
| Serial Number | 79245305 |
| Word Mark | EXYTE |
| Filing Date | Tuesday, July 31, 2018 |
| Status | 700 - REGISTERED |
| Status Date | Tuesday, October 29, 2019 |
| Registration Number | 5893739 |
| Registration Date | Tuesday, October 29, 2019 |
| Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
| Published for Opposition Date | Tuesday, August 13, 2019 |
| Goods and Services | Building construction supervision, assembly services relating to the installation and installation services in the field of building technology and process technology installations for air conditioning technology, clean room technology, building technology, electrical engineering, supply technology, sanitation technology, environmental control, computerization and media supply purposes; maintenance in the field of repair and cleaning of semi-conductor factories; construction of semi-conductor factories, assembly services relating to the installation and installation services relating to the building of semi-conductor factories; installation and assembly services relating to the installation of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus; implementation of maintenance and inspection works in the context of maintenance and inspection intervals stipulated by the manufacturer and repair and maintenance of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus; assembly services relating to the installation and installation of environmental protection apparatus and devices for existing factories |
| Goods and Services | Technical planning of building technology and process technology installations for the air conditioning technology, clean room technology, building technology, electrical engineering, supply technology, sanitation technology, environmental control, computerization and media supply purposes; performance of technical inspections of statutory operability of heating, refrigerating, air conditioning, drying, ventilating, extraction and separating installations and apparatus; building technology services, namely, performance of technical inspections of operability of building technology installations and of technical production and process flow; technical planning and consultancy therefor relating to implementation of production process and flow in the field of microelectronics, the pharmaceutical industry and the food industry; technical planning and consultancy therefor relating to design and engineering of environmentally-friendly microelectronics; technological consultancy for the design and engineering of environmentally-friendly microelectronics; technical consultancy in the redesigning of semi-conductor factories; technical consultancy in the fields of energy measurement for improving ecological efficiency and energy saving and recycling technology; technical planning relating to the design and engineering of semi-conductor factories; technical planning, performance of technical inspection, as well as certification of clean rooms and all types of technical building equipment at the stages of planning, installation, function and performance, and of the documentation therefore in the context of technical project management and performance of technical inspections; technical planning relating to the design and engineering of building and process technology installations |
| Goods and Services | Electronic apparatus and instruments for controlling, regulating and monitoring heating, air conditioning and ventilating installations for use in clean room installations; electronic control, regulating and monitoring apparatus and instruments, namely, thermostats, monitors and recording devices, measuring and control devices for pressure, temperature, consumption, and speed, all for control and monitoring of building and supply components, namely, air conditioners, clean rooms, clean air suppliers, and filter fan units; computers for monitoring and/or automating building control technology |
| Goods and Services | Fans, filters for the industrial air purification, air filter ventilator units, lights, ventilating apparatus for air conditioning as well as air conditioning apparatus, all being for use in clean rooms, climatic chambers, clean room ceilings, rotation locks and tunnel locks; all the aforementioned goods fitted to the use in grid ceilings, walls, floors, covering plates and partitions; heating and air conditioning installations for building technology; refrigerating, heating, drying and ventilating installations, equipment and apparatus; air conditioning equipment and apparatus and installations consisting thereof; dust, solvent vapour and oil mist extraction and separating apparatus and installations, all being for use in clean room installations or for use in the treatment of atmospheric gases; fans for the aforementioned goods |
| International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
| US Class Codes | 021, 023, 026, 036, 038 |
| Class Status Code | 6 - Active |
| Class Status Date | Monday, November 19, 2018 |
| Primary Code | 009 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
| US Class Codes | 013, 021, 023, 031, 034 |
| Class Status Code | 6 - Active |
| Class Status Date | Monday, November 19, 2018 |
| Primary Code | 011 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 037 - Building construction; repair; installation services. |
| US Class Codes | 100, 103, 106 |
| Class Status Code | 6 - Active |
| Class Status Date | Monday, November 19, 2018 |
| Primary Code | 037 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
| US Class Codes | 100, 101 |
| Class Status Code | 6 - Active |
| Class Status Date | Monday, November 19, 2018 |
| Primary Code | 042 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | Exyte GmbH |
| Party Type | 31 - New Owner After Registration |
| Legal Entity Type | 16 - Limited Liability Company |
| Address | DE |
| Party Name | Exyte GmbH |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 09 - Joint Stock Company |
| Address | DE |
| Party Name | Exyte AG |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 09 - Joint Stock Company |
| Address | DE |
| Party Name | Exyte AG |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 09 - Joint Stock Company |
| Address | DE |
| Event Date | Event Description |
| Thursday, November 15, 2018 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
| Monday, November 19, 2018 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Monday, November 19, 2018 | ASSIGNED TO EXAMINER |
| Tuesday, November 20, 2018 | NON-FINAL ACTION WRITTEN |
| Wednesday, November 21, 2018 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Friday, November 23, 2018 | APPLICATION FILING RECEIPT MAILED |
| Tuesday, December 4, 2018 | REFUSAL PROCESSED BY MPU |
| Tuesday, December 4, 2018 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Saturday, January 5, 2019 | REFUSAL PROCESSED BY IB |
| Thursday, January 24, 2019 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
| Friday, February 1, 2019 | NEW REPRESENTATIVE AT IB RECEIVED |
| Friday, April 19, 2019 | NEW REPRESENTATIVE AT IB RECEIVED |
| Tuesday, June 4, 2019 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Tuesday, June 4, 2019 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Wednesday, June 5, 2019 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Monday, June 10, 2019 | FINAL REFUSAL WRITTEN |
| Tuesday, June 11, 2019 | FINAL REFUSAL MAILED |
| Monday, June 24, 2019 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
| Monday, June 24, 2019 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, June 25, 2019 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Monday, July 1, 2019 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Thursday, July 11, 2019 | ASSIGNED TO LIE |
| Wednesday, July 24, 2019 | NOTICE OF PUBLICATION |
| Wednesday, July 24, 2019 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Wednesday, July 24, 2019 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Friday, August 9, 2019 | NOTIFICATION PROCESSED BY IB |
| Tuesday, August 13, 2019 | PUBLISHED FOR OPPOSITION |
| Tuesday, October 29, 2019 | REGISTERED-PRINCIPAL REGISTER |
| Wednesday, January 29, 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Friday, February 21, 2020 | FINAL DISPOSITION PROCESSED |
| Saturday, February 22, 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
| Friday, March 13, 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Saturday, May 8, 2021 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
| Friday, December 20, 2024 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
| Friday, November 14, 2025 | NEW REPRESENTATIVE AT IB RECEIVED |