
| Serial Number | 79110900 |
| Word Mark | FUNDO |
| Filing Date | Thursday, January 12, 2012 |
| Status | 709 - CANCELLED - SECTION 71 |
| Status Date | Friday, September 29, 2023 |
| Registration Number | 4299767 |
| Registration Date | Tuesday, March 12, 2013 |
| Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
| Published for Opposition Date | Tuesday, December 25, 2012 |
| Goods and Services | rigid plastic pipes; concrete drainage structures, namely, trench drains and drain traps; non-metallic construction material, namely, interior and exterior boards and drywall panels; wall and floor panels made of earthenware and natural stone; tiles; asphalt-based roofing mastics and grout compounds |
| Goods and Services | semi-finished goods, composed of organic and inorganic, non-metallic materials, namely, plastic and ceramic materials in matting, panel, profile, rod, frame and block form for bath and shower installations; non-metal seals for bathtubs, shower stalls and plumbing connections; pipe gaskets and pipe insulation material; gasket elements made of rubber, caoutchouc, or plastic for plumbing installations |
| Goods and Services | metal construction materials, namely, semi-finished pipes and sectioning made of metal in the nature of supports and braces for construction use; small items of metal hardware, namely, nails, screws nuts and bolts, and ironmongery goods, namely, metal knobs, drain traps and drain pipes; protection, connection and fixing parts made of metal, namely, metal locks, metal drain parts, metal roofing and roof drainage parts; pipes of metal, metal drains for use in the construction of basement waterproofing systems and drain trap valves of metal |
| Translation of Words in Mark | The English translation of "FUNDO" in the mark is "DEEP" or "BOTTOM" in Portuguese and "LANDED PROPERTY" or "ESTATE" in Spanish. |
| Goods and Services | chemical preparations for industrial use; adhesives for industrial use; unprocessed synthetic resins and synthetic materials in the nature of synthetic resins; chemical additives for concrete, mortar, screed and construction coatings |
| Goods and Services | plumbing fittings, namely, drains; non-metal water pipelines; bath and shower equipment, namely, shower cabins, baths and showers |
| International Class | 001 - Chemicals used in industry, science and photography, as well as in agriculture, horticulture and forestry; unprocessed artificial resins; unprocessed plastics; manures; fire extinguishing compositions; tempering and soldering preparations; chemical substances for preserving foodstuffs; tanning substances; adhesives used in industry. |
| US Class Codes | 001, 005, 006, 010, 026, 046 |
| Class Status Code | F - NOT AVAILABLE |
| Class Status Date | Friday, September 29, 2023 |
| Primary Code | 001 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
| US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
| Class Status Code | F - NOT AVAILABLE |
| Class Status Date | Friday, September 29, 2023 |
| Primary Code | 006 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
| US Class Codes | 013, 021, 023, 031, 034 |
| Class Status Code | F - NOT AVAILABLE |
| Class Status Date | Friday, September 29, 2023 |
| Primary Code | 011 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 017 - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal. |
| US Class Codes | 001, 005, 012, 013, 035, 050 |
| Class Status Code | F - NOT AVAILABLE |
| Class Status Date | Friday, September 29, 2023 |
| Primary Code | 017 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
| US Class Codes | 001, 012, 033, 050 |
| Class Status Code | F - NOT AVAILABLE |
| Class Status Date | Friday, September 29, 2023 |
| Primary Code | 019 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | Wedi GmbH |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 99 - Other |
| Address | Emsdetten 48282 DE |
| Party Name | Wedi GmbH |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 99 - Other |
| Address | 48282 Emsdetten DE |
| Party Name | Wedi GmbH |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 99 - Other |
| Address | 48282 Emsdetten DE |
| Event Date | Event Description |
| Wednesday, April 25, 2012 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Wednesday, April 11, 2012 | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB |
| Thursday, April 12, 2012 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Tuesday, April 17, 2012 | APPLICATION FILING RECEIPT MAILED |
| Thursday, April 19, 2012 | ASSIGNED TO EXAMINER |
| Tuesday, April 24, 2012 | NON-FINAL ACTION WRITTEN |
| Thursday, November 1, 2012 | EXAMINER'S AMENDMENT ENTERED |
| Friday, April 27, 2012 | REFUSAL PROCESSED BY MPU |
| Friday, April 27, 2012 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Saturday, May 19, 2012 | REFUSAL PROCESSED BY IB |
| Thursday, October 18, 2012 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Thursday, October 18, 2012 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Thursday, October 18, 2012 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Thursday, November 1, 2012 | EXAMINERS AMENDMENT -WRITTEN |
| Thursday, November 1, 2012 | EXAMINERS AMENDMENT E-MAILED |
| Thursday, November 1, 2012 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
| Wednesday, December 5, 2012 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Wednesday, December 5, 2012 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Tuesday, March 12, 2013 | REGISTERED-PRINCIPAL REGISTER |
| Wednesday, June 12, 2013 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Monday, November 4, 2013 | FINAL DISPOSITION PROCESSED |
| Thursday, November 1, 2012 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Friday, November 16, 2012 | ASSIGNED TO LIE |
| Monday, November 19, 2012 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
| Wednesday, December 5, 2012 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
| Sunday, December 23, 2012 | NOTIFICATION PROCESSED BY IB |
| Tuesday, December 25, 2012 | PUBLISHED FOR OPPOSITION |
| Tuesday, December 25, 2012 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
| Friday, November 30, 2018 | REGISTERED-SEC.71 ACCEPTED |
| Monday, November 4, 2013 | FINAL DISPOSITION NOTICE SENT TO IB |
| Saturday, November 23, 2013 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Friday, May 22, 2015 | NEW REPRESENTATIVE AT IB RECEIVED |
| Thursday, June 23, 2016 | NEW REPRESENTATIVE AT IB RECEIVED |
| Monday, March 12, 2018 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
| Monday, November 5, 2018 | TEAS SECTION 71 RECEIVED |
| Thursday, November 29, 2018 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
| Saturday, March 12, 2022 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED |
| Friday, September 29, 2023 | CANCELLED SECTION 71 |
| Friday, January 19, 2024 | NEW REPRESENTATIVE AT IB RECEIVED |
| Friday, November 30, 2018 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED |
| Friday, September 17, 2021 | INTERNATIONAL REGISTRATION RENEWED |
| Friday, June 14, 2024 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
| Thursday, June 20, 2024 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
| Sunday, July 14, 2024 | TOTAL INVALIDATION PROCESSED BY THE IB |
| Thursday, June 20, 2024 | INVALIDATION PROCESSED |