Serial Number | 87590818 |
Word Mark | EXPRESS INTEGRATED TECHNOLOGIES |
Filing Date | Wednesday, August 30, 2017 |
Status | 606 - ABANDONED - NO STATEMENT OF USE FILED |
Status Date | Monday, October 18, 2021 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, July 17, 2018 |
Disclaimer with Predetermined Text | "INTEGRATED TECHNOLOGIES" |
Goods and Services | Environmental control system for industrial applications comprised of combustion chambers, gas and electric furnaces, gas burners, incinerators, gas and electric boilers, water heaters, heat transfer fluid heaters, waste gas heat exchangers not being parts of machines, waste heat recovery units, dryers used for the removal of vapor contaminants from compressed air and gases, electric heaters and electric boilers, and also including electrical controlling devices; Heating apparatus for industrial use, namely, process tubular fired heaters, direct fired heaters, refining and petrochemical furnaces, waste heat recovery units and heat recovery units not being parts of machines; steam generating apparatus comprised of waste heat boilers for generating saturated or superheated steam for process use, cogeneration, combined cycle or other power generation cycles, industrial boilers, carbon monoxide industrial boilers, flue gas coolers, and waste heat recovery units for recovering heat from incineration, petrochemical, and refining operations; Distillation apparatus and installations not for scientific purposes sold as a unit for process distillation, comprised of atmospheric and vacuum distillation furnaces, process tubular fired heaters, and direct fired heaters; Waste heat recovery boilers and units for use in enhanced oil recovery, cyclical steam stimulation, and steam assisted gravity drainage (SAGD) applications; Heating boilers, namely, waste heat boilers for heating, fire packaged watertube boilers for heating, custom and specialty steam boilers for heating, once through steam generators, and heat recovery steam generators, for enhanced oil recovery, cyclical steam stimulation, and steam assisted gravity drainage (SAGD) applications; Waste heat recovery boilers for use in petrochemical plants and heat recovery steam generators to recover waste heat from gas turbines, all for use in producing saturated or superheated steam for process, cogeneration, combined cycle, or electric power generation |
Goods and Services | Installation, maintenance, and repair of power and energy generation machinery and equipment; Consultation services in the field of installation, maintenance, and repair of power and energy generation machinery and equipment; Installation, maintenance, repair, and renovation of steam and gas turbine generators and their components and parts; Installation, maintenance, repair, and renovation of heat recovery steam generators, heat exchangers, boilers, once through steam generators and steam assisted gravity drainage (SAGD) units and their components and parts |
Goods and Services | Contract manufacturing for others in the field of heat recovery steam generators, heat exchangers, boilers, once through steam generators and steam assisted gravity drainage (SAGD) units; Custom construction of heat recovery steam generators, heat exchangers, boilers, once through steam generators and steam assisted gravity drainage (SAGD) units for others; Fabrication of heat recovery steam generators, heat exchangers, boilers, once through steam generators and steam assisted gravity drainage (SAGD) units for others; Custom manufacture of combustion systems for industrial applications, vapor recovery systems and marine handling systems |
Goods and Services | Process design for others in the field of industrial heating and cooling apparatus and machinery; Custom design and engineering services in the field heat recovery steam generators, heat exchangers, boilers, once through steam generators and steam assisted gravity drainage (SAGD) units; Power and energy generation machinery and equipment inspection services |
International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
US Class Codes | 013, 021, 023, 031, 034 |
Class Status Code | 6 - Active |
Class Status Date | Friday, September 8, 2017 |
Primary Code | 011 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, September 8, 2017 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, September 8, 2017 |
Primary Code | 040 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Friday, September 8, 2017 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Innova Global Ltd. |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 03 - Corporation |
Address | Calgary, AB T2G2W3 CA |
Party Name | Innova Global Ltd. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Calgary, AB T2G2W3 CA |
Event Date | Event Description |
Monday, October 18, 2021 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED |
Monday, October 18, 2021 | ABANDONMENT - NO USE STATEMENT FILED |
Friday, March 26, 2021 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Thursday, March 25, 2021 | EXTENSION 5 GRANTED |
Wednesday, March 10, 2021 | EXTENSION 5 FILED |
Thursday, March 25, 2021 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
Wednesday, March 10, 2021 | TEAS EXTENSION RECEIVED |
Monday, March 8, 2021 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Monday, March 8, 2021 | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS |
Monday, March 8, 2021 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Monday, March 8, 2021 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Saturday, September 5, 2020 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Thursday, September 3, 2020 | EXTENSION 4 GRANTED |
Thursday, September 3, 2020 | EXTENSION 4 FILED |
Thursday, September 3, 2020 | TEAS EXTENSION RECEIVED |
Thursday, February 13, 2020 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Tuesday, February 11, 2020 | EXTENSION 3 GRANTED |
Tuesday, February 11, 2020 | EXTENSION 3 FILED |
Tuesday, February 11, 2020 | TEAS EXTENSION RECEIVED |
Tuesday, September 10, 2019 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Saturday, September 7, 2019 | EXTENSION 2 GRANTED |
Saturday, September 7, 2019 | EXTENSION 2 FILED |
Saturday, September 7, 2019 | TEAS EXTENSION RECEIVED |
Wednesday, September 4, 2019 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Wednesday, September 4, 2019 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Wednesday, March 6, 2019 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Monday, March 4, 2019 | EXTENSION 1 GRANTED |
Monday, March 4, 2019 | EXTENSION 1 FILED |
Monday, March 4, 2019 | TEAS EXTENSION RECEIVED |
Tuesday, September 11, 2018 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
Monday, July 23, 2018 | ASSIGNED TO EXAMINER |
Tuesday, July 17, 2018 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, July 17, 2018 | PUBLISHED FOR OPPOSITION |
Wednesday, June 27, 2018 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Thursday, June 14, 2018 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Tuesday, June 12, 2018 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Tuesday, June 12, 2018 | EXAMINER'S AMENDMENT ENTERED |
Tuesday, June 12, 2018 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Tuesday, June 12, 2018 | EXAMINERS AMENDMENT E-MAILED |
Tuesday, June 12, 2018 | EXAMINERS AMENDMENT -WRITTEN |
Friday, June 8, 2018 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, June 7, 2018 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, June 7, 2018 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Monday, December 11, 2017 | COMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED |
Monday, December 11, 2017 | ASSIGNED TO LIE |
Monday, December 11, 2017 | NOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED |
Monday, December 11, 2017 | EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED |
Monday, December 11, 2017 | EXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED |
Tuesday, December 5, 2017 | ASSIGNED TO EXAMINER |
Friday, September 8, 2017 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Saturday, September 2, 2017 | NEW APPLICATION ENTERED IN TRAM |