Serial Number | 79041294 |
Word Mark | DEEP. UNDERGROUND ENGINEERING |
Filing Date | Tuesday, February 13, 2007 |
Status | 709 - CANCELLED - SECTION 71 |
Status Date | Friday, September 27, 2019 |
Registration Number | 3580615 |
Registration Date | Tuesday, February 24, 2009 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, December 9, 2008 |
Indication of Colors claimed | The color(s) blue and black is/are claimed as a feature of the mark. |
Disclaimer with Predetermined Text | "UNDERGROUND ENGINEERING" |
Description of Mark | The mark consists of a long vertical line running from the top of the mark to a circle, which is encompassed by a square, near the bottom of the mark; the term "DEEP." appears below the square; the phrase "UNDERGROUND ENGINEERING" appears below the term "DEEP."; the color blue appears in the long vertical line that runs from the top of the mark down to the circle, in the circle and in the term, "DEEP."; the color black appears in the square and in the phrase "UNDERGROUND ENGINEERING". |
Goods and Services | [ Underground storage reservoirs consisting of rock for gas or liquids for the purposes of energy supplies or for waste material ] |
Goods and Services | Mining extraction; construction, construction supervision, construction inspection and maintenance of underground storage reservoirs used for mining extraction of brine and salt and for gas or liquids or for waste material; construction, construction supervision, maintenance and construction inspection of underground cavities, namely, caverns and pore storage sites constructed for the storage and disposal of gas or liquids for energy supply or for waste material; drilling and underground works, namely, well drilling for cavern construction and mining operations; mining operations, namely, mining extraction of brine and salt; construction supervision; drilling in the field of mining extraction |
Goods and Services | Storage of gas or liquids, namely, crude oil, natural gas, fuels, for the purposes of energy supplies or of waste material for disposal in underground cavities, in particular in underground caverns and pore storage sites |
Goods and Services | Technical project studies, namely, conducting feasibility studies and technical monitoring of underground cavities, namely, caverns and pore storage sites constructed for the storage and disposal of gas or liquids for energy supplies or for waste material; engineering; technical monitoring of storage sites and facilities for mining extraction of brine and salt and for gas or liquids or for waste material; surveying and technical consulting in the field of engineering as this field applies to mining extraction, cavern construction and reservoir construction; computer software design for others; surveying for safety-in-mines and technical safety; geological and geotechnical surveys; research and development in the fields of underground storage in underground caverns and pore storage sites as well as disposal of waste material; geological research concerning underground storage parameters; technical project studies, namely, conducting feasibility studies in the fields of cavern construction, reservoir construction, geology; technology supervision and inspection of geotechnical facilities; technical approval of geotechnical facilities, namely, analysis of geotechnical facilities, evaluation and testing of geotechnical facilities of others; technical risk assessment, namely, engineering services, engineering services for building and property condition assessment and plant construction; conducting environmental impact analysis for others; conducting technical project studies and providing accompanying documentation therefor, namely, conducting feasibility studies in the field of geoengineering works; technical project studies, namely, conducting feasibility studies of underground storage sites and disposals in abandoned deposits; technical analysis of hydro- and thermodynamic environments in pore storage sites to determine how to reduce the impact on the environment; technical project studies, namely, conducting feasibility studies in the fields of waste water, drilling fluid and other cavern waste fluid or cavern storage waste sites; and hydrogeological projects, namely, evaluation of surface and ground water ability and abstraction, and water quality and quantity control, including waste reservoirs; technical project studies, namely, conducting feasibility studies of waste water, cavern waste fluids and cavern storage waste deposits; technical development of new technology for others to operate brine facilities and technical monitoring of brine facilities; developing measuring and testing procedures for others in the fields of underground storage and disposal technique; technical project studies, namely, conducting feasibility studies in the fields of drilling for raw material exploration, namely, drilling for geothermal purposes |
Pseudo Mark | DEEP. UNDERGROUND ENGINEERING |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | G - NOT AVAILABLE |
Class Status Date | Tuesday, February 10, 2015 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, September 27, 2019 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 039 - Transport; packaging and storage of goods; travel arrangement. |
US Class Codes | 100, 105 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, September 27, 2019 |
Primary Code | 039 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, September 27, 2019 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | DEEP.KBB GmbH |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | DE |
Party Name | DEEP. Underground Engineering GmbH |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | DE |
Party Name | DEEP. Underground Engineering GmbH |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | DE |
Event Date | Event Description |
Friday, July 17, 2020 | TOTAL INVALIDATION PROCESSED BY THE IB |
Tuesday, June 23, 2020 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Tuesday, June 23, 2020 | INVALIDATION PROCESSED |
Wednesday, May 27, 2020 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
Thursday, October 10, 2019 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
Friday, September 27, 2019 | CANCELLED SECTION 71 |
Friday, August 24, 2018 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
Thursday, March 2, 2017 | INTERNATIONAL REGISTRATION RENEWED |
Friday, December 11, 2015 | PARTIAL INVALIDATION PROCESSED BY THE IB |
Wednesday, November 18, 2015 | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Wednesday, November 18, 2015 | INVALIDATION PROCESSED |
Saturday, October 10, 2015 | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED |
Tuesday, February 10, 2015 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - MAILED |
Tuesday, February 10, 2015 | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. |
Tuesday, February 10, 2015 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
Monday, January 26, 2015 | TEAS SECTION 71 & 15 RECEIVED |
Friday, January 11, 2013 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Monday, June 1, 2009 | FINAL DISPOSITION NOTICE SENT TO IB |
Monday, June 1, 2009 | FINAL DISPOSITION PROCESSED |
Sunday, May 24, 2009 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, February 24, 2009 | REGISTERED-PRINCIPAL REGISTER |
Thursday, February 12, 2009 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Thursday, January 29, 2009 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Thursday, January 29, 2009 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Tuesday, December 9, 2008 | PUBLISHED FOR OPPOSITION |
Wednesday, November 19, 2008 | NOTICE OF PUBLICATION |
Thursday, November 6, 2008 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Monday, November 3, 2008 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Friday, October 10, 2008 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, October 10, 2008 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, October 10, 2008 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, June 4, 2008 | NON-FINAL ACTION MAILED |
Wednesday, June 4, 2008 | NON-FINAL ACTION WRITTEN |
Monday, June 2, 2008 | PREVIOUS ALLOWANCE COUNT WITHDRAWN |
Friday, May 23, 2008 | WITHDRAWN FROM PUB - OG REVIEW QUERY |
Wednesday, May 14, 2008 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Wednesday, May 14, 2008 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, May 14, 2008 | EXAMINERS AMENDMENT MAILED |
Wednesday, May 14, 2008 | EXAMINER'S AMENDMENT ENTERED |
Wednesday, May 14, 2008 | EXAMINERS AMENDMENT -WRITTEN |
Monday, March 31, 2008 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, March 31, 2008 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, March 31, 2008 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, January 18, 2008 | NON-FINAL ACTION MAILED |
Friday, January 18, 2008 | NON-FINAL ACTION WRITTEN |
Friday, December 28, 2007 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, December 28, 2007 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, December 27, 2007 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Thursday, December 27, 2007 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, November 7, 2007 | LEGAL INSTRUMENT EXAMINER (LIE) - CORRECTION |
Saturday, September 29, 2007 | REFUSAL PROCESSED BY IB |
Wednesday, September 12, 2007 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Monday, September 10, 2007 | REFUSAL PROCESSED BY MPU |
Saturday, September 8, 2007 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Friday, September 7, 2007 | ASSIGNED TO LIE |
Friday, September 7, 2007 | NON-FINAL ACTION WRITTEN |
Friday, August 31, 2007 | ASSIGNED TO EXAMINER |
Friday, August 31, 2007 | NEW APPLICATION ENTERED IN TRAM |
Thursday, August 30, 2007 | SN ASSIGNED FOR SECT 66A APPL FROM IB |