Serial Number | 86646452 |
Word Mark | FORTERRA |
Filing Date | Saturday, May 30, 2015 |
Status | 705 - PARTIAL SECTION 8 & 15 ACCEPTED AND ACKNOWLEDGED |
Status Date | Wednesday, October 18, 2023 |
Registration Number | 5065230 |
Registration Date | Tuesday, October 18, 2016 |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, April 12, 2016 |
Goods and Services | Building and construction materials, namely, [ brick, ] concrete pipe, pre-cast and pre-stressed concrete pipe, pre-cast molded concrete forms for architectural and structural building components and structures, namely, pre-cast concrete box culverts, drainage storm and sewer manholes and catch basins for attachment to sewer pipes to catch debris, double tees, [ roof and wall units, architectural panels, spandrel and fascia panels, columns, beams, hollow-core planks, parking structure panels, tunnel segments, garage floors, and retaining walls; autoclaved aerated concrete blocks; ] non-metallic water pipes, pipes of cement [ or polyethylene ] ; concrete gravity pipe [ ; concrete pressure pipe; non-metal rigid and semi-rigid bar-wrapped concrete pressure pipe; clay conduits and plastic conduits for drainage and irrigation; building materials, namely, roofing tiles comprised primarily of non-metal elements; non-metallic construction materials, namely, composite panels comprised primarily of a reinforced cement core that is mechanically bonded to steel sheets on both outer surfaces for use in barriers and doors; wall systems consisting of reinforced, dry-stacked, engineered concrete block with insulating core and coated with surface bond cement; waterproofing system comprised of non-metal wall system elements designed to prevent entry of moisture and to prevent entry of moisture and growth of mold ] |
Goods and Services | [ Steel pipes of metal; metal flanges; metal piping components, namely, snap ring joints; metal roofing tile ] |
Goods and Services | [ Concrete structure construction works; brick and aircrete block structure construction works; construction and repair of buildings and structures made of concrete and masonry; technical consultation in the field of building construction ] |
Translation of Words in Mark | The wording "FORTERRA" has no meaning in a foreign language. |
Goods and Services | [ Design and planning of paving systems, drainage systems, surface water control systems, heat exchange systems, and systems for channeling, collection, and utilization of water, namely, storm water pipe, box culvert, manholes and storm water control structures; design and planning of engineered pressure pipe for use in water transmission lines, power plant cooling water systems, sewer force mains, chilled water systems, irrigation networks, treatment plant intake, process, and outfall lines, subaqueous lines, and industrial process lines; design of building blocks and bricks for use in building; design of walling and cladding systems for use in building; design of chimneys, roofing and flue systems for use in building; design and technical engineering services for flooring and precast concrete, including engineered structural flooring and stair solutions, hollow core flooring, and beam and block flooring all for use in building; design of paving materials; engineering services, namely, calculation of U-value for building elements and brick matching ] |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | B - Sec. 8 - Class(es) in a Multiple Class registration |
Class Status Date | Wednesday, October 18, 2023 |
Primary Code | 006 |
First Use Anywhere Date | Thursday, October 8, 2015 |
First Use In Commerce Date | Friday, December 4, 2015 |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Saturday, June 6, 2015 |
Primary Code | 019 |
First Use Anywhere Date | Thursday, October 8, 2015 |
First Use In Commerce Date | Friday, December 4, 2015 |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | B - Sec. 8 - Class(es) in a Multiple Class registration |
Class Status Date | Wednesday, October 18, 2023 |
Primary Code | 037 |
First Use Anywhere Date | Thursday, October 8, 2015 |
First Use In Commerce Date | Sunday, October 18, 2015 |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | B - Sec. 8 - Class(es) in a Multiple Class registration |
Class Status Date | Wednesday, October 18, 2023 |
Primary Code | 042 |
First Use Anywhere Date | Thursday, October 8, 2015 |
First Use In Commerce Date | Sunday, October 18, 2015 |
Party Name | FORTERRA PIPE & PRECAST, LLC |
Party Type | 30 - Original Registrant |
Legal Entity Type | 16 - Limited Liability Company |
Address | Atlanta, GA 30328 |
Party Name | FORTERRA PIPE & PRECAST, LLC |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 16 - Limited Liability Company |
Address | IRVING, TX 75062 |
Party Name | FORTERRA PIPE & PRECAST, LLC |
Party Type | 11 - New Owner Before Publication |
Legal Entity Type | 16 - Limited Liability Company |
Address | IRVING, TX 75062 |
Party Name | HBP Pipe & Precast LLC |
Party Type | 10 - Original Applicant |
Legal Entity Type | 16 - Limited Liability Company |
Address | Irving, TX 75062 |
Event Date | Event Description |
Wednesday, October 18, 2023 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED |
Wednesday, October 18, 2023 | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. |
Wednesday, October 18, 2023 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
Tuesday, April 18, 2023 | TEAS SECTION 8 & 15 RECEIVED |
Thursday, June 23, 2022 | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY |
Thursday, May 19, 2022 | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY |
Monday, October 18, 2021 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED |
Wednesday, July 29, 2020 | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY |
Wednesday, December 7, 2016 | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY |
Tuesday, October 18, 2016 | REGISTERED-PRINCIPAL REGISTER |
Thursday, September 15, 2016 | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED |
Wednesday, September 14, 2016 | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED |
Tuesday, September 6, 2016 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Saturday, August 27, 2016 | STATEMENT OF USE PROCESSING COMPLETE |
Tuesday, August 2, 2016 | USE AMENDMENT FILED |
Thursday, August 25, 2016 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
Tuesday, August 2, 2016 | TEAS STATEMENT OF USE RECEIVED |
Tuesday, June 7, 2016 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
Tuesday, April 12, 2016 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, April 12, 2016 | PUBLISHED FOR OPPOSITION |
Wednesday, March 23, 2016 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Wednesday, March 9, 2016 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Thursday, March 3, 2016 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, March 2, 2016 | EXAMINER'S AMENDMENT ENTERED |
Wednesday, March 2, 2016 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Wednesday, March 2, 2016 | EXAMINERS AMENDMENT E-MAILED |
Wednesday, March 2, 2016 | EXAMINERS AMENDMENT -WRITTEN |
Thursday, February 18, 2016 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, February 18, 2016 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, February 11, 2016 | ASSIGNED TO LIE |
Friday, February 5, 2016 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, January 27, 2016 | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY |
Wednesday, January 20, 2016 | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP |
Tuesday, November 24, 2015 | LETTER OF PROTEST EVIDENCE REVIEWED-NO FURTHER ACTION TAKEN |
Monday, November 23, 2015 | LETTER OF PROTEST EVIDENCE FORWARDED |
Monday, September 14, 2015 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Monday, September 14, 2015 | NON-FINAL ACTION E-MAILED |
Monday, September 14, 2015 | NON-FINAL ACTION WRITTEN |
Friday, September 11, 2015 | ASSIGNED TO EXAMINER |
Saturday, June 6, 2015 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Wednesday, June 3, 2015 | NEW APPLICATION ENTERED |