Serial Number | 88320986 |
Word Mark | FNX-INNOV |
Filing Date | Thursday, February 28, 2019 |
Status | 645 - FINAL REFUSAL - MAILED |
Status Date | Monday, December 2, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | (Based on 44(e)) Consulting services in the field of environmental remediation services for soil and water; Environmental remediation services, namely, treatment of contaminated groundwater and soil; Waste processing; (Based on intent to use) Consulting services in the field of water and waste water treatment for the purpose of maximizing environmental benefits |
Goods and Services | (Based on 44(e)) Advisory services relating to transportation; Advisory services relating to smart mobility, namely, modes of transportation |
Goods and Services | (Based on 44(e)) Construction, repair, and new building of urban, road, rail, airport and port buildings and plant facilities; Construction project management; Building mechanicals services, namely, installation and maintenance of heating, cooling and ventilation systems, electrical systems, plumbing systems, elevators and escalators, and building control systems for building security, environmental monitoring, energy usage and access control; Building inspection and repair of concrete structures; Construction project management services; (Based on intent to use) Consulting services in the field of construction; Hazardous waste clean-up services for contaminated or degraded sites; |
Goods and Services | (Based on 44(e)) Security services for physical dam buildings and structures; (Based on intent to use) Consulting services with respect to building and utility facility security; Providing information in the field of building security |
Goods and Services | (Based on 44(e)) Consulting services in the field of engineering; Mechanical, electrical, civil, chemical, materials and process engineering services; Design and planning of infrastructure development of road, rail, airport and port infrastructure and facilities for others; Real estate planning services, namely, land planning and land surveying; Land-use planning services; Landscape architecture design; Eco-engineering; Laboratory environmental testing services in the field of environmental protection; Feasibility studies, security surveys, environmental studies, security surveys, planning and construction of infrastructure in the fields of hydroelectricity, wind power, thermal power, biomass and biomethanization, power plants, power distribution and transmission and telecommunications; Quality assurance services on job sites and in-plant, namely, quality control for others of materials manufactured in plants and used on job sites for construction projects; Development and design of electricity smart grid networks; Design and development of wireless transmission networks, voice networks and telecommunication automation and control networks; Design and implementation of electric networks for buildings; Energy auditing services for the optimization of efficiency in buildings; Design of environmentally friendly and sustainable buildings; Design of building structures; Scientific study and research in the field of earthquake resistance; Technical audits on buildings to improve energy efficiency and to determine conformity with standards; Design and implementation of telecommunication networks; Microbiological inspection and assessment; Design and implementation of computer networks designed to control building access systems and energy systems; Engineering advice and consultation in the field of energy efficiency; Geology research, geomorphology research; Geotechnical engineering services; Foundation design, namely, civil engineering design of structural foundations; Building design of reservoir structures and dams; Consultation services in the field of soil improvement techniques, assessment and environmental characterizations for environmental benefits; Building mechanicals services, namely, design of heating, cooling and ventilation systems, electrical systems, plumbing systems, elevators and escalators, and building control systems for building security, environmental monitoring, energy usage and access control; Services with respect to environmental management and audit systems, namely, testing, analysis and evaluation of the services of others to determine conformity with environmental management system certification standards (Based on intent to use) Advising on operations, problem monitoring, diagnosis and resolution systems, audit, optimization, change management, critical analysis method, mitigation and correction of processes relating to discharge systems, maintenance, integrity management, surveillance and security systems, the whole in the oil and gas sector |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, March 20, 2019 |
Primary Code | 040 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, March 20, 2019 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 039 - Transport; packaging and storage of goods; travel arrangement. |
US Class Codes | 100, 105 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, March 20, 2019 |
Primary Code | 039 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, March 20, 2019 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 045 - Legal services; security services for the protection of property and individuals; personal and social services rendered by others to meet the needs of individuals. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, March 20, 2019 |
Primary Code | 045 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | FNX-INNOV INC. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Saint-Laurent, QUEBEC H4S1W8 CA |
Event Date | Event Description |
Monday, March 4, 2019 | NEW APPLICATION ENTERED |
Wednesday, March 20, 2019 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Monday, April 29, 2019 | TEAS VOLUNTARY AMENDMENT RECEIVED |
Monday, May 6, 2019 | ASSIGNED TO LIE |
Tuesday, May 7, 2019 | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED |
Thursday, May 9, 2019 | ASSIGNED TO EXAMINER |
Friday, May 17, 2019 | NON-FINAL ACTION WRITTEN |
Friday, May 17, 2019 | NON-FINAL ACTION E-MAILED |
Friday, May 17, 2019 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Monday, November 18, 2019 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Monday, November 18, 2019 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, November 18, 2019 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, December 5, 2019 | SUSPENSION LETTER WRITTEN |
Thursday, December 5, 2019 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Thursday, December 5, 2019 | LETTER OF SUSPENSION E-MAILED |
Friday, June 26, 2020 | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION |
Monday, June 29, 2020 | SUSPENSION INQUIRY WRITTEN |
Monday, June 29, 2020 | INQUIRY TO SUSPENSION E-MAILED |
Monday, June 29, 2020 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED |
Monday, December 28, 2020 | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED |
Friday, January 8, 2021 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, January 8, 2021 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Sunday, January 10, 2021 | SUSPENSION LETTER WRITTEN |
Sunday, January 10, 2021 | SUSPENSION LETTER WRITTEN |
Sunday, January 10, 2021 | LETTER OF SUSPENSION E-MAILED |
Sunday, January 10, 2021 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Wednesday, September 1, 2021 | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION |
Tuesday, September 7, 2021 | SUSPENSION INQUIRY WRITTEN |
Sunday, March 6, 2022 | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED |
Tuesday, September 7, 2021 | INQUIRY TO SUSPENSION E-MAILED |
Tuesday, September 7, 2021 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED |
Thursday, March 10, 2022 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, March 10, 2022 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, March 17, 2022 | SUSPENSION LETTER WRITTEN |
Thursday, March 17, 2022 | LETTER OF SUSPENSION E-MAILED |
Thursday, March 17, 2022 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Tuesday, November 15, 2022 | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION |
Wednesday, November 16, 2022 | SUSPENSION LETTER WRITTEN |
Wednesday, November 16, 2022 | LETTER OF SUSPENSION E-MAILED |
Wednesday, November 16, 2022 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Monday, May 22, 2023 | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION |
Tuesday, May 23, 2023 | SUSPENSION INQUIRY WRITTEN |
Tuesday, May 23, 2023 | INQUIRY TO SUSPENSION E-MAILED |
Tuesday, May 23, 2023 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED |
Tuesday, August 22, 2023 | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED |
Monday, February 12, 2024 | ASSIGNED TO LIE |
Monday, February 12, 2024 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, February 12, 2024 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, February 13, 2024 | SUSPENSION LETTER WRITTEN |
Tuesday, February 13, 2024 | LETTER OF SUSPENSION E-MAILED |
Tuesday, February 13, 2024 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Thursday, August 29, 2024 | INQUIRY TO SUSPENSION E-MAILED |
Thursday, August 29, 2024 | SUSPENSION INQUIRY WRITTEN |
Thursday, August 29, 2024 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED |
Thursday, November 28, 2024 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, November 28, 2024 | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED |
Friday, November 29, 2024 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, December 2, 2024 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Monday, December 2, 2024 | FINAL REFUSAL WRITTEN |
Monday, December 2, 2024 | FINAL REFUSAL E-MAILED |