Serial Number | 98737382 |
Word Mark | GPS 3D MODULAR, THE ULTIMATE WAY TO BUILD |
Filing Date | Friday, September 6, 2024 |
Status | 653 - SUSPENSION LETTER - MAILED |
Status Date | Friday, August 29, 2025 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Custom manufacturing of modular units for residential, commercial, industrial and institutional buildings; custom production of volumetric three dimensional seamless monolithic modular precast concrete units for others; custom manufacturing of prefabricated houses |
Goods and Services | Building materials, namely, pre-cast concrete wall forms; concrete; concrete beams; concrete blocks; concrete floors; concrete panels; concrete piles; concrete prefabricated slabs; concrete slabs; concrete walls; panels of precast concrete for buildings; prefabricated houses that primarily are non-metal; fiberglass reinforced polymer rebar; prefabricated residential, commercial, industrial and institutional buildings that are primarily non-metal; prefabricated volumetric modular units that are primarily non-metal for use in the construction of residential, commercial, industrial and institutional buildings |
Goods and Services | Metal reinforcing materials for concrete; steel rebars, rods, and mesh used for strengthening and reinforcing concrete structures |
Goods and Services | Polymeric synthetic fibers for reinforcing concrete |
Pseudo Mark | GPS THREE D MODULAR THE ULTIMATE WAY TO BUILD |
Goods and Services | Advisory services relating to the construction of buildings; assembly of prefabricated houses; building construction services; construction of modular homes; construction project management services; construction, maintenance and repair of buildings; consultancy services relating to the construction of buildings; real estate development and construction of residential and commercial properties; construction of accommodations for on-site oil and gas workers; construction of containment units for the storage of oil, gas and effluent byproducts from oil and gas extraction; real estate development of residential, institutional and commercial properties; general building contractor services; plumbing services; construction project management in the field of building and infrastructure construction; providing advice and information in the field of environmentally sustainable building practices; construction of modular buildings |
NOT AVAILABLE | 3D MODULAR |
Goods and Services | Architectural consultancy services; architectural services; design, planning and engineering in the field of building construction; designing of prefabricated houses; electrical engineering; mechanical engineering; research in the field of building construction; structural engineering service |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, September 6, 2024 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, September 6, 2024 |
Primary Code | 040 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 017 - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal. |
US Class Codes | 001, 005, 012, 013, 035, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, September 6, 2024 |
Primary Code | 017 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, September 6, 2024 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, September 6, 2024 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Friday, September 6, 2024 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | GPS 3D Modular Solutions LLP |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | London EC1V2NX GB |
Event Date | Event Description |
Friday, September 6, 2024 | NEW APPLICATION ENTERED |
Monday, March 17, 2025 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Tuesday, March 18, 2025 | ASSIGNED TO EXAMINER |
Tuesday, March 18, 2025 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Friday, May 30, 2025 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, June 2, 2025 | NON-FINAL ACTION WRITTEN |
Monday, June 2, 2025 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Tuesday, March 18, 2025 | NON-FINAL ACTION WRITTEN |
Tuesday, March 18, 2025 | NON-FINAL ACTION E-MAILED |
Friday, May 30, 2025 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, May 30, 2025 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Thursday, August 28, 2025 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, August 28, 2025 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Thursday, August 28, 2025 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, August 29, 2025 | SUSPENSION LETTER WRITTEN |
Friday, August 29, 2025 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Friday, August 29, 2025 | LETTER OF SUSPENSION E-MAILED |
Monday, June 2, 2025 | NON-FINAL ACTION E-MAILED |