
| Serial Number | 97773230 |
| Word Mark | FERMACELL |
| Filing Date | Monday, January 30, 2023 |
| Status | 732 - THIRD EXTENSION - GRANTED |
| Status Date | Monday, October 20, 2025 |
| Registration Number | 0000000 |
| Registration Date | NOT AVAILABLE |
| Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
| Published for Opposition Date | Tuesday, February 27, 2024 |
| Goods and Services | Engineered polymer composites for use as building and construction materials, namely, siding, cladding, trim, panels, planks and boards; construction materials, namely, nonmetal exterior and interior siding, cladding, trim, panels, planks and boards; non-metal building and construction materials, namely, fiber gypsum siding, cladding, trim, panels, planks and boards; non-metal architectural mouldings and finish trim; construction materials, namely, non-metal flooring materials; non-metal water-resistant boards and panels for construction; non-reinforced blocks and reinforced beams and building panels made from aerated concrete, normal concrete, porous concrete, foam concrete or calcareous sandstone; cement mixes; Gypsum for use as building materials; sand; lightweight concrete; products for plastering building surfaces, namely, plaster, plaster stops for reinforcing plaster in the corners of plastered walls; adhesive plaster, interior plaster, exterior plaster, repair plaster, normal plaster and thin plaster, the aforesaid products mainly with a lime, cement or gypsum base, with or without plastic admixtures; Mortar for building, namely, dry mortar, normal mortar, thin-bed mortar, levelling mortar, facing mortar; dry concrete; non-metal floor screeds for use in marking concrete and plaster levels for building construction; prefabricated, non-metal wall panels and plaster boards for the erecting of buildings, walls and ceilings; prefabricated, non-metal panels for building made of concrete, calcareous sandstone or plaster fiberboard; non-metal lintels; non-metal U-shaped beam and column encasements used for dry-lining; facing stones being building materials; bottom leveling plaster for floors of gas concrete; plaster fiberboards, in particular for the construction of interiors; plasterboard and gypsum boards; ceiling panels made of plasterboard and gypsum boards; mobile wall partitions, in particular of plaster fiberboards; non-metal ceiling elements, namely, panels for roofs and ceilings; mobile partitions made of plastic fiberboards being building materials; non-metal fire protection and fire proof boards, namely, fire-resistant boards and panels for construction; non-metal tunnel lining panels for building; non-metal air duct tubes and related components, namely, non-metal air duct joints |
| International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
| US Class Codes | 001, 012, 033, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Thursday, February 16, 2023 |
| Primary Code | 019 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | James Hardie Europe GmbH |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 99 - Other |
| Address | Düsseldorf D-40474 DE |
| Party Name | James Hardie Europe GmbH |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 99 - Other |
| Address | Düsseldorf D-40474 DE |
| Event Date | Event Description |
| Thursday, February 2, 2023 | NEW APPLICATION ENTERED |
| Thursday, February 16, 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Thursday, October 26, 2023 | ASSIGNED TO EXAMINER |
| Tuesday, October 31, 2023 | NON-FINAL ACTION WRITTEN |
| Tuesday, October 31, 2023 | NON-FINAL ACTION E-MAILED |
| Tuesday, October 31, 2023 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
| Thursday, January 11, 2024 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Thursday, January 11, 2024 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Friday, January 12, 2024 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Friday, January 19, 2024 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Wednesday, February 7, 2024 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
| Wednesday, February 7, 2024 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
| Tuesday, February 27, 2024 | PUBLISHED FOR OPPOSITION |
| Monday, March 4, 2024 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
| Tuesday, April 23, 2024 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
| Friday, October 18, 2024 | SOU TEAS EXTENSION RECEIVED |
| Friday, October 18, 2024 | SOU EXTENSION 1 FILED |
| Friday, October 18, 2024 | SOU EXTENSION 1 GRANTED |
| Friday, October 18, 2024 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
| Tuesday, April 22, 2025 | SOU TEAS EXTENSION RECEIVED |
| Tuesday, April 22, 2025 | SOU EXTENSION 2 FILED |
| Wednesday, April 23, 2025 | SOU EXTENSION 2 GRANTED |
| Wednesday, April 23, 2025 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
| Monday, October 20, 2025 | SOU TEAS EXTENSION RECEIVED |
| Monday, October 20, 2025 | SOU EXTENSION 3 FILED |
| Monday, October 20, 2025 | SOU EXTENSION 3 GRANTED |
| Tuesday, October 21, 2025 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |