Serial Number | 79245661 |
Word Mark | FABQUIP |
Filing Date | Friday, June 8, 2018 |
Status | 700 - REGISTERED |
Status Date | Tuesday, November 5, 2019 |
Registration Number | 5899575 |
Registration Date | Tuesday, November 5, 2019 |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, August 20, 2019 |
Goods and Services | Non-metallic formwork in the nature of non-metal molds for forming cement posts and walls for buildings, parts of non-metallic formwork in the nature of non-metal slabs for building, non-metallic scaffolding, non-metallic scaffolding apparatus, prefabricated non-metallic work platforms, prefabricated non-metallic climbing architectural columns, non-metallic brackets for gutters, non-metallic concrete construction hardware in the nature of load transfer dowels, pre-formed plastic shear key pockets in the nature of non-metal expansion joints for walls and non-metallic work decks in the nature of prefabricated non-metal work platforms; non-metallic tower scaffolding; all of the foregoing being for use in construction |
Goods and Services | Jacks, namely, pneumatic jacks, hydraulic jacks, electric jacks, and power jacks; hydraulic controllers for machines and electro-hydraulic controller units in the nature of electro-hydraulic controls for machines; tank lifting apparatus, namely, lifting jacks for tanks other than hand-operated; tank lifting equipment, namely, cables for lifts; tank lifting system comprised of lifting jacks for tanks other than hand-operated jacks; self climbing formwork system for use in construction comprised of elevating work platforms |
Goods and Services | Metal formwork in the nature of self climbing metal molds for forming cement posts and walls for building, parts of metal formwork in the nature of slabs of metal for building, form ties of metal, supports of metal, metal scaffolding, metal scaffolding apparatus, prefabricated work platforms of metal, prefabricated climbing architectural columns of metal, metal mounting brackets, metal shear keys in the nature of metal supports, metal hardware climbing columns in the nature of metal supports used to allow jacks connected to the gridwork to climb metal formwork systems, and work decks of metal in the nature of prefabricated metal platforms; all of the foregoing being for use in construction; mechanised perimeter safety screens of metal or predominantly of metal in the nature of wire mesh |
Pseudo Mark | FAB EQUIPMENT |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 23, 2018 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 031, 034, 035 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 23, 2018 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 23, 2018 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Fabquip Construction Systems Pty Ltd |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | AU |
Party Name | Fabquip Construction Systems Pty Ltd |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | AU |
Party Name | Fabquip Construction Systems Pty Ltd |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | AU |
Event Date | Event Description |
Thursday, November 22, 2018 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Friday, November 23, 2018 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Friday, November 23, 2018 | ASSIGNED TO EXAMINER |
Tuesday, November 27, 2018 | APPLICATION FILING RECEIPT MAILED |
Wednesday, December 19, 2018 | NON-FINAL ACTION WRITTEN |
Thursday, December 20, 2018 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Saturday, January 5, 2019 | REFUSAL PROCESSED BY MPU |
Saturday, January 5, 2019 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Friday, January 25, 2019 | REFUSAL PROCESSED BY IB |
Thursday, April 25, 2019 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Thursday, April 25, 2019 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, April 25, 2019 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, July 10, 2019 | EXAMINERS AMENDMENT -WRITTEN |
Wednesday, July 10, 2019 | EXAMINERS AMENDMENT E-MAILED |
Wednesday, July 10, 2019 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Wednesday, July 10, 2019 | EXAMINER'S AMENDMENT ENTERED |
Wednesday, July 10, 2019 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Thursday, July 18, 2019 | ASSIGNED TO LIE |
Wednesday, July 31, 2019 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Wednesday, July 31, 2019 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, July 31, 2019 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Friday, August 16, 2019 | NOTIFICATION PROCESSED BY IB |
Tuesday, August 20, 2019 | PUBLISHED FOR OPPOSITION |
Tuesday, August 20, 2019 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, November 5, 2019 | REGISTERED-PRINCIPAL REGISTER |
Wednesday, February 5, 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Friday, February 28, 2020 | FINAL DISPOSITION PROCESSED |
Friday, February 28, 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
Friday, March 20, 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Tuesday, November 5, 2024 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |