
| Serial Number | 79181125 |
| Word Mark | HAUFF-TECHNIK |
| Filing Date | Wednesday, September 2, 2015 |
| Status | 706 - SECTION 71 ACCEPTED |
| Status Date | Tuesday, April 30, 2024 |
| Registration Number | 5253036 |
| Registration Date | Tuesday, August 1, 2017 |
| Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
| Published for Opposition Date | Tuesday, May 16, 2017 |
| Goods and Services | Non-metal building materials, namely, press seals; non-metal building materials, namely, press seals in the nature of a sealing closure for wall and floor openings; non-metal building materials, namely, press seals in the nature of a sealing closure for wall and floor openings penetrated by a line; non-metal building materials, namely, cable entries, wall sleeves, [waste water entries,] single building entries, [multiple-service building entries, roof entries,] all of the foregoing being in the nature of non-metal ducts; non-metal rigid pipes for use with foundations; non-metal rigid pipes for building, namely, wall sleeves in the form of pipes, feed tubes, protective tubes, [drain pipes; asphalt; pitch and bitumen; non-metal transportable buildings; non-metal monuments; drain pipes, not of metal; concrete; concrete building elements, namely, prefabricated concrete water wells, prefabricated concrete sump pits in the nature of sump reservoirs, prefabricated concrete storm water cisterns and elements of the foregoing in the nature of prefabricated sections of concrete water wells, concrete sump pits in the nature of sump reservoirs and concrete storm water cisterns; concrete walls, concrete pipes and concrete plates in the nature of reinforcing plates for concrete and wood building construction;] [ non-metal concrete casting forms, namely, boarded panels, shuttering panels, shuttering rails, pre-cast concrete wall forms; non-metal outlet pipes, namely, non-metal drain pipes, non-metal gutter pipes, non-metal drop pipes in the nature of drain pipes; non-metal penstock pipes; kits for constructing prefabricated non-metal houses; non-metal fireproof construction materials, namely, intumescent materials in the nature of pads; sandstone tubes for building, in the nature of sandstone pipes; non-metal manhole covers; non-metal manhole liners; non-metal props in the nature of support stanchions for building construction; non-metal beams; non-metal water-pipes;] building materials primarily of plastics, namely, wall and floor ducts; attachments for non-metal wall and floor ducts, namely, non-metal covers for floor and wall ducts through which lines can be led and blind non-metal covers for wall and floor ducts, namely, closing covers for closing the duct prior to leading through a line, the covers being provided for an insertion into or a connection to the wall and floor ducts |
| Goods and Services | [Sealing, packing, and insulating materials; non-metal flexible pipes; joint packings for non-metal rigid pipes and non-metal flexible pipes; expansion joint fillers; sealing compounds in the nature of sealants for wall and floor ducts; sealing means, namely, non-metal seals and gaskets for preventing leakage of fluids not being for use in machinery or land vehicle engines; non-metal sealing rings for use as connection seals; non-metal sealing strips for use in sealing against wall and floor ducts; substances for insulating buildings against moisture; sealants for pipe and cable joints; gum, raw or semi-worked; rings of rubber for use as pipe and cable connection seals;] sealing plugs, namely, rubber plugs; [vulcanite ebonite; semi-processed artificial resins and synthetic resins; semi-processed plastics; pipe gaskets; pipe jackets, not of metal; junctions for pipes, not of metal; flexible tubes of textile material for insulating cables and wires and pipes; synthetic rubber; ] waterproof sealings, namely, non-metal seals for mounting at wall and floor ducts; [rubber spacers, other than pipe clamps, namely, washers, rings for use as pipe and cable connection seals;] sealing and insulating materials in the nature of sealing sleeves and spacer blocks for through holes in wall and floor ducts and that also enclose cables and pipes; sealing and insulating materials in the nature of sealing wall and floor ducts for leading through electricity lines, gas lines, water lines, heating lines, telecommunication lines, signal lines and data lines; [ sealing and insulating materials in the nature of sealing wall ducts for ship walls] and housing walls; sealing and insulating materials in the nature of sealing wall and floor ducts for setting in concrete in walls and floors of buildings; sealing and insulating materials in the nature of sealing wall and floor ducts for a modular assembly of a plurality of ducts forming a module together for an integration into a wall or floor all sold as a unit; sealing and insulating materials in the nature of assemblies comprised of a number of interconnected sealing wall and floor ducts all sold as a unit; [sealing and insulating materials in the nature of flexible sealing ducts for leading through a line, plastic tubes, flexible pipes and flexible