Serial Number | 79352830 |
Word Mark | COMAT RELECO |
Filing Date | Monday, March 21, 2022 |
Status | 700 - REGISTERED |
Status Date | Tuesday, November 14, 2023 |
Registration Number | 7215514 |
Registration Date | Tuesday, November 14, 2023 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, August 29, 2023 |
Description of Mark | The mark consists of a design of two equal halves of a polygon shape above and below a circular image with a straight, horizontal bar connected to the circle extending to the right and the wording "COMAT RELECO" to the right. |
Goods and Services | Electric relays; scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signaling, checking supervision, life-saving and teaching apparatus and instruments, namely, electronic speed and rotation controllers for motors; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, namely, voltage, current and power regulators and switches; electric resistances, electric resistors, electrical fuses and controllers and voltage regulators, electric current control devices and voltage regulators for electric power and electric and power switches; terminals, namely, electrical terminal boxes; electric connectors; junction boxes; electronic connectors; electric cable connectors; connectors for electronic circuits; junction sleeves for electric cables; electric connectors; electric fuses; electric fuse boxes; metal alloy wires for electric fuses; accumulators; electric conductors; materials for electricity mains in the nature of electric wires, cables; circuit breakers; electric switches; printed circuits; electronic power voltage regulators; power voltage regulators; voltage regulators; electric control apparatus, namely, electrical controlling devices for electric current and electrical signals; electric monitoring apparatus, namely electronic monitors and monitor modules for monitoring electric current and electrical signals; electric control, testing and monitoring apparatus, namely electric control devices for heating and energy management; electric apparatus for switching, namely, electric switches; electronic circuits; electronic integrated circuits; electronic chips for manufacturing integrated circuits; heat regulating apparatus, namely, heat detection systems comprised of fiber optic linear loop configuration, heat detectors, monitors |
Goods and Services | Repair of electrical systems and electrical relays; installation services of electrical systems and electrical relays; installation, maintenance and repair of apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity; advisory services relating to the installation, maintenance and repair of mechanical and electrical equipment; installation, maintenance and repair of electric and electronic apparatus and equipment; installation, maintenance and repair of electronic control apparatus |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Wednesday, July 19, 2023 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, October 21, 2022 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | ComatReleco AG |
Party Type | 30 - Original Registrant |
Legal Entity Type | 25 - NOT AVAILABLE |
Address | CH |
Party Name | ComatReleco AG |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 25 - NOT AVAILABLE |
Address | CH |
Party Name | ComatReleco AG |
Party Type | 10 - Original Applicant |
Legal Entity Type | 25 - NOT AVAILABLE |
Address | CH |
Event Date | Event Description |
Monday, March 11, 2024 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Thursday, February 15, 2024 | FINAL DISPOSITION NOTICE SENT TO IB |
Thursday, February 15, 2024 | FINAL DISPOSITION PROCESSED |
Wednesday, February 14, 2024 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Saturday, January 6, 2024 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
Tuesday, November 14, 2023 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
Tuesday, November 14, 2023 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, August 29, 2023 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, August 29, 2023 | PUBLISHED FOR OPPOSITION |
Monday, August 28, 2023 | NOTIFICATION PROCESSED BY IB |
Wednesday, August 9, 2023 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, August 9, 2023 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, August 9, 2023 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Monday, July 24, 2023 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, July 19, 2023 | EXAMINER'S AMENDMENT ENTERED |
Wednesday, July 19, 2023 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Wednesday, July 19, 2023 | EXAMINERS AMENDMENT E-MAILED |
Wednesday, July 19, 2023 | EXAMINERS AMENDMENT -WRITTEN |
Wednesday, June 14, 2023 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, June 13, 2023 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, June 13, 2023 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, March 29, 2023 | REFUSAL PROCESSED BY IB |
Wednesday, March 8, 2023 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Wednesday, March 8, 2023 | REFUSAL PROCESSED BY MPU |
Thursday, January 12, 2023 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Wednesday, January 11, 2023 | NON-FINAL ACTION WRITTEN |
Tuesday, January 3, 2023 | ASSIGNED TO EXAMINER |
Tuesday, October 25, 2022 | APPLICATION FILING RECEIPT MAILED |
Friday, October 21, 2022 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, October 20, 2022 | SN ASSIGNED FOR SECT 66A APPL FROM IB |