
| Serial Number | 79289800 |
| Word Mark | ECOMATPRO |
| Filing Date | Tuesday, May 26, 2020 |
| Status | 602 - ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE |
| Status Date | Wednesday, November 3, 2021 |
| Registration Number | 0000000 |
| Registration Date | NOT AVAILABLE |
| Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
| Published for Opposition Date | NOT AVAILABLE |
| Goods and Services | modular bamboo materials to serve as roading, ramps for vehicles, erosion control or a ground cover, namely, ground protection mats, temporary roadways, and temporary helipad landing pads; construction materials, namely, bamboo boards, panels, tiles, erosion control sheeting and partitions to serve as roading, ramps for vehicles, erosion control and ground cover; bamboo flooring; bamboo floor panels; bamboo materials for erosion control, namely, ground protection mats, temporary roadways, temporary helipad landing pads; non-metallic building materials, namely, modular bamboo materials to serve as ground protection mats, temporary roadways, and temporary helipad landing pads; construction materials, namely, non-metallic boards, panels, tiles, sheeting in the nature of geotextiles and partitions to serve as roading, ramps for vehicles, erosion control and ground cover; flooring, not of metal; floor panels, not of metal; geotextiles for use in connection with road construction and public works construction; erosion control fabric; fabrics for use in civil engineering; geotextiles; geotextiles for use in civil engineering; linings, not of metal, for building, namely, non-metal building liner panels |
| Pseudo Mark | ECO MAT PRO |
| International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
| US Class Codes | 001, 012, 033, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, July 24, 2020 |
| Primary Code | 019 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | ECOMATPRO PTE. LTD. |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 99 - Other |
| Address | SG |
| Event Date | Event Description |
| Sunday, November 20, 2022 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Thursday, November 3, 2022 | FINAL DISPOSITION NOTICE SENT TO IB |
| Thursday, November 3, 2022 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Saturday, January 15, 2022 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Wednesday, December 29, 2021 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Wednesday, December 29, 2021 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
| Wednesday, November 3, 2021 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND |
| Wednesday, November 3, 2021 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
| Thursday, April 22, 2021 | NOTIFICATION OF FINAL REFUSAL EMAILED |
| Thursday, April 22, 2021 | FINAL REFUSAL E-MAILED |
| Thursday, April 22, 2021 | FINAL REFUSAL WRITTEN |
| Thursday, April 1, 2021 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Wednesday, March 31, 2021 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Wednesday, March 31, 2021 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Friday, February 5, 2021 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
| Monday, October 19, 2020 | REFUSAL PROCESSED BY IB |
| Thursday, October 1, 2020 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Thursday, October 1, 2020 | REFUSAL PROCESSED BY MPU |
| Friday, September 11, 2020 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Thursday, September 10, 2020 | NON-FINAL ACTION WRITTEN |
| Wednesday, August 26, 2020 | ASSIGNED TO EXAMINER |
| Tuesday, July 28, 2020 | APPLICATION FILING RECEIPT MAILED |
| Friday, July 24, 2020 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
| Thursday, July 23, 2020 | SN ASSIGNED FOR SECT 66A APPL FROM IB |