Serial Number | 79324773 |
Word Mark | COBOTWELDSPACE |
Filing Date | Wednesday, May 26, 2021 |
Status | 700 - REGISTERED |
Status Date | Tuesday, December 6, 2022 |
Registration Number | 6914958 |
Registration Date | Tuesday, December 6, 2022 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, September 20, 2022 |
Goods and Services | Material processing and transformation by welding and cutting of steel; welding; material processing, namely, cutting of materials by plasma and laser processing, in particular of ferrous materials and plastics |
Description of Mark | The mark consists of the wording COBOT WELDSPACE with a robot arm surrounded by a partial rectangle to the left of the wording. |
Goods and Services | Prefabricated transportable cabins, not of metal; prefabricated structures, namely, not of metal, in the form of cabins |
Goods and Services | Metalworking machines; machine tools for cutting materials; machines for cutting materials by means of plasma and laser processing; industrial welding robots; electric welding machines; electric welding robot machines; industrial welding machines for welding plastic materials; industrial robot-controlled welding machines; industrial welding and soldering machines and apparatuses machines for welding with laser technology; industrial apparatuses for welding with laser technology; industrial machines for welding thermoplastic tubes |
Goods and Services | Prefabricated metal cabins; prefabricated metal cabin walls |
Pseudo Mark | COBOT WELD SPACE |
Disclaimer with Predetermined Text | "COBOT" |
Goods and Services | Engineering services, namely, development services, design planning and technological consultancy and technical project planning with regard to robots and robot applications and their optimisation, operation, fault analysis and remote maintenance; engineering services with regard to robot simulation, calibration and the integration of high-precision industrial robots into manufacturing plants as turnkey solutions; software design and development, namely, creation of application-specific computer programs for data processing for machines and of control programs for machines, machine devices and assembled plants for the manufacture of products |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 5, 2021 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 024, 031, 034, 035 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 5, 2021 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 5, 2021 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 5, 2021 |
Primary Code | 040 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Friday, November 5, 2021 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Demmeler Maschinenbau GmbH & Co. KG |
Party Type | 30 - Original Registrant |
Legal Entity Type | 03 - Corporation |
Address | DE |
Party Name | Demmeler Maschinenbau GmbH & Co. KG |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 03 - Corporation |
Address | DE |
Party Name | Demmeler Maschinenbau GmbH & Co. KG |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | DE |
Event Date | Event Description |
Monday, April 24, 2023 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Thursday, March 30, 2023 | FINAL DISPOSITION NOTICE SENT TO IB |
Thursday, March 30, 2023 | FINAL DISPOSITION PROCESSED |
Monday, March 6, 2023 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, December 6, 2022 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
Tuesday, December 6, 2022 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, September 27, 2022 | NOTIFICATION PROCESSED BY IB |
Tuesday, September 20, 2022 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, September 20, 2022 | PUBLISHED FOR OPPOSITION |
Wednesday, September 7, 2022 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, September 7, 2022 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, August 31, 2022 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Friday, August 12, 2022 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, August 3, 2022 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, August 2, 2022 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, August 2, 2022 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Sunday, March 27, 2022 | REFUSAL PROCESSED BY IB |
Thursday, March 10, 2022 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Thursday, March 10, 2022 | REFUSAL PROCESSED BY MPU |
Thursday, February 10, 2022 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Wednesday, February 9, 2022 | NON-FINAL ACTION WRITTEN |
Wednesday, February 9, 2022 | ASSIGNED TO EXAMINER |
Tuesday, November 9, 2021 | APPLICATION FILING RECEIPT MAILED |
Friday, November 5, 2021 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, November 4, 2021 | SN ASSIGNED FOR SECT 66A APPL FROM IB |