
| Serial Number | 97479936 |
| Word Mark | E |
| Filing Date | Tuesday, June 28, 2022 |
| Status | 700 - REGISTERED |
| Status Date | Tuesday, December 12, 2023 |
| Registration Number | 7244453 |
| Registration Date | Tuesday, December 12, 2023 |
| Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
| Published for Opposition Date | Tuesday, July 18, 2023 |
| Description of Mark | The mark consists of a stylized letter "E" where the top portion of the "E" is formed by a half circle with a line that does not completely meet on the left side of the "E" and the curve forming the bottom portion of the "E" does not connect to the top portion. |
| Goods and Services | Inverters; electrical load controllers; smart electric control panels; energy storage systems comprised of batteries; batteries for use with renewable energy resources; batteries for storage of renewable energy; photovoltaic electric power generators; solar electric power generators; fuel cell systems; charging stations for electric vehicles; battery and electrical power charging connectors and charging cables; downloadable mobile application for managing electrical use in connection with energy systems ; electric control devices for energy management in connection with energy systems; downloadable computer software for the collection, monitoring, management, automation, and control of energy consumption and usage in connection with energy systems; electric control devices for energy management in connection with energy systems; energy management system consisting of downloadable software, electrical outlets, sensors, and electronic display interfaces to measure and regulate energy flow to electric fixtures and other devices in connection with energy systems; instruments for monitoring electrical energy consumption in connection with energy systems; accessories for use connection with energy systems, namely, communications cables, electrical power cables, housings, and relays |
| Pseudo Mark | ENERGY |
| Indication of Colors claimed | Color is not claimed as a feature of the mark. |
| Goods and Services | Software as a service (SAAS) services featuring software for energy management; software as a service (SAAS) services featuring software for energy system design and permitting services; software as a service (SAAS) services featuring software for sales, marketing, and promotion of energy systems and energy resources; development of energy and power management systems in connection with energy systems; providing a website featuring non-downloadable software for the collection, monitoring, management, automation, and control of energy consumption and usage in connection with energy systems; design, development and maintenance of computer software systems and software for energy management and monitoring in connection with energy systems; software as a service (SAAS) services featuring software for energy management and monitoring in connection with energy systems; software as a service (SAAS) services featuring software for energy system installation, management, and servicing |
| International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
| US Class Codes | 021, 023, 026, 036, 038 |
| Class Status Code | 6 - Active |
| Class Status Date | Monday, July 18, 2022 |
| Primary Code | 009 |
| First Use Anywhere Date | Friday, January 1, 2016 |
| First Use In Commerce Date | Friday, January 1, 2016 |
| International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
| US Class Codes | 100, 101 |
| Class Status Code | 6 - Active |
| Class Status Date | Monday, July 18, 2022 |
| Primary Code | 042 |
| First Use Anywhere Date | Friday, January 1, 2016 |
| First Use In Commerce Date | Friday, January 1, 2016 |
| Party Name | Enphase Energy, Inc. |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 03 - Corporation |
| Address | Fremont, CA 94538 |
| Party Name | Enphase Energy, Inc. |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 03 - Corporation |
| Address | Fremont, CA 94538 |
| Party Name | Enphase Energy, Inc. |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 03 - Corporation |
| Address | Fremont, CA 94538 |
| Event Date | Event Description |
| Friday, July 1, 2022 | NEW APPLICATION ENTERED |
| Monday, July 18, 2022 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Tuesday, July 19, 2022 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
| Tuesday, April 11, 2023 | ASSIGNED TO EXAMINER |
| Tuesday, April 18, 2023 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Tuesday, May 2, 2023 | WITHDRAWN FROM PUB - OG REVIEW QUERY |
| Tuesday, May 9, 2023 | PREVIOUS ALLOWANCE COUNT WITHDRAWN |
| Wednesday, May 10, 2023 | NON-FINAL ACTION WRITTEN |
| Wednesday, May 10, 2023 | NON-FINAL ACTION E-MAILED |
| Wednesday, May 10, 2023 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
| Friday, May 12, 2023 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Friday, May 12, 2023 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Friday, May 12, 2023 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Thursday, June 8, 2023 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Wednesday, June 28, 2023 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
| Tuesday, July 18, 2023 | PUBLISHED FOR OPPOSITION |
| Tuesday, July 18, 2023 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
| Tuesday, September 12, 2023 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
| Thursday, November 2, 2023 | STATEMENT OF USE PROCESSING COMPLETE |
| Thursday, October 19, 2023 | USE AMENDMENT FILED |
| Thursday, October 19, 2023 | TEAS STATEMENT OF USE RECEIVED |
| Wednesday, November 1, 2023 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
| Friday, November 3, 2023 | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED |
| Saturday, November 4, 2023 | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED |
| Tuesday, December 12, 2023 | REGISTERED-PRINCIPAL REGISTER |
| Tuesday, December 12, 2023 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |