Serial Number | 79070875 |
Word Mark | EDSCHA TRAILER SYSTEMS |
Filing Date | Thursday, June 18, 2009 |
Status | 404 - IR CANCELLED - US REGISTRATION CANCELLED |
Status Date | Wednesday, June 19, 2019 |
Registration Number | 4215876 |
Registration Date | Tuesday, October 2, 2012 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, July 17, 2012 |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Disclaimer with Predetermined Text | "TRAILER SYSTEMS" |
Description of Mark | The mark consists of a curved band partially enclosing the wording "EDSCHA". The wording "TRAILER SYSTEMS" appears below the wording "EDSCHA". |
Goods and Services | Covering frames of metal with tarpaulins for transportable containers; parts of covering frames of metal with tarpaulins for transportable containers, namely, tarpaulin rollers being metal rollers, end carriages with automatic foldup, tie rods, gantry beams, automatic foldup, ramps, stanchion curtain roller carrier, ramp locking devices, fixing discs, pull straps, metal hooks, tarpaulin fasteners, namely, metal fasteners being rivets, metal clips, tarpaulin clamp being metal clamps, roller carriage, roof reinforcement, metal brackets, end carriages, retaining plate, automatic foldup with gas spring, locking wedge, bows, aluminum beams, slider adapter, steel catch, belt roller, guide tube, latching sheet, stanchion roller carriage, roller carrier, cross bar carrier, equalizing linkage, clamping profile, carriage bracket being metal bracket, axle TIR, round head metal screw, hexagonal metal screw, hexagonal metal nut, blind rivet being metal rivet, twisting clamp being metal clamps, joints, ring pin, rail U, rollers, lens head screws being metal screws, gas spring, link pickup, bulkhead bow bracket, bulkhead bow holder, pillar connection, rail frame, across tube, connecting pins, locking pins, distance tubes, drop latch being metal latches, rectangular tubing being metal tubing, bow end, corner plate, strut, strut bearing, gibbet connection, rail extension, splint, cross bar, ring nut, slip-on roller, tarpaulin holder, pillar locking device, lateral tie bar, rail locking pins, reception tube, allen screw being metal screws, metal washer, eyelet, flange sleeve, raised countersunk head screw being metal screws, protecting cap, tube clip pin, driveshaft, drive unit, gear motor, sliding hub, motor bracket, spur wheel, overload safety switch, spring dowel sleeve, box for safety clutch, connecting cable, bulkhead cable, rivet, tarpaulin bracket, tube bow, bow loop, frames, bulldog grip, recessed grip, plane spring, plane nuts being metal nuts, bottom locking handle, pan head screw being metal screws, end plug, guard, metal bolt, spacer, column crossmember, frame reinforcers, frame arms, wall closure, fillister head screw being metal screws, stanchion pocket, tension rope, safety chain, rope, rope connection, expander rope, safety rope, pull rope, PVC pelmet |
Goods and Services | Superstructures for land vehicles, namely, structural parts, particular for trucks, trailers, railway wagons; covering frame kits for land vehicles and comprised of sliding pillars being structural parts of sliding roof systems, front walls and rear frames, lifting systems comprised of gas springs, in particular for trucks, trailers, railway wagons; fitted sliding covers for land vehicles, in particular for trucks, trailers, railway wagons; fitted sliding hoop-type covers for land vehicles, in particular for trucks, trailers, railway wagons; fitted component parts for land vehicles, in particular for trucks, trailers, railway wagons and tarpaulin superstructures, namely, longitudinal supports, hoops, rollers, roller carriages and stanchions; fitted covers for land vehicles, in particular for trucks, trailers, railway wagons; covering systems for land vehicles, comprised of rail frames, end running parts with lifting function and end bow, roller carriage, tarpaulin roof, wire rope, tension lock, rope clamp, cable eye stiffeners, turnbuckles, gantry beam, drip moulding, welting, blind rivet, tarpaulin roller, rail lock, in particular for trucks, trailers, railway wagons |
Goods and Services | Covering frames of plastic with tarpaulins for transportable containers; component parts of covering frames of plastic with tarpaulins for transportable containers |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, May 3, 2019 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 012 - Vehicles; apparatus for locomotion by land, air, or water. |
US Class Codes | 019, 021, 023, 031, 035, 044 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, May 3, 2019 |
Primary Code | 012 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 020 - Furniture, mirrors, picture frames; goods (not included in other classes) of wood, cork, reed, cane, wicker, horn, bone, ivory, whalebone, shell, amber, mother-of-pearl, meerschaum and substitutes for all these materials, or of plastics. |
