Serial Number | 79123849 |
Word Mark | GRIDCUBE |
Filing Date | Friday, August 3, 2012 |
Status | 404 - IR CANCELLED - US REGISTRATION CANCELLED |
Status Date | Wednesday, August 3, 2022 |
Registration Number | 4336896 |
Registration Date | Tuesday, May 21, 2013 |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, March 5, 2013 |
Goods and Services | Generation of energy, namely, production of electric energy and renewable energies; transformation of energy, namely, generation of energy by converting sunlight into solar power, generation of energy by converting wind into electrical power |
Goods and Services | Electric and electronic apparatus and instruments for wind turbines, wind generators, wind power plants, hydroelectric power plants, photovoltaic based power plants and wind turbine generators, namely, apparatus and computers for control, monitoring and automatically turning on or off the generator and for automatic starting after a public power breakdown, for overvoltage protection strokes of lightning; microprocessors for controlling and monitoring constant voltage, frequency, phase conditions, rotor speed control of the efficiency and thickness of brake pads and of the temperature, direction and speed of wind; vibration sensors for installation in mill housings, watt-hour meters; all the aforesaid goods for use in connection with wind turbines, wind generators, wind power plants and wind turbine generators only; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modules; electronical sensors for measuring solar radiation; photovoltaic cells also including a solar thermal collector sold as a unit; solar panels for production of electricity; solar collectors; apparatus for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electric switches, adapters, voltage regulators for electric power; central processing units for processing information, data, sound or images; data processing computers, computers, all for operating and control of wind turbines |
Pseudo Mark | GRID CUBE |
Goods and Services | Research and development into, as well as technical information and advice on, energy efficiency, energy poverty, greenhouses gases and emissions, global warming, energy and the environment, sustainable development and the use of the new technologies in the field of energy; preparation of environmental compliance reports in respect of the aforesaid; research, information and advice on industrial and engineering services and research and development services in the field of energy, namely, hydrogen as an energy source; analytical services, namely, the sampling and reporting of technical data from energy sources; technical information and advice relating to the auditing of energy consumption and energy efficiency, new product development policy and new product planning strategy consultation in the field of energy; conducting feasibility studies relating to exploration and exploitation of energy, renewable energy, solar and wind power; information, advice and consultation in the fields of energy, renewable energy, solar and wind power |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, December 27, 2019 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, December 27, 2019 |
Primary Code | 040 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, December 27, 2019 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | WIND TO POWER SYSTEM, S.L. |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | ES |
Party Name | WIND TO POWER SYSTEM, S.L. |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | ES |
Party Name | WIND TO POWER SYSTEM, S.L. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | ES |
Event Date | Event Description |
Friday, April 14, 2023 | UNDELIVERABLE MAIL - NO ACTION TAKEN |
Sunday, February 26, 2023 | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED |
Sunday, February 26, 2023 | DEATH OF INTERNATIONAL REGISTRATION |
Saturday, October 24, 2020 | TOTAL INVALIDATION PROCESSED BY THE IB |
Friday, September 25, 2020 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Friday, September 25, 2020 | INVALIDATION PROCESSED |
Thursday, August 27, 2020 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
Friday, December 27, 2019 | CANCELLED SECTION 71 |
Thursday, August 20, 2015 | NEW REPRESENTATIVE AT IB RECEIVED |
Saturday, December 14, 2013 | NOTIFICATION PROCESSED BY IB |
Monday, November 25, 2013 | FINAL DISPOSITION NOTICE SENT TO IB |
Monday, November 25, 2013 | FINAL DISPOSITION PROCESSED |
Monday, June 24, 2013 | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED |
Saturday, June 22, 2013 | CORRECTION TRANSACTION RECEIVED FROM IB |
Thursday, June 20, 2013 | GRANT OF PROTECTION CREATED, TO BE SENT TO IB |
Tuesday, May 21, 2013 | REGISTERED-PRINCIPAL REGISTER |
Monday, April 29, 2013 | NOTIFICATION PROCESSED BY IB |
Tuesday, March 5, 2013 | PUBLISHED FOR OPPOSITION |
Wednesday, February 27, 2013 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, February 27, 2013 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, February 13, 2013 | NOTICE OF PUBLICATION |
Tuesday, January 29, 2013 | APPLICATION FILING RECEIPT MAILED |
Friday, January 25, 2013 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Friday, January 25, 2013 | ASSIGNED TO EXAMINER |
Friday, January 25, 2013 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Friday, January 18, 2013 | LIMITATION FROM ORIGINAL APPLICATION ENTERED |
Thursday, January 17, 2013 | SN ASSIGNED FOR SECT 66A APPL FROM IB |