ECOMATPRO Trademark

Trademark Overview


On Tuesday, May 26, 2020, a trademark application was filed for ECOMATPRO with the United States Patent and Trademark Office. The USPTO has given the ECOMATPRO trademark a serial number of 79289800. The federal status of this trademark filing is ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE as of Wednesday, November 3, 2021. This trademark is owned by ECOMATPRO PTE. LTD.. The ECOMATPRO trademark is filed in the Non-Metallic Building Material Products category with the following description:

modular bamboo materials to serve as roading, ramps for vehicles, erosion control or a ground cover, namely, ground protection mats, temporary roadways, and temporary helipad landing pads; construction materials, namely, bamboo boards, panels, tiles, erosion control sheeting and partitions to serve as roading, ramps for vehicles, erosion control and ground cover; bamboo flooring; bamboo floor panels; bamboo materials for erosion control, namely, ground protection mats, temporary roadways, temporary helipad landing pads; non-metallic building materials, namely, modular bamboo materials to serve as ground protection mats, temporary roadways, and temporary helipad landing pads; construction materials, namely, non-metallic boards, panels, tiles, sheeting in the nature of geotextiles and partitions to serve as roading, ramps for vehicles, erosion control and ground cover; flooring, not of metal; floor panels, not of metal; geotextiles for use in connection with road construction and public ...
ecomatpro

General Information


Serial Number79289800
Word MarkECOMATPRO
Filing DateTuesday, May 26, 2020
Status602 - ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE
Status DateWednesday, November 3, 2021
Registration Number0000000
Registration DateNOT AVAILABLE
Mark Drawing4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form
Published for Opposition DateNOT AVAILABLE

Trademark Statements


Goods and Servicesmodular bamboo materials to serve as roading, ramps for vehicles, erosion control or a ground cover, namely, ground protection mats, temporary roadways, and temporary helipad landing pads; construction materials, namely, bamboo boards, panels, tiles, erosion control sheeting and partitions to serve as roading, ramps for vehicles, erosion control and ground cover; bamboo flooring; bamboo floor panels; bamboo materials for erosion control, namely, ground protection mats, temporary roadways, temporary helipad landing pads; non-metallic building materials, namely, modular bamboo materials to serve as ground protection mats, temporary roadways, and temporary helipad landing pads; construction materials, namely, non-metallic boards, panels, tiles, sheeting in the nature of geotextiles and partitions to serve as roading, ramps for vehicles, erosion control and ground cover; flooring, not of metal; floor panels, not of metal; geotextiles for use in connection with road construction and public works construction; erosion control fabric; fabrics for use in civil engineering; geotextiles; geotextiles for use in civil engineering; linings, not of metal, for building, namely, non-metal building liner panels
Pseudo MarkECO MAT PRO

Classification Information


International Class019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal.
US Class Codes001, 012, 033, 050
Class Status Code6 - Active
Class Status DateFriday, July 24, 2020
Primary Code019
First Use Anywhere DateNOT AVAILABLE
First Use In Commerce DateNOT AVAILABLE

Trademark Owner History


Party NameECOMATPRO PTE. LTD.
Party Type10 - Original Applicant
Legal Entity Type99 - Other
AddressSG

Trademark Events


Event DateEvent Description
Sunday, November 20, 2022FINAL DECISION TRANSACTION PROCESSED BY IB
Thursday, November 3, 2022FINAL DISPOSITION NOTICE SENT TO IB
Thursday, November 3, 2022FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Saturday, January 15, 2022NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Wednesday, December 29, 2021NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Wednesday, December 29, 2021NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Wednesday, November 3, 2021ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND
Wednesday, November 3, 2021ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
Thursday, April 22, 2021NOTIFICATION OF FINAL REFUSAL EMAILED
Thursday, April 22, 2021FINAL REFUSAL E-MAILED
Thursday, April 22, 2021FINAL REFUSAL WRITTEN
Thursday, April 1, 2021TEAS/EMAIL CORRESPONDENCE ENTERED
Wednesday, March 31, 2021CORRESPONDENCE RECEIVED IN LAW OFFICE
Wednesday, March 31, 2021TEAS RESPONSE TO OFFICE ACTION RECEIVED
Friday, February 5, 2021CHANGE OF NAME/ADDRESS REC'D FROM IB
Monday, October 19, 2020REFUSAL PROCESSED BY IB
Thursday, October 1, 2020NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Thursday, October 1, 2020REFUSAL PROCESSED BY MPU
Friday, September 11, 2020NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Thursday, September 10, 2020NON-FINAL ACTION WRITTEN
Wednesday, August 26, 2020ASSIGNED TO EXAMINER
Tuesday, July 28, 2020APPLICATION FILING RECEIPT MAILED
Friday, July 24, 2020NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM
Thursday, July 23, 2020SN ASSIGNED FOR SECT 66A APPL FROM IB