Serial Number | 79183487 |
Word Mark | COMEXIO |
Filing Date | Thursday, October 8, 2015 |
Status | 709 - CANCELLED - SECTION 71 |
Status Date | Friday, August 25, 2023 |
Registration Number | 5139457 |
Registration Date | Tuesday, February 14, 2017 |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, November 29, 2016 |
Goods and Services | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; electric regulating apparatus, namely, converters, electric switches, electric circuit switches, electric light switches, and electric current switches; home and office automation systems which can be controlled via communications networks, comprising wireless and wired controllers, controlled devices, and software for monitoring and controlling lighting, HVAC, security, safety and other home and office monitoring and control applications; computer-controlled home and office automation systems comprising wireless and wired controllers, controlled devices, and software for monitoring and controlling lighting, HVAC, security, safety and other home and office monitoring, and control applications; computer operating software for home and office automations system comprised of wireless and wired controllers, controlled devices; data processing apparatus; measuring apparatus for measuring temperature, electricity, humidity, time, wind, rain, and light intensity; switches and installations consisting thereof, namely, medium voltage switchgear, low-voltage switchgear, pressure switches for opening and closing electrical contacts in response to changes in pressure, light switches, batteries; home control systems and installations consisting thereof, namely, programmable logic controllers (plc), low voltage switchgear, and electric load break switches; electricity measuring stations and distribution consoles in particular of metal construction; free-standing cabinets, network cabinets, server cabinets, floor distribution cabinets and control cabinets, all specially adapted for electrical switchgear |
Goods and Services | Construction drafting of apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; construction drafting of computer-controlled apparatus, instruments and components for monitoring and controlling electric and electronic installations and equipment; construction drafting of low-voltage and medium-voltage switchgear; computer programming |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, August 25, 2023 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, August 25, 2023 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Greiner Schaltanlagen GmbH |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | DE |
Party Name | Greiner Schaltanlagen GmbH |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | DE |
Party Name | Greiner Schaltanlagen GmbH |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | DE |
Event Date | Event Description |
Thursday, February 25, 2016 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Monday, February 29, 2016 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Monday, February 29, 2016 | ASSIGNED TO EXAMINER |
Friday, March 4, 2016 | APPLICATION FILING RECEIPT MAILED |
Tuesday, March 15, 2016 | NON-FINAL ACTION WRITTEN |
Wednesday, March 16, 2016 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Wednesday, March 16, 2016 | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW |
Thursday, March 17, 2016 | NON-FINAL ACTION WRITTEN |
Friday, March 18, 2016 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Friday, March 18, 2016 | REFUSAL PROCESSED BY MPU |
Friday, March 18, 2016 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Friday, May 13, 2016 | REFUSAL PROCESSED BY IB |
Friday, September 16, 2016 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, September 16, 2016 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, September 16, 2016 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, October 20, 2016 | EXAMINERS AMENDMENT -WRITTEN |
Thursday, October 20, 2016 | EXAMINER'S AMENDMENT ENTERED |
Thursday, October 20, 2016 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Thursday, October 20, 2016 | EXAMINERS AMENDMENT MAILED |
Wednesday, November 9, 2016 | NOTICE OF PUBLICATION |
Tuesday, November 29, 2016 | PUBLISHED FOR OPPOSITION |
Tuesday, February 14, 2017 | REGISTERED-PRINCIPAL REGISTER |
Sunday, May 14, 2017 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Thursday, June 1, 2017 | FINAL DISPOSITION PROCESSED |
Thursday, June 1, 2017 | FINAL DISPOSITION NOTICE SENT TO IB |
Saturday, June 24, 2017 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Friday, August 25, 2023 | CANCELLED SECTION 71 |
Thursday, April 25, 2024 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
Monday, May 6, 2024 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Monday, May 6, 2024 | INVALIDATION PROCESSED |
Monday, May 27, 2024 | TOTAL INVALIDATION PROCESSED BY THE IB |
Thursday, January 23, 2020 | NEW REPRESENTATIVE AT IB RECEIVED |