US Class Codes | 002, 013, 022, 025, 032, 050 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, May 3, 2019 |
Primary Code | 020 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | VBG GROUP AB (publ) |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | SE |
Party Name | VBG GROUP AB |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | SE-462 28 Vänersborg SE |
Party Name | VBG GROUP AB |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | SE-462 28 Vänersborg SE |
Event Date | Event Description |
Monday, February 10, 2020 | IRREGULARITY ON INVALIDATION RECEIVED FROM IB |
Monday, January 27, 2020 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Monday, January 27, 2020 | INVALIDATION PROCESSED |
Friday, January 3, 2020 | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED |
Friday, January 3, 2020 | DEATH OF INTERNATIONAL REGISTRATION |
Friday, January 3, 2020 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
Friday, May 3, 2019 | CANCELLED SECTION 71 |
Thursday, April 25, 2019 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
Thursday, April 18, 2019 | NEW REPRESENTATIVE AT IB RECEIVED |
Friday, September 28, 2018 | NEW REPRESENTATIVE AT IB RECEIVED |
Monday, October 2, 2017 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
Wednesday, January 30, 2013 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Tuesday, January 8, 2013 | FINAL DISPOSITION NOTICE SENT TO IB |
Tuesday, January 8, 2013 | FINAL DISPOSITION PROCESSED |
Wednesday, January 2, 2013 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, October 2, 2012 | REGISTERED-PRINCIPAL REGISTER |
Saturday, September 22, 2012 | NOTIFICATION PROCESSED BY IB |
Tuesday, July 17, 2012 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, July 17, 2012 | PUBLISHED FOR OPPOSITION |
Wednesday, June 27, 2012 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, June 27, 2012 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, June 27, 2012 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Thursday, June 14, 2012 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Saturday, June 9, 2012 | EXPARTE APPEAL TERMINATED |
Saturday, June 9, 2012 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Monday, May 21, 2012 | JURISDICTION RESTORED TO EXAMINING ATTORNEY |
Monday, February 27, 2012 | JURISDICTION RESTORED TO EXAMINING ATTORNEY |
Tuesday, November 1, 2011 | NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED |
Tuesday, November 1, 2011 | ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED |
Tuesday, November 1, 2011 | SUBSEQUENT FINAL REFUSAL WRITTEN |
Thursday, September 29, 2011 | JURISDICTION RESTORED TO EXAMINING ATTORNEY |
Monday, May 9, 2011 | EX PARTE APPEAL-INSTITUTED |
Monday, May 9, 2011 | EXPARTE APPEAL RECEIVED AT TTAB |
Monday, May 9, 2011 | NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED |
Monday, May 9, 2011 | ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED |
Monday, May 9, 2011 | ACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED |
Thursday, April 14, 2011 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, April 14, 2011 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, April 14, 2011 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
Friday, January 28, 2011 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Thursday, January 13, 2011 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Thursday, January 13, 2011 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Friday, November 19, 2010 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Friday, November 19, 2010 | FINAL REFUSAL E-MAILED |
Friday, November 19, 2010 | FINAL REFUSAL WRITTEN |
Thursday, October 28, 2010 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, October 28, 2010 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, October 28, 2010 | ASSIGNED TO LIE |
Thursday, October 14, 2010 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Thursday, October 14, 2010 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Thursday, October 14, 2010 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, April 14, 2010 | NON-FINAL ACTION MAILED |
Tuesday, April 13, 2010 | NON-FINAL ACTION WRITTEN |
Monday, March 22, 2010 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, March 22, 2010 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, March 22, 2010 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, October 16, 2009 | REFUSAL PROCESSED BY IB |
Monday, September 21, 2009 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Monday, September 21, 2009 | REFUSAL PROCESSED BY MPU |
Monday, September 21, 2009 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Sunday, September 20, 2009 | NON-FINAL ACTION WRITTEN |
Thursday, September 17, 2009 | ASSIGNED TO EXAMINER |
Tuesday, August 18, 2009 | APPLICATION FILING RECEIPT MAILED |
Friday, August 14, 2009 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Thursday, August 13, 2009 | SN ASSIGNED FOR SECT 66A APPL FROM IB |