Serial Number | 79411387 |
Word Mark | CONTA |
Filing Date | Thursday, September 12, 2024 |
Status | 661 - RESPONSE AFTER NON-FINAL ACTION - ENTERED |
Status Date | Thursday, July 24, 2025 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Drying apparatus, namely, spray dryer nozzle purge systems comprised of block valves and liquid feed systems as parts of machines; food and spray dryers being part of machines; regulators being part of machines; connection fittings for machines, namely, liquid valves and atomizer nozzles; cleaners, namely, spray drying machines and block valves for food and dairy processing machines; machine tools, namely, powered machines for treatment of materials and for manufacturing of food and dairy products; hydraulic controls for the operation of machines and engines; valves being parts of machines; pump control valves being parts of machines; dosing valves being parts of machines; lockable valves being parts of machines; clack valves being parts of machines; valves being parts of spray drying apparatus |
Goods and Services | Metal pipes and metal tubes for food and dairy processing, and parts thereof; metal valves not being parts of machines; check valves of metal not being parts of machines; manually operated metal valves; valves of metal, other than parts of machines |
Goods and Services | Sanitary and hygienic installations in the nature of valves for atomization system for food and dairy spray dryers; water supply and sanitation equipment, namely, block valve systems for reduced microbiological contamination in food and dairy processing; sanitary installations, namely, block valves for spray dryer systems to minimize potential source of microbiological risk; valves being part of sanitary installations, namely, high pressure valves for food and dairy spray dryers; mixing valves for sanitary and hygienic installations |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, December 5, 2024 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 024, 031, 034, 035 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, December 5, 2024 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
US Class Codes | 013, 021, 023, 024, 031, 034 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, December 5, 2024 |
Primary Code | 011 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | GEA Process Engineering A/S |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | DK |
Event Date | Event Description |
Thursday, December 5, 2024 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Friday, December 6, 2024 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Friday, December 6, 2024 | APPLICATION FILING RECEIPT MAILED |
Friday, February 28, 2025 | LIMITATION OF GOODS RECEIVED FROM IB |
Wednesday, March 12, 2025 | ASSIGNED TO EXAMINER |
Friday, March 14, 2025 | NON-FINAL ACTION WRITTEN |
Saturday, March 15, 2025 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Friday, April 25, 2025 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Friday, April 25, 2025 | REFUSAL PROCESSED BY MPU |
Thursday, July 24, 2025 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, July 24, 2025 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Thursday, July 24, 2025 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Saturday, May 17, 2025 | REFUSAL PROCESSED BY IB |