shrink tubes, and non-metal connection couplings for flexible tubes and pipes; non-metal connection couplings for flexible tubes; sealing and fire protection assembly kits for use in updating wall and floor ducts for leading through cables and lines through walls and floors, comprising intumescent fire retardant sealant and insulating materials in pad form for insertion into through holes, in particular core drillings and wall sleeves and for upgrading wall and floor ducts; ] sealing and insulating materials in the nature of sealing wall and floor ducts of gastight and watertight construction, for leading through lines through walls and floors; parts and accessories for all the aforesaid goods, namely, pipe gaskets, non-metal pipe jackets, non-metal pipe junctions, rubber sealing plugs, rubber washers |
| Translation of Words in Mark | The English translation of "Technik" in the mark is "engineering". |
| International Class | 017 - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal. |
| US Class Codes | 001, 005, 012, 013, 035, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Tuesday, February 2, 2016 |
| Primary Code | 017 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
| US Class Codes | 001, 012, 033, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Tuesday, February 2, 2016 |
| Primary Code | 019 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | HAUFF-TECHNIK GmbH & Co. KG |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 99 - Other |
| Address | 89568 Hermaringen 89568 DE |
| Party Name | HAUFF-TECHNIK GmbH & Co. KG |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 99 - Other |
| Address | 89568 Hermaringen DE |
| Party Name | HAUFF-TECHNIK GmbH & Co. KG |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 99 - Other |
| Address | 89568 Hermaringen DE |
| Event Date | Event Description |
| Saturday, January 30, 2016 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
| Tuesday, February 2, 2016 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Tuesday, February 2, 2016 | ASSIGNED TO EXAMINER |
| Saturday, February 6, 2016 | APPLICATION FILING RECEIPT MAILED |
| Monday, February 8, 2016 | NON-FINAL ACTION WRITTEN |
| Tuesday, February 9, 2016 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Thursday, February 11, 2016 | REFUSAL PROCESSED BY MPU |
| Thursday, February 11, 2016 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Saturday, February 27, 2016 | REFUSAL PROCESSED BY IB |
| Monday, August 8, 2016 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
| Tuesday, August 9, 2016 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Tuesday, August 16, 2016 | ASSIGNED TO LIE |
| Tuesday, August 16, 2016 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, August 16, 2016 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Wednesday, September 7, 2016 | FINAL REFUSAL WRITTEN |
| Thursday, September 8, 2016 | FINAL REFUSAL MAILED |
| Monday, March 6, 2017 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
| Tuesday, March 14, 2017 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, March 14, 2017 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Tuesday, April 4, 2017 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Friday, April 7, 2017 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
| Wednesday, April 26, 2017 | NOTICE OF PUBLICATION |
| Wednesday, April 26, 2017 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Wednesday, April 26, 2017 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Tuesday, May 16, 2017 | PUBLISHED FOR OPPOSITION |
| Wednesday, June 28, 2017 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
| Wednesday, June 28, 2017 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Tuesday, August 1, 2017 | REGISTERED-PRINCIPAL REGISTER |
| Friday, October 13, 2017 | NOTIFICATION PROCESSED BY IB |
| Friday, October 27, 2017 | CORRECTION TRANSACTION RECEIVED FROM IB |
| Friday, October 27, 2017 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Wednesday, November 1, 2017 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Friday, November 3, 2017 | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED |
| Wednesday, November 8, 2017 | FINAL DISPOSITION PROCESSED |
| Monday, July 24, 2023 | TEAS SECTION 71 RECEIVED |
| Wednesday, November 8, 2017 | FINAL DISPOSITION NOTICE SENT TO IB |
| Friday, November 24, 2017 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Saturday, August 13, 2022 | NEW REPRESENTATIVE AT IB RECEIVED |
| Monday, April 1, 2024 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
| Tuesday, April 30, 2024 | REGISTERED-SEC.71 ACCEPTED |
| Tuesday, April 30, 2024 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED |
| Tuesday, December 31, 2024 | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED |
| Saturday, March 15, 2025 | INVALIDATION PROCESSED |
| Saturday, April 19, 2025 | PARTIAL INVALIDATION PROCESSED BY THE IB |
| Thursday, July 3, 2025 | INTERNATIONAL REGISTRATION RENEWED |
| Friday, July 4, 2025 | NEW REPRESENTATIVE AT IB RECEIVED |
| Saturday, March 15, 2025 | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |