Serial Number | 79266763 |
Word Mark | GRIDCON |
Filing Date | Friday, May 17, 2019 |
Status | 700 - REGISTERED |
Status Date | Tuesday, August 11, 2020 |
Registration Number | 6121184 |
Registration Date | Tuesday, August 11, 2020 |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, May 26, 2020 |
Goods and Services | Controlling, measuring, testing and inspecting equipment and apparatus for use in regulating the performance and efficiency of high power engineering equipment in the nature of high power electrical applications to reduce distortion and provide power factor correction for users of electrical power, low power engineering equipment in the nature of low power electrical applications to reduce distortion and provide power factor correction for users of electrical power; electric power converters; rectifiers; inverters; converters; direct current-to-direct current converters; electrical energy accumulators; installations and equipment in the nature of electricity distribution consoles for distributing electricity, and downloadable computer software for conducting, distributing, switching, transforming, accumulating, influencing or controlling electricity; installations and equipment, namely, AC/DC converters, DC/DC modules, power conversion and inversion systems, energy accumulators, active filters, and transformers, for the purpose of regulating power supply systems, power grids, solar modules, transformers and converters; installations and equipment in the nature of voltage monitor modules for guaranteeing and improving the voltage quality of public, private and industrial power supply systems and power grids, and downloadable computer software for voltage regulators for the purpose of guaranteeing and improving the voltage quality of public, private and industrial power supply systems and power grids; installations and equipment in the nature of power factor regulator for reactive power factor compensation using coils and capacitors and for uninterruptible power supply and downloadable computer software for regulating reactive power factor compensation using coils and capacitors and for uninterruptible power supply; electric filters for the suppression of electrical noise and radiation and electronic filters, passive and active electronic filters, electronic network filters, electronic harmonic filters, electronic power factor correction filters |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Friday, September 13, 2019 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | MASCHINENFABRIK REINHAUSEN GMBH |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | 93059 Regensburg DE |
Party Name | MASCHINENFABRIK REINHAUSEN GMBH |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | 93059 Regensburg DE |
Party Name | MASCHINENFABRIK REINHAUSEN GMBH |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | 93059 Regensburg DE |
Event Date | Event Description |
Saturday, January 27, 2024 | NEW REPRESENTATIVE AT IB RECEIVED |
Friday, December 10, 2021 | NEW REPRESENTATIVE AT IB RECEIVED |
Saturday, December 26, 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Friday, December 4, 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
Thursday, December 3, 2020 | FINAL DISPOSITION PROCESSED |
Wednesday, November 11, 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, August 11, 2020 | REGISTERED-PRINCIPAL REGISTER |
Friday, May 29, 2020 | NOTIFICATION PROCESSED BY IB |
Tuesday, May 26, 2020 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, May 26, 2020 | PUBLISHED FOR OPPOSITION |
Wednesday, May 13, 2020 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, May 13, 2020 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, May 6, 2020 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Saturday, April 18, 2020 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, March 25, 2020 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, March 25, 2020 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, March 20, 2020 | ASSIGNED TO LIE |
Friday, March 13, 2020 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Saturday, October 12, 2019 | REFUSAL PROCESSED BY IB |
Thursday, September 26, 2019 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Thursday, September 26, 2019 | REFUSAL PROCESSED BY MPU |
Wednesday, September 18, 2019 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Tuesday, September 17, 2019 | NON-FINAL ACTION WRITTEN |
Tuesday, September 17, 2019 | APPLICATION FILING RECEIPT MAILED |
Friday, September 13, 2019 | ASSIGNED TO EXAMINER |
Friday, September 13, 2019 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, September 5, 2019 | SN ASSIGNED FOR SECT 66A APPL FROM IB |