Serial Number | 79354221 |
Word Mark | ENGINEERING GRADE AR |
Filing Date | Friday, August 26, 2022 |
Status | 602 - ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE |
Status Date | Monday, March 4, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Optical position tracking apparatus; optical position tracking software; surveying apparatus and instruments; apparatus, tools and instruments for setting out a construction site [surveying and engineering apparatus, tools and instruments]; protective helmets; builders' helmets incorporating one or more position detection sensors; protective helmets incorporating an augmented reality display, including augmented reality glasses; augmented reality hardware; augmented reality glasses and headsets; augmented reality software; augmented reality software for integrating electronic data, including electronic building information model data, with real world environments, including real world construction sites; augmented reality helmets; augmented reality headsets; augmented reality computer hardware; head mounted augmented reality displays; augmented reality hardware; augmented reality glasses and headsets; optical position tracking apparatus; augmented reality software; augmented reality software for integrating electronic data, including electronic building information model data, with real world environments, including real world construction sites; optical position tracking software; surveying apparatus and instruments; apparatus, tools and instruments for setting out a construction site [surveying and engineering apparatus, tools and instruments]; protective helmets; builders' helmets incorporating one or more position detection sensors; protective helmets incorporating an augmented reality display, including augmented reality glasses |
Goods and Services | Building construction consultancy; building construction advisory services; building construction supervision services for building projects; providing online information relating to building construction; advisory services relating to building construction; providing information relating to building construction; building inspection [in the course of building construction]; consultation in building construction supervision; consultancy relating to residential and building construction; information services relating to the construction of buildings; consultancy services relating to the construction of buildings; rental of apparatus for use in the construction of buildings; on site project management relating to the construction of buildings; providing information relating to the construction, repair and maintenance of buildings; advisory services relating to the construction of buildings and other structures |
Goods and Services | Surveying and engineering services; construction site engineering and surveying services; construction site setting out services [engineering and surveying services]; consultancy services relating to setting out a construction site [engineering and surveying services]; development of augmented reality software for use on construction sites; hosting services, software as a service, and rental of software for augmented reality visualisation; software as a service [SaaS] services featuring software for augmented reality visualisation; software as a service [SaaS] services featuring augmented reality software for simulation; software as a service [SaaS] services featuring virtual and augmented reality software |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 4, 2022 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 4, 2022 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 4, 2022 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | XYZ Reality Limited |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | GB |
Event Date | Event Description |
Monday, June 19, 2023 | NON-FINAL ACTION WRITTEN |
Thursday, November 3, 2022 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Friday, November 4, 2022 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Tuesday, November 8, 2022 | APPLICATION FILING RECEIPT MAILED |
Tuesday, June 13, 2023 | ASSIGNED TO EXAMINER |
Tuesday, June 20, 2023 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Saturday, July 8, 2023 | NEW REPRESENTATIVE AT IB RECEIVED |
Monday, July 24, 2023 | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW |
Monday, March 4, 2024 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
Wednesday, April 3, 2024 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Tuesday, July 25, 2023 | NON-FINAL ACTION WRITTEN |
Wednesday, July 26, 2023 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Saturday, August 19, 2023 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Saturday, August 19, 2023 | REFUSAL PROCESSED BY MPU |
Tuesday, September 12, 2023 | REFUSAL PROCESSED BY IB |
Monday, March 4, 2024 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
Monday, March 4, 2024 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
Wednesday, April 3, 2024 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Monday, April 22, 2024 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Wednesday, March 5, 2025 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Wednesday, March 5, 2025 | FINAL DISPOSITION NOTICE SENT TO IB |
Friday, February 21, 2025 | NEW REPRESENTATIVE AT IB RECEIVED |