Serial Number | 85072397 |
Word Mark | ECO BUILD SYSTEMS ALL ECO NO EGO |
Filing Date | Saturday, June 26, 2010 |
Status | 710 - CANCELLED - SECTION 8 |
Status Date | Friday, July 27, 2018 |
Registration Number | 4074849 |
Registration Date | Tuesday, December 20, 2011 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, November 23, 2010 |
Indication of Colors claimed | The color(s) GREEN and GRAY is/are claimed as a feature of the mark. |
Disclaimer with Predetermined Text | "ECO BUILD SYSTEMS" AND "ALL ECO" |
Description of Mark | The mark consists of the stylized wording "Eco Build Systems" set above the wording "all eco" and "no ego", with a large stylized depiction of a yin-yang style symbol formed by two overlapping curved bands placed above the wording "Eco Build Systems", and a small stylized depiction of a yin-yang style symbol formed by two overlapping curved bands placed between the wording "all eco" and "no ego". The color green appears in the wording "Eco Build", in the wording "all eco", in the shading in the horizontal curved band in the large stylized depiction of the yin-yang style symbol, and in the shading in the horizontal curved band in the small stylized depiction of the yin-yang style symbol. The color gray appears in the wording "Systems", in the wording "no ego", in the shading in the vertical curved band in the large stylized depiction of the yin-yang style symbol, and in the shading in the vertical curved band in the small stylized depiction of the yin-yang style symbol. |
Goods and Services | Building construction; Building construction and repair; Building construction information; Building construction services; Building construction supervision; Building construction, remodeling and repair; Building inspection; Charitable services, namely, renovating and constructing homes for low income families; Construction and renovation of buildings; Construction and repair of buildings; Construction and repair of movie and theatrical sets and scenery; Construction consultancy; Construction consultation; Construction dewatering, namely, the removal of surface waters and groundwater to facilitate the construction of structures and pipelines; Construction grading services; Construction management; Construction of airports; Construction of aquatics facilities; Construction of buildings; Construction planning; Construction project management services; Construction project management services in the field of construction of renewable energy and energy generation equipment support structures and ancillary structures for supporting meteorological data gathering equipment; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Construction services, namely, installation of environmental containment systems; Construction services, namely, planning, laying out and construction of a planned residential community; Construction services, namely, planning, laying out and custom construction of commercial buildings; Construction services, namely, planning, laying out and custom construction of residential and commercial communities; Construction supervision; Construction, maintenance and renovation of property; Consultation in building construction supervision; Consultation services in the field of construction of environmentally-conscious buildings; Consulting in the field of building construction; Consulting services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Consulting services in the field of construction of wind energy facilities; Crane rental and leasing for construction purposes; Custom construction of homes; Factory construction; General construction contracting; Harbor construction; Housing services, namely, development of real property, namely, repair, improvement, and new construction; Housing services, namely, repair, improvement, and construction of residential real property; Hydro-electric factory construction; Information concerning rental of equipment for constructions and buildings; Leasing of construction equipment; Plant construction, maintenance and construction project management services for businesses in the energy production and transmission sector; Providing on-line information to assist customers in selecting appropriate foundations for constructing and supporting street lighting structures; Rental of construction and building equipment; Rental of construction equipment; Rental of construction machines and apparatus; Repair or maintenance of construction machines and apparatus; Residential and building construction consulting; Residential and commercial building construction; Scaffolding, earthworks or concrete construction; Self-perform construction skilled trades, namely, concrete work, carpentry and selective demolition services; Steel structure construction works; Street construction; Technical consultation in the field of building construction; Underwater building and construction; Warehouse construction and repair |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 2 - Sec. 8 - Entire Registration |
Class Status Date | Friday, July 27, 2018 |
Primary Code | 037 |
First Use Anywhere Date | Saturday, January 2, 2010 |
First Use In Commerce Date | Saturday, January 2, 2010 |
Party Name | EcoBuild Systems LLC |
Party Type | 30 - Original Registrant |
Legal Entity Type | 16 - Limited Liability Company |
Address | Wesley Chapel, FL 33543 |
Party Name | EcoBuild Systems LLC |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 16 - Limited Liability Company |
Address | Wesley Chapel, FL 33543 |
Party Name | EcoBuild Systems LLC |
Party Type | 10 - Original Applicant |
Legal Entity Type | 16 - Limited Liability Company |
Address | Wesley Chapel, FL 33543 |
Event Date | Event Description |
Friday, July 27, 2018 | CANCELLED SEC. 8 (6-YR) |
Tuesday, December 20, 2016 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED |
Wednesday, January 11, 2012 | UNDELIVERABLE MAIL - NO ACTION TAKEN |
Tuesday, December 20, 2011 | REGISTERED-PRINCIPAL REGISTER |
Thursday, November 17, 2011 | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED |
Wednesday, November 16, 2011 | LAW OFFICE REGISTRATION REVIEW COMPLETED |
Thursday, November 10, 2011 | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED |
Thursday, October 27, 2011 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, October 27, 2011 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, October 20, 2011 | ASSIGNED TO LIE |
Wednesday, October 19, 2011 | TEAS STATEMENT OF USE RECEIVED |
Wednesday, October 19, 2011 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Thursday, October 20, 2011 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Wednesday, October 19, 2011 | STATEMENT OF USE PROCESSING COMPLETE |
Wednesday, October 19, 2011 | USE AMENDMENT FILED |
Wednesday, October 19, 2011 | EXTENSION 1 GRANTED |
Monday, July 18, 2011 | EXTENSION 1 FILED |
Wednesday, October 19, 2011 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
Wednesday, October 19, 2011 | EXTENSION RECEIVED WITH TEAS PETITION |
Wednesday, October 19, 2011 | PETITION TO REVIVE-GRANTED |
Wednesday, October 19, 2011 | TEAS PETITION TO REVIVE RECEIVED |
Monday, August 22, 2011 | ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILED |
Monday, August 22, 2011 | ABANDONMENT - NO USE STATEMENT FILED |
Tuesday, January 18, 2011 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
Tuesday, November 23, 2010 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, November 23, 2010 | PUBLISHED FOR OPPOSITION |
Thursday, October 21, 2010 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Thursday, October 21, 2010 | ASSIGNED TO LIE |
Thursday, October 7, 2010 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Thursday, October 7, 2010 | EXAMINER'S AMENDMENT ENTERED |
Thursday, October 7, 2010 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Thursday, October 7, 2010 | EXAMINERS AMENDMENT E-MAILED |
Thursday, October 7, 2010 | EXAMINERS AMENDMENT -WRITTEN |
Thursday, October 7, 2010 | PREVIOUS ALLOWANCE COUNT WITHDRAWN |
Thursday, October 7, 2010 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Thursday, October 7, 2010 | EXAMINER'S AMENDMENT ENTERED |
Thursday, October 7, 2010 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Thursday, October 7, 2010 | EXAMINERS AMENDMENT E-MAILED |
Thursday, October 7, 2010 | EXAMINERS AMENDMENT -WRITTEN |
Monday, October 4, 2010 | ASSIGNED TO EXAMINER |
Thursday, July 1, 2010 | NOTICE OF DESIGN SEARCH CODE MAILED |
Wednesday, June 30, 2010 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Wednesday, June 30, 2010 | NEW APPLICATION ENTERED IN TRAM |