Serial Number | 79365560 |
Word Mark | HOESCH SPUNDWAND |
Filing Date | Thursday, February 23, 2023 |
Status | 661 - RESPONSE AFTER NON-FINAL ACTION - ENTERED |
Status Date | Tuesday, March 11, 2025 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Electrical signal transmitters for sheet piles |
Goods and Services | Sheet pile accessories of metal, namely, hoods being end caps for sheet piling, starting weights for securing sheet piling, metal anchors and anchor bolts for connecting sheet piles, straps for securing sheet piling, fastening bolts for securing supporting belts to sheet piling, upright sheet piling columns for building, ladders for access to sheet piling structures, spacer holding brackets, bollards, and upright sheet piling columns for building for impassable sheet piles |
Goods and Services | Plastic gaskets for sheet piles |
Pseudo Mark | HOESCH SPUN WAND |
NOT AVAILABLE | "SPUNDWAND" |
Translation of Words in Mark | The English translation of "SPUNDWAND" in the mark is "BULKHEAD, SHEET PILE". |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Monday, March 20, 2023 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Monday, March 20, 2023 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 017 - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal. |
US Class Codes | 001, 005, 012, 013, 035, 050 |
Class Status Code | 6 - Active |
Class Status Date | Monday, March 20, 2023 |
Primary Code | 017 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Hoesch Spundwand und Projekte GmbH |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | DE |
Event Date | Event Description |
Friday, November 24, 2023 | ASSIGNED TO EXAMINER |
Friday, March 17, 2023 | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB |
Monday, March 20, 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Friday, March 24, 2023 | APPLICATION FILING RECEIPT MAILED |
Friday, November 24, 2023 | NON-FINAL ACTION WRITTEN |
Saturday, November 25, 2023 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Wednesday, August 14, 2024 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, August 14, 2024 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Saturday, August 31, 2024 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Monday, September 9, 2024 | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW |
Tuesday, September 10, 2024 | NON-FINAL ACTION WRITTEN |
Wednesday, September 11, 2024 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Wednesday, September 11, 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Wednesday, September 11, 2024 | REFUSAL PROCESSED BY MPU |
Monday, September 30, 2024 | REFUSAL PROCESSED BY IB |
Tuesday, March 11, 2025 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, March 11, 2025 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Tuesday, March 11, 2025 | TEAS/EMAIL CORRESPONDENCE ENTERED |