Serial Number | 97883951 |
Word Mark | E3 ENERGY CUBED |
Filing Date | Wednesday, April 12, 2023 |
Status | 651 - SUSPENSION INQUIRY - MAILED |
Status Date | Tuesday, February 4, 2025 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | NOT AVAILABLE |
Description of Mark | The mark consists of the letter "e" surrounded by three intermingled cube designs with the number "3" on the top right corner and the words "energy cubed" underneath. |
Pseudo Mark | E THREE ENERGY CUBED |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Goods and Services | evaporative air coolers; air filters for heating, ventilating, and air conditioning (HVAC) systems for residential and commercial buildings; heating systems in the nature of air source heat pump systems for energy generation comprised primarily of boilers, valves, pipes, biomass burners, manifolds, sold as a unit; air-conditioning units; central air-conditioning installations for industrial purposes; central heating boilers; cooling evaporators; domestic air-conditioning installations; energy recovery ventilators; ventilation fan accessories, namely grilles for ventilation units; fans for air conditioning units; air cooling apparatus, namely, fuel cell cooling pumps; geothermal-based HVAC systems comprised primarily of boilers, valves, pipes, biomass burners, manifolds, sold as a unit; heat exchangers as part of integrated fuel cell power generating systems and subsystems, not being parts of machines; heat recovery ventilators; HVAC systems for commercial buildings, comprised primarily of boilers, valves, pipes, biomass burners, manifolds, sold as a unit; HVAC systems for residential buildings, comprised primarily of boilers, valves, pipes, biomass burners, manifolds, sold as a unit; refrigerating chambers; refrigerators; solar collectors; solar heating panels; solar thermal collectors for heating; thermostatic valves as parts of heating installations; tubes, pipes and valves sold as integral components of heat pumps; ventilating fans for commercial and industrial use; ventilation hoods; Adsorption cooling hydroponic water chillers as air conditioning and refrigerating installations; heating installations, namely solar energy powered heaters for residential and commercial buildings; combined heat and power (CHP) cogeneration thermal heating and cooling installations for commercial and residential use; solar thermal energy installations, namely, solar thermal modules for solar heating and cooling; Solar tri-generation HVAC systems for residential buildings comprised primarily of boilers, valves, pipes, biomass burners, manifolds, sold as a unit; Solar tri-generation HVAC systems for commercial buildings comprised primarily of boilers, valves, pipes, biomass burners, manifolds, sold as a unit |
NOT AVAILABLE | "ENERGY" |
International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
US Class Codes | 013, 021, 023, 024, 031, 034 |
Class Status Code | 6 - Active |
Class Status Date | Saturday, May 6, 2023 |
Primary Code | 011 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Enersion Inc. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Toronto, Ontario M5J2Z7 CA |
Event Date | Event Description |
Saturday, April 15, 2023 | NEW APPLICATION ENTERED |
Saturday, May 6, 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Tuesday, May 9, 2023 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
Wednesday, June 28, 2023 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Wednesday, June 28, 2023 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Wednesday, June 28, 2023 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Tuesday, April 2, 2024 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, January 9, 2024 | ASSIGNED TO EXAMINER |
Wednesday, January 17, 2024 | NON-FINAL ACTION WRITTEN |
Wednesday, January 17, 2024 | NON-FINAL ACTION E-MAILED |
Wednesday, January 17, 2024 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Tuesday, April 2, 2024 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, April 2, 2024 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Monday, May 6, 2024 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Wednesday, January 29, 2025 | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION |
Tuesday, February 4, 2025 | INQUIRY TO SUSPENSION E-MAILED |
Tuesday, February 4, 2025 | SUSPENSION INQUIRY WRITTEN |
Tuesday, February 4, 2025 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED |
Monday, May 6, 2024 | LETTER OF SUSPENSION E-MAILED |
Monday, May 6, 2024 | SUSPENSION LETTER WRITTEN |