
| Serial Number | 98005120 |
| Word Mark | GENERAC |
| Filing Date | Friday, May 19, 2023 |
| Status | 661 - RESPONSE AFTER NON-FINAL ACTION - ENTERED |
| Status Date | Tuesday, January 6, 2026 |
| Registration Number | 0000000 |
| Registration Date | NOT AVAILABLE |
| Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
| Published for Opposition Date | NOT AVAILABLE |
| Indication of Colors claimed | The color(s) black and orange is/are claimed as a feature of the mark. |
| Description of Mark | The mark consists of the stylized wording "GENERAC" in black bold letters having an orange stylized line underneath. |
| Goods and Services | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; apparatus for recording, transmitting, and reproducing sound, images or data; recorded media, namely, electronic database in the field of power generation recorded on computer media; downloadable computer software used to remotely monitor and control residential and industrial generators; blank digital or analogue recording and storage media, namely, electronic storage media; automatic transfer switches (ats); batteries and battery chargers; home energy battery storage systems comprised of batteries, power inverters, and battery storage cabinets for storing the batteries; renewable battery system to provide backup power; circuit breakers; electronic devices, namely, energy meters for tracking and monitoring energy usage; control and measuring apparatus and instruments, namely, computer-controlled apparatus for testing and measuring power signals, not for medical purposes; electric control panels; downloadable computer software for accessing information on generators, light towers, heaters and pumps, and portable water trailers; downloadable computer software for monitoring live home power consumption, power generation, and renewable battery systems; electric control devices for energy management; energy monitors for tracking, controlling and monitoring energy usage, namely, energy meters for tracking and monitoring energy usage; electric power extension cords; power extension cords for generators; load controllers for managing power consumption, namely, load banks; electric welding apparatus and electric arc welding apparatus, namely, electric batteries; electrical power distribution panels; electrical power extension cords for power generators; electronic devices, namely, energy monitors for tracking and monitoring energy usage; electronic load controllers for managing power consumption, namely, load banks; electronic modules that facilitate the monitoring and management of power consumption for use with standby generators and transfer switches in the nature of computers; electronic modules that facilitate the monitoring and management of power consumption for use with standby generators and transfer switches in the nature of computers; fuses for electric current; home energy battery storage systems comprised of batteries, power inverters, and battery storage cabinets for storing the batteries; inverters; monitoring devices for monitoring fuel levels in propane tanks; power distribution inlet boxes for connecting portable generators to transfer switches; renewable battery system to provide backup power; surge protectors; electric switches, electric transfer switches, automatic transfer switches; water temperature gauges; uninterruptable power systems, namely, medium voltage power distribution and protection component system composed of breakers and switchgears; wireless controllers to remotely monitor and control the function and status of other electrical, electronic, and mechanical devices or systems, namely, energy systems; electrical distribution control boxes; electrical transfer switches; engine-driven battery chargers; electric switches, automatic transfer switches and automatic transfer switches being parts of machines; and structural fittings being structural parts for all the aforesaid goods |
| International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
| US Class Codes | 021, 023, 026, 036, 038 |
| Class Status Code | 6 - Active |
| Class Status Date | Thursday, June 22, 2023 |
| Primary Code | 009 |
| First Use Anywhere Date | Monday, December 1, 2008 |
| First Use In Commerce Date | Monday, December 1, 2008 |
| Party Name | Generac Power Systems, Inc. |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 03 - Corporation |
| Address | Waukesha, WI 53189 |
| Event Date | Event Description |
| Tuesday, May 23, 2023 | NEW APPLICATION ENTERED |
| Thursday, June 22, 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Friday, June 23, 2023 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
| Friday, July 21, 2023 | TEAS VOLUNTARY AMENDMENT RECEIVED |
| Wednesday, December 6, 2023 | ASSIGNED TO EXAMINER |
| Thursday, December 7, 2023 | NON-FINAL ACTION WRITTEN |
| Thursday, December 7, 2023 | NON-FINAL ACTION E-MAILED |
| Thursday, December 7, 2023 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
| Thursday, March 7, 2024 | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED |
| Thursday, March 7, 2024 | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED |
| Wednesday, June 5, 2024 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Wednesday, June 5, 2024 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Wednesday, June 5, 2024 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Tuesday, December 3, 2024 | TEAS VOLUNTARY AMENDMENT RECEIVED |
| Tuesday, December 3, 2024 | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED |
| Thursday, April 17, 2025 | FINAL REFUSAL WRITTEN |
| Thursday, April 17, 2025 | FINAL REFUSAL E-MAILED |
| Thursday, April 17, 2025 | NOTIFICATION OF FINAL REFUSAL EMAILED |
| Wednesday, April 30, 2025 | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY |
| Thursday, July 17, 2025 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
| Thursday, July 17, 2025 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Thursday, July 17, 2025 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Friday, July 18, 2025 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Tuesday, August 19, 2025 | WITHDRAWN FROM PUB - OG REVIEW QUERY |
| Wednesday, September 3, 2025 | PREVIOUS ALLOWANCE COUNT WITHDRAWN |
| Saturday, November 1, 2025 | NON-FINAL ACTION WRITTEN |
| Saturday, November 1, 2025 | NON-FINAL ACTION E-MAILED |
| Saturday, November 1, 2025 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
| Tuesday, January 6, 2026 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Tuesday, January 6, 2026 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, January 6, 2026 | TEAS/EMAIL CORRESPONDENCE ENTERED |