Serial Number | 79240514 |
Word Mark | HEXAPLI |
Filing Date | Friday, April 13, 2018 |
Status | 700 - REGISTERED |
Status Date | Tuesday, October 1, 2019 |
Registration Number | 5870427 |
Registration Date | Tuesday, October 1, 2019 |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, July 16, 2019 |
Goods and Services | Non-metallic building materials, namely, wood cladding; semi-worked composite wood; semi-worked wood for building; veneer wood; sawn timber; manufactured timber; wood, semi-worked; furrings of wood; framework for building, not of metal; non-metal wainscotting; non-metal shingles; non-metallic cladding panels for building; non-metallic cladding materials for building; non-metallic cladding panels for roofs; non-metallic cladding for facades; wood posts; wood rafters; floor boards of wood; wooden decking boards for building; parquet floor boards; timber boarding, all the aforesaid goods being for interior and exterior cladding of facades; ceilings, not of metal; floors, not of metal; glue-laminated wood; non-metallic transportable buildings; canopies in the nature of shelter structures of non-metallic materials; non-metallic pergolas; arbours not of metal; swimming pools, not of metal; cabanas, not of metal; roof coverings, not of metal, for building; floorboards; fences, not of metal; path edgings made of non-metallic materials; turnstiles, not of metal; paving slabs, not of metal; non-metal railings for balconies; non-metallic balcony enclosures; garden sheds of wood; timber building boards; non-metallic sidewalls in the nature of wall panels; roof coverings, not of metal; latticework, not of metal; reinforcing materials, not of metal, for building; non-metallic shelter structures; non-metallic curtain walls; non-metallic damp course materials, namely, waterproofing membranes for roofing, floors and walls |
Goods and Services | Installation of cladding; installing fencing; placement of boards, namely, installation of floorboards and installation of wallboard; installation of gates; installation of screen walls; installation of screens; installation of windscreens; installation of pergolas; installation of garden furniture; installation of structural panels made of wood; maintenance of cladding; maintenance of fences; panel maintenance in the nature of the maintenance of wood panels; maintenance of gates; maintenance of screen walls; maintenance of screens; maintenance of windscreens; maintenance of pergolas; maintenance of garden furniture; providing construction information; building consultancy, namely, consultation regarding construction; building construction supervision; installation of building insulation; installation of insulation to existing buildings; installation of insulation into internal and external walls, ceilings and roofs; installation of fireproofing materials during construction |
Goods and Services | Dry-rot treatment of timber; preservative treatment of wood, other than painting; treatment of timber with preservatives; sawing of timber; planing of materials; woodworking; planing of timber; providing information relating to woodworking; flame proofing of non-metallic building materials made of wood; fireproofing of existing structures; fireproofing of existing buildings; treatment of materials, namely, fireproofing wood |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Monday, September 17, 2018 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Monday, September 17, 2018 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Monday, September 17, 2018 |
Primary Code | 040 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | PIVETEAU BOIS |
Party Type | 30 - Original Registrant |
Legal Entity Type | 34 - NOT AVAILABLE |
Address | F-85140 ESSARTS EN BOCAGE FR |
Party Name | PIVETEAU BOIS |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 34 - NOT AVAILABLE |
Address | F-85140 ESSARTS EN BOCAGE FR |
Party Name | PIVETEAU BOIS |
Party Type | 10 - Original Applicant |
Legal Entity Type | 34 - NOT AVAILABLE |
Address | F-85140 ESSARTS EN BOCAGE FR |
Event Date | Event Description |
Friday, February 14, 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Friday, January 24, 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
Friday, January 24, 2020 | FINAL DISPOSITION PROCESSED |
Wednesday, January 1, 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, October 1, 2019 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, July 16, 2019 | PUBLISHED FOR OPPOSITION |
Wednesday, June 26, 2019 | NOTICE OF PUBLICATION |
Monday, June 10, 2019 | EXAMINERS AMENDMENT MAILED |
Friday, June 7, 2019 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Friday, June 7, 2019 | EXAMINER'S AMENDMENT ENTERED |
Friday, June 7, 2019 | EXAMINERS AMENDMENT -WRITTEN |
Thursday, May 30, 2019 | NON-FINAL ACTION MAILED |
Wednesday, May 29, 2019 | NON-FINAL ACTION WRITTEN |
Thursday, April 25, 2019 | CORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED |
Tuesday, April 9, 2019 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, April 9, 2019 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, April 8, 2019 | ASSIGNED TO LIE |
Thursday, April 4, 2019 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, March 29, 2019 | CORRECTION TRANSACTION RECEIVED FROM IB |
Friday, October 19, 2018 | REFUSAL PROCESSED BY IB |
Thursday, October 4, 2018 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Thursday, October 4, 2018 | REFUSAL PROCESSED BY MPU |
Saturday, September 29, 2018 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Friday, September 28, 2018 | NON-FINAL ACTION WRITTEN |
Friday, September 21, 2018 | APPLICATION FILING RECEIPT MAILED |
Monday, September 17, 2018 | ASSIGNED TO EXAMINER |
Monday, September 17, 2018 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Thursday, September 13, 2018 | SN ASSIGNED FOR SECT 66A APPL FROM IB |