mortar for building purposes; binding materials for wall repair, namely, adhesive and bonding mortar for building purposes; binding agents for making stones, namely, cement; binding agents for making briquettes, namely, pitch; cement; cement mixes; cements for building; wall linings, not of metal, for building; non-metallic cladding for facades; façade cladding sheets of mortar coated foamed materials; non-metallic reinforcements for concrete and wood building construction, namely, non-metal load-bearing section bars; non-metallic façades for construction purposes; cement slabs; non-metallic building components in the form of slabs of concrete; façade construction components of non-metallic materials, namely, panels; ceramic tiles; non-metal mosaic tiles for building; stucco tiles; non-metal tiles; plaster boards; non-metallic building materials having acoustic properties, namely, fiberglass panels, wood panelling, plaster boards, wood boards, plywood board, plaster boards; prefabricated non-metal walls; non-metallic prefabricated building components, namely, building panels; roof coverings, not of metal; stairs, not of metal; stair-treads or steps, not of metal; non-metal components for load-bearing walls, namely, beams and posts; modular building units, namely, non-metallic modular homes; non-metallic foundation material for use in building, namely, drilled and grouted pile foundations; shelter structures and transportable buildings, not of metal; thermal insulating glass for use in building; sand; gravel; refractory aggregates, not of metal; concrete; non-metallic prefabricated elements for building, namely, braces, supports, friezes; floorings made of cement; walls made of cement |
Goods and Services | Building construction; repair of non-metallic building materials, non-metallic rigid pipes for building, non-metallic transportable buildings, non-metal monuments, non-metal wall linings for building, non-metallic cladding for facades, façade cladding sheets of mortar coated foamed materials, non-metallic facades, plaster boards, non-metallic building materials having acoustic properties, soundproof hoods being prefabricated structures not of metal, prefabricated non-metal walls, prefabricated non-metallic building components, attic covers, staircases, components for load-bearing walls, modular non-metallic building units, non-metallic foundation material for use in building, non-metallic structures and transportable buildings, thermal insulating glass for use in building, metallic prefabricated elements for building; installation of non-metallic building materials, non-metallic rigid pipes for building, non-metal monuments, non-metal wall linings for building, non-metallic cladding for facades, façade cladding sheets of mortar coated foamed materials, non-metallic facades, plaster boards, non-metallic building materials having acoustic properties, prefabricated non-metal walls, non-metallic prefabricated building components, attic covers, staircases, components for load-bearing walls, non-metallic foundation material for use in building, thermal insulating glass for use in building, non-metallic prefabricated elements for building; construction of non-metallic transportable buildings, non-metallic modular building units, non-metal structures and transportable buildings, sound-proof hoods being prefabricated structures not of metal; rental of building equipment; installation of building materials; rental of materials for construction in the nature of construction equipment for use in construction site selection, extraction of gravel material, and ground movement; renovation, restoration and repair of buildings |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Goods and Services | Paints, varnishes, lacquers; preservative coatings against rust and against deterioration of wood; colorants, dyes for general industrial use; inks for printing, marking and engraving; raw natural resins; metals in foil and powder form for use in painting, decorating, printing and art; paints for walls; paints; varnishes; lacquers; wall coatings, namely, paints; protective preparations for metals, namely, anti-tarnishing preparations for coating metals; fire retardant paints; bactericidal paints; antifouling paints; fixatives in the nature of varnishes; mordant dyes; wood mordants; all of the aforesaid goods being related to the construction industry only |
International Class | 002 - Paints, varnishes, lacquers; preservatives against rust and against deterioration of wood; colorants; mordants; raw natural resins; metals in foil and powder form for painters, decorators, printers and artists. |
US Class Codes | 006, 011, 016 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, July 3, 2019 |
Primary Code | 002 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, July 3, 2019 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, July 3, 2019 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | IDEAL WORK S.R.L. |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | IT |
Party Name | IDEAL WORK S.R.L. |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | IT |
Party Name | IDEAL WORK S.R.L. |
Party Type | 11 - New Owner Before Publication |
Legal Entity Type | 99 - Other |
Address | IT |
Party Name | LIBRA HOLDING S.R.L. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 16 - Limited Liability Company |
Address | IT |
Event Date | Event Description |
Tuesday, July 9, 2019 | APPLICATION FILING RECEIPT MAILED |
Thursday, June 27, 2019 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Wednesday, July 3, 2019 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Wednesday, July 3, 2019 | ASSIGNED TO EXAMINER |
Tuesday, July 9, 2019 | NON-FINAL ACTION WRITTEN |
Wednesday, July 10, 2019 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Tuesday, August 6, 2019 | REFUSAL PROCESSED BY MPU |
Tuesday, August 6, 2019 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Friday, August 23, 2019 | REFUSAL PROCESSED BY IB |
Friday, September 20, 2019 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Friday, September 20, 2019 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Monday, September 30, 2019 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Monday, October 7, 2019 | ASSIGNED TO LIE |
Monday, October 7, 2019 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, October 7, 2019 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, October 7, 2019 | SUSPENSION LETTER WRITTEN |
Monday, October 7, 2019 | LETTER OF SUSPENSION E-MAILED |
Monday, October 7, 2019 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Friday, November 15, 2019 | LIMITATION OF GOODS RECEIVED FROM IB |
Monday, April 6, 2020 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Friday, April 10, 2020 | LIMITATION FROM THE IB - REQUEST EXAM REVIEW |
Friday, April 10, 2020 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Thursday, October 8, 2020 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Friday, November 13, 2020 | CHANGE OF OWNER RECEIVED FROM IB |
Wednesday, December 2, 2020 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, December 2, 2020 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Monday, February 27, 2023 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Saturday, December 19, 2020 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Wednesday, April 7, 2021 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Wednesday, October 20, 2021 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Thursday, January 20, 2022 | NEW REPRESENTATIVE AT IB RECEIVED |
Tuesday, April 19, 2022 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Monday, October 17, 2022 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Monday, February 27, 2023 | TEAS CHANGE OF OWNER ADDRESS RECEIVED |
Monday, February 27, 2023 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Monday, February 27, 2023 | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS |
Monday, February 27, 2023 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Monday, February 27, 2023 | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED |
Saturday, April 29, 2023 | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION |
Friday, June 9, 2023 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, July 5, 2023 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, July 5, 2023 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, July 5, 2023 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Tuesday, July 25, 2023 | PUBLISHED FOR OPPOSITION |
Tuesday, July 25, 2023 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Wednesday, July 26, 2023 | NOTIFICATION PROCESSED BY IB |
Tuesday, October 10, 2023 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, October 10, 2023 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
Wednesday, January 10, 2024 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Saturday, June 29, 2024 | NEW REPRESENTATIVE AT IB RECEIVED |
Tuesday, January 30, 2024 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Wednesday, January 10, 2024 | FINAL DISPOSITION PROCESSED |
Wednesday, January 10, 2024 | FINAL DISPOSITION NOTICE SENT TO IB |