DUCTAL Trademark

Trademark Overview


On Friday, November 16, 2018, a trademark application was filed for DUCTAL with the United States Patent and Trademark Office. The USPTO has given the DUCTAL trademark a serial number of 79247507. The federal status of this trademark filing is REGISTERED as of Tuesday, October 20, 2020. This trademark is owned by Holcim Technology Ltd. The DUCTAL trademark is filed in the Non-Metallic Building Material Products category with the following description:

. Non-metallic construction materials and products for construction, maintenance, repair and renovation of buildings, engineering works and of all public works, namely, concrete tiles, mortar for building, concrete and cement pilings, concrete and cement bridging structures, non-metal utility poles and posts, concrete sleepers, erosion control fencing and mats for use in construction, erosion control sheeting or fabric for construction use for protection against landslides, non-metal rigid pipes, non-metal frameworks for use in construction, non-metal architectural moldings, non-metal wall linings, non-metal linings for ceilings and tunnels, non-metal coverings for walls, ceilings, and tunnels, facades and non-metal architectural frameworks for reinforcing walls, ceilings, tunnels and bridges, non-metal floor, wall and ceiling panels, non-metal porches for use in construction, non-metal liners for tunnels, non-metal connectors for construction of tunnels, non-metal crowns for construct...
ductal

General Information


Serial Number79247507
Word MarkDUCTAL
Filing DateFriday, November 16, 2018
Status700 - REGISTERED
Status DateTuesday, October 20, 2020
Registration Number6177049
Registration DateTuesday, October 20, 2020
Mark Drawing4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form
Published for Opposition DateTuesday, August 4, 2020

Trademark Statements


Goods and Services. Non-metallic construction materials and products for construction, maintenance, repair and renovation of buildings, engineering works and of all public works, namely, concrete tiles, mortar for building, concrete and cement pilings, concrete and cement bridging structures, non-metal utility poles and posts, concrete sleepers, erosion control fencing and mats for use in construction, erosion control sheeting or fabric for construction use for protection against landslides, non-metal rigid pipes, non-metal frameworks for use in construction, non-metal architectural moldings, non-metal wall linings, non-metal linings for ceilings and tunnels, non-metal coverings for walls, ceilings, and tunnels, facades and non-metal architectural frameworks for reinforcing walls, ceilings, tunnels and bridges, non-metal floor, wall and ceiling panels, non-metal porches for use in construction, non-metal liners for tunnels, non-metal connectors for construction of tunnels, non-metal crowns for construction of tunnels, non-metal frameworks for tunnels, non-metal trellises, non-metal staircases, concrete slabs, wood and concrete beams, wood and concrete purlins, concrete ducts, and connectors for the aforesaid goods; monuments not of metal; cements, concretes and all goods based on cement and concrete, namely, road pavement plates, concrete blocks, hydraulic cement, slates, slate powder, cement mixes, cement slabs, silica cement, alumina cement, concrete and Portland concrete; ready-mixed concretes; special concretes; fiber-reinforced concretes

Classification Information


International Class019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal.
US Class Codes001, 012, 033, 050
Class Status Code6 - Active
Class Status DateMonday, December 17, 2018
Primary Code019
First Use Anywhere DateNOT AVAILABLE
First Use In Commerce DateNOT AVAILABLE

Trademark Owner History


Party NameHolcim Technology Ltd
Party Type30 - Original Registrant
Legal Entity Type99 - Other
AddressCH

Party NameHolcim Technology Ltd
Party Type20 - Owner at Publication
Legal Entity Type99 - Other
AddressCH

Party NameHolcim Technology Ltd
Party Type10 - Original Applicant
Legal Entity Type99 - Other
AddressCH

Trademark Events


Event DateEvent Description
Saturday, February 20, 2021FINAL DECISION TRANSACTION PROCESSED BY IB
Tuesday, February 2, 2021FINAL DISPOSITION NOTICE SENT TO IB
Tuesday, February 2, 2021FINAL DISPOSITION PROCESSED
Wednesday, January 20, 2021FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Friday, November 20, 2020CHANGE OF NAME/ADDRESS REC'D FROM IB
Tuesday, October 20, 2020REGISTERED-PRINCIPAL REGISTER
Friday, August 7, 2020NOTIFICATION PROCESSED BY IB
Tuesday, August 4, 2020OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Tuesday, August 4, 2020PUBLISHED FOR OPPOSITION
Wednesday, July 15, 2020NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Wednesday, July 15, 2020NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Wednesday, July 15, 2020NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Thursday, July 2, 2020ASSIGNED TO LIE
Tuesday, June 30, 2020APPROVED FOR PUB - PRINCIPAL REGISTER
Tuesday, June 30, 2020EXAMINER'S AMENDMENT ENTERED
Tuesday, June 30, 2020NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Tuesday, June 30, 2020EXAMINERS AMENDMENT E-MAILED
Tuesday, June 30, 2020EXAMINERS AMENDMENT -WRITTEN
Sunday, May 31, 2020NOTIFICATION OF FINAL REFUSAL EMAILED
Sunday, May 31, 2020FINAL REFUSAL E-MAILED
Sunday, May 31, 2020FINAL REFUSAL WRITTEN
Friday, May 29, 2020NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Wednesday, May 13, 2020NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Wednesday, May 13, 2020NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Thursday, May 7, 2020TEAS/EMAIL CORRESPONDENCE ENTERED
Thursday, May 7, 2020CORRESPONDENCE RECEIVED IN LAW OFFICE
Thursday, May 7, 2020TEAS RESPONSE TO OFFICE ACTION RECEIVED
Tuesday, November 12, 2019NOTIFICATION OF NON-FINAL ACTION E-MAILED
Tuesday, November 12, 2019NON-FINAL ACTION E-MAILED
Tuesday, November 12, 2019NON-FINAL ACTION WRITTEN
Tuesday, October 15, 2019PREVIOUS ALLOWANCE COUNT WITHDRAWN
Tuesday, October 15, 2019APPROVED FOR PUB - PRINCIPAL REGISTER
Thursday, September 5, 2019TEAS/EMAIL CORRESPONDENCE ENTERED
Thursday, September 5, 2019CORRESPONDENCE RECEIVED IN LAW OFFICE
Thursday, September 5, 2019TEAS RESPONSE TO OFFICE ACTION RECEIVED
Friday, March 29, 2019REFUSAL PROCESSED BY IB
Tuesday, March 12, 2019NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Tuesday, March 12, 2019REFUSAL PROCESSED BY MPU
Sunday, March 3, 2019NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Saturday, March 2, 2019NON-FINAL ACTION WRITTEN
Wednesday, February 20, 2019ASSIGNED TO EXAMINER
Friday, December 21, 2018APPLICATION FILING RECEIPT MAILED
Monday, December 17, 2018NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM
Thursday, December 13, 2018SN ASSIGNED FOR SECT 66A APPL FROM IB