Serial Number | 90440007 |
Word Mark | ENERGY QUARTERBACK |
Filing Date | Thursday, December 31, 2020 |
Status | 733 - FOURTH EXTENSION - GRANTED |
Status Date | Monday, June 10, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, September 27, 2022 |
Goods and Services | Production of energy in buildings via renewable resources for use in facilitating the cyber secure and optimal use of solar and storage systems to power all buildings and the power grid, all of the aforementioned for the purposes of isolating electrical power from the Grid, Solar, and Bi-directional chargers into a microgrid; generation of energy for the purposes of isolating electrical power from the Grid, Solar, and Bi-directional chargers into a microgrid, namely, conversion of solar and stored DC power into facility-wide variable frequency AC power for greater electrical appliance and device energy efficiency and run time |
Goods and Services | Apparatuses which transform solar and storage systems in buildings into a microgrid, namely, energy efficient apparatus systems comprised of downloadable renewable energy interface software and downloadable buffer and control software for controlling and regulating power and loads, electrical integrated control systems for use in buildings the field of electric microgrid energy, Electrical controllers comprising hardware with embedded software for use in managing a building's power from the Grid, EV Bi-directional chargers, Solar and Energy Storage and to monitor and control the function and status of comprised of the controller, batteries, power conversion systems, power meters, and an energy sources, and building energy control system for balancing energy resources with electrical demand in order to conserve energy comprised of computers, recorded operating software, inverters, electrical switches, switchgear, circuit breakers, and also comprising electricity generators, all for the purposes of generating the highest energy efficiency, isolating electrical power from the Grid, Solar, EV Bi-directional Charger and Energy Storage systems from buildings into a microgrid, and resilient self-consumption of renewable energy and Grid balancing on demand |
NOT AVAILABLE | "ENERGY" |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, August 25, 2022 |
Primary Code | 040 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, August 25, 2022 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Neworld.Energy, LLC |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 16 - Limited Liability Company |
Address | Reno, NV 89509 |
Party Name | Neworld.Energy, LLC |
Party Type | 10 - Original Applicant |
Legal Entity Type | 16 - Limited Liability Company |
Address | Reno, NV 89509 |
Event Date | Event Description |
Monday, January 4, 2021 | NEW APPLICATION ENTERED |
Monday, March 29, 2021 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Wednesday, July 7, 2021 | ASSIGNED TO EXAMINER |
Friday, July 16, 2021 | NON-FINAL ACTION WRITTEN |
Friday, July 16, 2021 | NON-FINAL ACTION E-MAILED |
Friday, July 16, 2021 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Wednesday, January 12, 2022 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, January 12, 2022 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, January 13, 2022 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, March 9, 2022 | ASSIGNED TO EXAMINER |
Friday, May 6, 2022 | FINAL REFUSAL WRITTEN |
Friday, May 6, 2022 | FINAL REFUSAL E-MAILED |
Friday, May 6, 2022 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Thursday, August 25, 2022 | EXAMINERS AMENDMENT -WRITTEN |
Thursday, August 25, 2022 | EXAMINERS AMENDMENT E-MAILED |
Thursday, August 25, 2022 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Thursday, August 25, 2022 | EXAMINER'S AMENDMENT ENTERED |
Thursday, August 25, 2022 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, September 7, 2022 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Tuesday, September 27, 2022 | PUBLISHED FOR OPPOSITION |
Tuesday, September 27, 2022 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, November 22, 2022 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
Monday, May 22, 2023 | SOU TEAS EXTENSION RECEIVED |
Monday, May 22, 2023 | SOU EXTENSION 1 FILED |
Monday, May 22, 2023 | SOU EXTENSION 1 GRANTED |
Wednesday, May 24, 2023 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Monday, December 25, 2023 | ABANDONMENT - NO USE STATEMENT FILED |
Tuesday, December 26, 2023 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED |
Thursday, February 15, 2024 | PETITION TO REVIVE-GRANTED |
Thursday, February 15, 2024 | TEAS PETITION TO REVIVE RECEIVED |
Thursday, February 15, 2024 | TEAS PETITION TO REVIVE RECEIVED |
Thursday, February 15, 2024 | NOTICE OF REVIVAL - E-MAILED |
Friday, February 16, 2024 | SOU EXTENSION RECEIVED WITH TEAS PETITION |
Wednesday, May 22, 2024 | SOU EXTENSION 3 FILED |
Monday, June 10, 2024 | SOU EXTENSION 2 GRANTED |
Monday, June 10, 2024 | SOU EXTENSION 2 FILED |
Monday, June 10, 2024 | SOU EXTENSION 3 GRANTED |
Monday, June 10, 2024 | SOU TEAS EXTENSION RECEIVED |
Monday, June 10, 2024 | SOU EXTENSION 4 GRANTED |
Monday, June 10, 2024 | SOU EXTENSION 4 FILED |
Thursday, November 14, 2024 | TEAS STATEMENT OF USE RECEIVED |