Serial Number | 79058607 |
Word Mark | GYGER |
Filing Date | Thursday, May 29, 2008 |
Status | 402 - IR CANCELLED - US APPLICATION ABANDONED |
Status Date | Wednesday, May 30, 2018 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Machines and machine tools; motors (except for land vehicles); pumps in particular pumps for high pressure liquid chromatography (HPLC); machines for printing, printing installations and equipment, in particular for printing the Braille alphabet |
Goods and Services | Apparatuses for micrometering, micrometering installations and equipment, in particular for the metering of adhesive materials, gases, inks, aromas, materials for printing Braille letters, greasing and minimum quantity lubrication with oils, mixing various media of differing viscosity, printing on edgings, metering essences and aromas, metering for UV-curing inks and blue carbon, metering for raised printing, metering for fraction collectors, biological screening, research services in the field of cells, analytical techniques, research and development; printers for computers |
Goods and Services | Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and sanitary purposes; chromatography apparatus for industrial purposes |
Goods and Services | Treatment of materials, in particular for microsystems, microfluid systems, microvalves, systems for printing the Braille alphabet; firing pottery; millworking; custom assembling of materials for third parties; metal processing; polishing (abrasion); sawing; grinding; welding; CNC treatment; treatment of titanium; treatment of special steel; treatment of aluminium; treatment of plastics; treatment of diamonds; treatment of sapphires; treatment of ceramics; treatment of hard metals; treatment of magnetic alloys; lapping; assembly; stamping; gluing |
Goods and Services | Scientific and technological services and research and design relating thereto, in particular for microsystems, microfluid systems, microvalves, systems for printing Braille letters; industrial analysis and research services; design and development of computers and software; services of engineers; technical research; research in the field of mechanical engineering; expert technical reports; physics research; technical project studies; quality control; research and development of new products for third parties; materials testing |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 031, 034, 035 |
Class Status Code | H - NOT AVAILABLE |
Class Status Date | Wednesday, May 30, 2018 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | H - NOT AVAILABLE |
Class Status Date | Wednesday, May 30, 2018 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
US Class Codes | 013, 021, 023, 031, 034 |
Class Status Code | H - NOT AVAILABLE |
Class Status Date | Wednesday, May 30, 2018 |
Primary Code | 011 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | H - NOT AVAILABLE |
Class Status Date | Wednesday, May 30, 2018 |
Primary Code | 040 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | H - NOT AVAILABLE |
Class Status Date | Wednesday, May 30, 2018 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Fritz Gyger AG |
Party Type | 10 - Original Applicant |
Legal Entity Type | 98 - Unknown |
Address | CH |
Event Date | Event Description |
Friday, December 21, 2018 | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED |
Thursday, December 20, 2018 | DEATH OF INTERNATIONAL REGISTRATION |
Friday, December 8, 2017 | NEW REPRESENTATIVE AT IB RECEIVED |
Friday, October 20, 2017 | NEW REPRESENTATIVE AT IB RECEIVED |
Friday, September 3, 2010 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Thursday, June 10, 2010 | FINAL DISPOSITION NOTICE SENT TO IB |
Thursday, June 10, 2010 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Friday, March 26, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Thursday, March 11, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Thursday, March 11, 2010 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Wednesday, June 10, 2009 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
Wednesday, June 10, 2009 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
Friday, November 7, 2008 | REFUSAL PROCESSED BY IB |
Tuesday, October 21, 2008 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Tuesday, October 21, 2008 | REFUSAL PROCESSED BY MPU |
Tuesday, October 21, 2008 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Monday, October 20, 2008 | NON-FINAL ACTION WRITTEN |
Monday, October 20, 2008 | ASSIGNED TO EXAMINER |
Friday, October 10, 2008 | ASSIGNED TO EXAMINER |
Friday, October 10, 2008 | NEW APPLICATION ENTERED IN TRAM |
Thursday, October 9, 2008 | SN ASSIGNED FOR SECT 66A APPL FROM IB |