Serial Number | 88294908 |
Word Mark | FERMACELL |
Filing Date | Friday, February 8, 2019 |
Status | 606 - ABANDONED - NO STATEMENT OF USE FILED |
Status Date | Monday, March 13, 2023 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, December 10, 2019 |
Goods and Services | Engineered polymer composites for building and construction in the nature of siding, cladding, panels, planks and boards; construction materials, namely, nonmetal exterior and interior siding panels, non-metal cladding for building, non-metal composite panels, non-metal composite planks and non-metal composite boards; non-metal building and construction materials, namely, fiber gypsum siding, cladding, panels, planks and boards; non-metal architectural mouldings and finish trim; construction materials, namely, non-metal flooring materials; non-metal water-resistant boards and panels for construction; non-reinforced blocks and reinforced beams and building panels made from aerated concrete, normal concrete, porous concrete, foam concrete or calcareous sandstone; cement mixes; gypsum for use as building materials; sand; lightweight concrete; coating products for plastering building surfaces, namely, plaster, plaster stops for reinforcing plaster in the corners of plastered walls; adhesive plaster for building and construction purposes; interior plaster, exterior plaster, repair plaster, normal plaster and thin plaster, the aforesaid products mainly with a lime, cement or gypsum base, with or without plastic admixtures; dry mortar, normal mortar, thin-bed mortar, levelling mortar, facing mortar, and dry concrete, all for use in building and construction; prefabricated, non-metal wall panels and plaster boards for the erecting of buildings, walls and ceilings; prefabricated, non-metal wall panels made of concrete, calcareous sandstone or plaster fiberboard; non-metal lintels; facing stones, in the nature of building stones and artificial stones; bottom leveling plaster for floors of gas concrete; plaster fiberboards, in particular for the construction of interiors; plasterboard and gypsum boards; ceiling panels made of plasterboard and gypsum boards; non-metal ceiling elements, namely, panels for roofs and ceilings; non-metal fire protection and fire proof boards, namely, fire-resistant boards and panels for construction; non-metal building panels, namely, for lining tunnels |
Goods and Services | Installation and repair of siding, cladding, trim, panels, planks and boards for building and construction; consultation in the field of installation, maintenance, and repair of siding, cladding, trim, panels, planks and boards for building and construction; technical consultation in the field of construction, physical maintenance and renovation of buildings; technical support services, namely, technical consultation regarding the installation of building and construction products; customer support services for dealers, distributors, builders and other trade professionals in the nature of technical information provision in the field of installation of building and construction materials; customer support services in the nature of help desk services namely, providing online, telephone and in-person assistance to customers in the appropriate installation of products in the field of building and construction; customer support services and help desk services, namely, providing technical information about the installation of construction materials; providing technical information to customers regarding the installation of building and construction products; building construction information provided online; building construction, remodeling and repair; factory construction; repair work for the restoration of buildings; repair of machines for manufacturing building materials and repair of construction machines; rental of construction machines; construction management and planning |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Monday, March 4, 2019 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Monday, March 4, 2019 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | James Hardie Europe GmbH |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | Düsseldorf 40474 DE |
Party Name | James Hardie Europe GmbH |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | Düsseldorf 40474 DE |
Event Date | Event Description |
Monday, March 13, 2023 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED |
Monday, March 13, 2023 | ABANDONMENT - NO USE STATEMENT FILED |
Tuesday, August 9, 2022 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Monday, August 8, 2022 | SOU EXTENSION 5 GRANTED |
Wednesday, July 27, 2022 | SOU EXTENSION 5 FILED |
Monday, August 8, 2022 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
Wednesday, July 27, 2022 | SOU TEAS EXTENSION RECEIVED |
Tuesday, February 1, 2022 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Friday, January 28, 2022 | SOU EXTENSION 4 GRANTED |
Friday, January 28, 2022 | SOU EXTENSION 4 FILED |
Friday, January 28, 2022 | SOU TEAS EXTENSION RECEIVED |
Thursday, January 27, 2022 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Thursday, January 27, 2022 | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS |
Thursday, January 27, 2022 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Thursday, January 27, 2022 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Thursday, July 8, 2021 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Tuesday, July 6, 2021 | SOU EXTENSION 3 GRANTED |
Tuesday, July 6, 2021 | SOU EXTENSION 3 FILED |
Tuesday, July 6, 2021 | SOU TEAS EXTENSION RECEIVED |
Wednesday, January 27, 2021 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Monday, January 25, 2021 | SOU EXTENSION 2 GRANTED |
Monday, January 25, 2021 | SOU EXTENSION 2 FILED |
Monday, January 25, 2021 | SOU TEAS EXTENSION RECEIVED |
Tuesday, July 21, 2020 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Friday, July 17, 2020 | SOU EXTENSION 1 GRANTED |
Friday, July 17, 2020 | SOU EXTENSION 1 FILED |
Friday, July 17, 2020 | SOU TEAS EXTENSION RECEIVED |
Tuesday, February 4, 2020 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
Tuesday, December 10, 2019 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, December 10, 2019 | PUBLISHED FOR OPPOSITION |
Wednesday, November 20, 2019 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Wednesday, November 6, 2019 | ASSIGNED TO LIE |
Thursday, October 31, 2019 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Saturday, October 19, 2019 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, October 18, 2019 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, October 18, 2019 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Monday, April 22, 2019 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Monday, April 22, 2019 | NON-FINAL ACTION E-MAILED |
Monday, April 22, 2019 | NON-FINAL ACTION WRITTEN |
Monday, April 22, 2019 | ASSIGNED TO EXAMINER |
Monday, March 4, 2019 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Tuesday, February 12, 2019 | NEW APPLICATION ENTERED |