
| Serial Number | 79377465 |
| Word Mark | GRUEN |
| Filing Date | Thursday, January 5, 2023 |
| Status | 700 - REGISTERED |
| Status Date | Tuesday, March 11, 2025 |
| Registration Number | 7717675 |
| Registration Date | Tuesday, March 11, 2025 |
| Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
| Published for Opposition Date | Tuesday, January 21, 2025 |
| Description of Mark | The mark consists of three diagonal lines to the left of the wording "GRUEN". |
| Goods and Services | Metallic building material, namely structural floor panels, wall drains for use in construction of building waterproofing systems and floor drains for use in construction of building systems; building materials of metal, namely, semi-finished metal tubes; ironmongery, namely metal washers; stands, supports, spacers, protective, connecting and fastening components and brackets made of metal, namely, metal display stands, metal door fasteners and metal shelf and spacer brackets; building material of metal for the installation of floor and wall coverings, namely frames, rails, and brackets; metal stair edging profiles, perimeter profiles for balconies or terraces, all goods being made of metal; frames, namely door frames of metal and window frames of metal; drain seals, pipes and tubes made of metal; tile covers made of metal; paving slabs made of metal; metal drain traps and manually operated valves of metal. |
| Goods and Services | Non-metallic building material, namely structural floor panels; building materials not of metal namely wall drains for use in construction of building systems and floor drains for use in construction of building systems; rigid tubes and pipes not of metal for construction purposes; asphalt; pitch; bitumen; transportable buildings not of metal; natural stone; tiles and paving slabs, not of metal; semi-finished materials, comprising wood, in the form of wood blocks; rigid tubes and pipes made of plastic; floor drains made of plastic; wall and floor drains, not of metal; non-metal access covers; rigid pipes, not of metal for building; building panels, not of metal, for building showers; wall and floor panels, not of metal; cements. |
| International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
| US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, September 1, 2023 |
| Primary Code | 006 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
| US Class Codes | 001, 012, 033, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, September 1, 2023 |
| Primary Code | 019 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | EVI METAL INOKS YAPI ÇÖZÜMLERI LIMITED SIRKETI |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 99 - Other |
| Address | TR |
| Party Name | EVI METAL INOKS YAPI ÇÖZÜMLERI LIMITED SIRKETI |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 99 - Other |
| Address | TR |
| Party Name | EVI METAL INOKS YAPI ÇÖZÜMLERI LIMITED SIRKETI |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 99 - Other |
| Address | TR |
| Event Date | Event Description |
| Thursday, August 31, 2023 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
| Friday, September 1, 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Tuesday, September 5, 2023 | APPLICATION FILING RECEIPT MAILED |
| Friday, September 29, 2023 | ASSIGNED TO EXAMINER |
| Wednesday, November 8, 2023 | NON-FINAL ACTION WRITTEN |
| Thursday, November 9, 2023 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Tuesday, November 14, 2023 | REFUSAL PROCESSED BY MPU |
| Tuesday, November 14, 2023 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Monday, December 4, 2023 | REFUSAL PROCESSED BY IB |
| Wednesday, March 27, 2024 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Wednesday, March 27, 2024 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Wednesday, March 27, 2024 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Tuesday, May 21, 2024 | FINAL REFUSAL WRITTEN |
| Tuesday, May 21, 2024 | FINAL REFUSAL E-MAILED |
| Tuesday, May 21, 2024 | NOTIFICATION OF FINAL REFUSAL EMAILED |
| Wednesday, July 3, 2024 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
| Wednesday, July 3, 2024 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Wednesday, July 3, 2024 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Thursday, October 24, 2024 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Wednesday, January 15, 2025 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
| Tuesday, January 21, 2025 | PUBLISHED FOR OPPOSITION |
| Tuesday, January 21, 2025 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
| Sunday, January 26, 2025 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
| Monday, January 27, 2025 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Saturday, February 15, 2025 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Tuesday, March 11, 2025 | REGISTERED-PRINCIPAL REGISTER |
| Tuesday, March 11, 2025 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
| Wednesday, June 11, 2025 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Monday, September 22, 2025 | GENERIC MADRID TRANSACTION CREATED |
| Monday, September 22, 2025 | GENERIC MADRID TRANSACTION SENT TO IB |
| Saturday, November 15, 2025 | FINAL DECISION TRANSACTION PROCESSED BY IB |