Serial Number | 79102890 |
Word Mark | EISENMANN |
Filing Date | Tuesday, May 17, 2011 |
Status | 706 - SECTION 71 ACCEPTED |
Status Date | Saturday, January 21, 2023 |
Registration Number | 4162992 |
Registration Date | Tuesday, June 26, 2012 |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, April 10, 2012 |
Goods and Services | Installations for cleaning waste air, in particular adsorption installations and condensation installations; machines and installations assembled therefrom for materials-handling technology, in particular circular conveyors, power-and-free conveyors,[ electric telpher railways, electric pallet tracks,] driver-less transport systems, pallet-conveying systems, belt and plate transport systems, roller track systems, under-floor conveyors, cross-bar conveyors, multiple-strand chain conveyors, towing, carrying and accumulating chain conveyors, vertical transport conveyors, motor-driven raising, lowering and tilting devices[, motor-driven devices for feeding and dispensing workpieces,] sorting installations for packages and packs, warehouse pre-zone conveyors,[ assembly and testing belts, assembly bench circular conveyors; gantry robots as machines;] automatic handling systems; [machines for piece-goods; distributing, sorting and order-picking machines; ]installations and motor-driven devices for warehousing technology, namely, motor-driven storage and retrieval machines; [enameling installations, consisting of pre-treatment installations, coating installations and conveyors; ]lifting beam stores as machine parts; machines and installations assembled therefrom for the surface treatment and surface-coating of metals, in articular run-through and timed-cycle washing machines, powder coating installations,[ electrode position painting installations,] spraying and dipping installations for conventional paints and aqueous paints, spray stands,[ splash-boards,] spray booths,[ whirl-sintering installations, electron beam hardening installations; ] installations for pre-treating areas prior to coating, in particular for flat and rolled metal sheets; complete painting lines, consisting of pre-treatment installations and coating installations and conveyors;[ machines and installations assembled therefrom for the surface-coating of tubes made of different materials; machines and installations assembled therefrom for coating electrical components with casting resin; coating and laminating machines;] paint-stripping installations, essentially consisting of chemical paint-stripping basins and high-pressure paint-stripping machines; machines and installations assembled therefrom for painting wooden and plastic parts; motor-driven handling appliances and robots for loading and unloading firing supports; oil/water separating installations; installations for separating solvents from water, installations for aqueous paint recycling in the form of filtration and mechanical recuperation via special overspray-collecting systems[; installations for printing ink recycling in the form of filtration] |
Goods and Services | [Drying installations for sawn timber;] Installations for the cleansing of exhaust air, in particular installations with regenerative, thermal and catalytic combustion; installations for the production and thermal use of biogases; installations for the conditioning and cleaning of water, in particular softening installations, desalination installations, sedimentation installations, filtration installations, flocculation and precipitation installations, flotation installations, emulsion-splitting installations, ultrafiltration installations, reverse-osmosis installations, ion-exchanger installations, detoxification and neutralisation installations; installations for recycling valuable substances and energy from industrial wastes and biomasses, namely, installations for the pyrolysis, low-temperature carbonization and combustion of industrial wastes and biomasses; high-temperature firing kilns for ceramic products, in particular for sanitary ware, porcelain ware, structural ceramics and technical ceramics; dryers and firing kilns for the ceramics industry; ovens for the drying of surface coating; [enameling installations, consisting of enamel-dryers, enamel ovens and waste air installations;] complete painting lines, consisting of paint ovens, waste air and water installations; drying and curing machines for non-metallic materials and installations assembled therefrom; paint-stripping installations, essentially consisting of paint-stripping ovens |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 031, 034, 035 |
Class Status Code | 6 - Active |
Class Status Date | Friday, October 14, 2011 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
US Class Codes | 013, 021, 023, 031, 034 |
Class Status Code | 6 - Active |
Class Status Date | Friday, October 14, 2011 |
Primary Code | 011 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Eisenmann GmbH |
Party Type | 31 - New Owner After Registration |
Legal Entity Type | 99 - Other |
Address | DE |
Party Name | Eisenmann SE |
Party Type | 30 - Original Registrant |
Legal Entity Type | 94 - NOT AVAILABLE |
Address | Böblingen 71032 DE |
Party Name | EISENMANN AG |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | DE |
Party Name | EISENMANN AG |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | DE |
Event Date | Event Description |
Tuesday, October 31, 2023 | PARTIAL INVALIDATION PROCESSED BY THE IB |
Wednesday, September 27, 2023 | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Wednesday, September 27, 2023 | INVALIDATION PROCESSED |
Thursday, September 21, 2023 | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED |
Saturday, January 21, 2023 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED |
Saturday, January 21, 2023 | REGISTERED-SEC.71 ACCEPTED |
Friday, January 6, 2023 | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED |
Wednesday, July 6, 2022 | OFFICE ACTION ISSUED POU1 |
Tuesday, July 5, 2022 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
Monday, June 27, 2022 | TEAS SECTION 71 RECEIVED |
Friday, June 17, 2022 | NEW REPRESENTATIVE AT IB RECEIVED |
Saturday, June 26, 2021 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED |
Friday, June 4, 2021 | INTERNATIONAL REGISTRATION RENEWED |
Friday, April 23, 2021 | CHANGE OF OWNER RECEIVED FROM IB |
Saturday, February 16, 2019 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED |
Saturday, February 16, 2019 | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. |
Friday, February 1, 2019 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
Wednesday, December 26, 2018 | TEAS SECTION 71 & 15 RECEIVED |
Monday, June 26, 2017 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
Thursday, September 17, 2015 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
Sunday, April 20, 2014 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Sunday, December 2, 2012 | NOTIFICATION PROCESSED BY IB |
Thursday, November 15, 2012 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Monday, October 22, 2012 | FINAL DISPOSITION NOTICE SENT TO IB |
Monday, October 22, 2012 | FINAL DISPOSITION PROCESSED |
Wednesday, September 26, 2012 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, June 26, 2012 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, April 10, 2012 | PUBLISHED FOR OPPOSITION |
Wednesday, April 4, 2012 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, April 4, 2012 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, March 21, 2012 | NOTICE OF PUBLICATION |
Tuesday, March 6, 2012 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Tuesday, March 6, 2012 | ASSIGNED TO LIE |
Wednesday, February 15, 2012 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Tuesday, February 14, 2012 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, February 14, 2012 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, February 14, 2012 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Saturday, November 12, 2011 | REFUSAL PROCESSED BY IB |
Monday, October 24, 2011 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Monday, October 24, 2011 | REFUSAL PROCESSED BY MPU |
Sunday, October 23, 2011 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Saturday, October 22, 2011 | NON-FINAL ACTION WRITTEN |
Tuesday, October 18, 2011 | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW |
Tuesday, October 18, 2011 | APPLICATION FILING RECEIPT MAILED |
Saturday, October 15, 2011 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Friday, October 14, 2011 | NON-FINAL ACTION WRITTEN |
Friday, October 14, 2011 | ASSIGNED TO EXAMINER |
Friday, October 14, 2011 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, October 13, 2011 | SN ASSIGNED FOR SECT 66A APPL FROM IB |