Serial Number | 79030380 |
Word Mark | CENTROSOLAR |
Filing Date | Friday, December 23, 2005 |
Status | 706 - SECTION 71 ACCEPTED |
Status Date | Tuesday, October 13, 2020 |
Registration Number | 3427031 |
Registration Date | Tuesday, May 13, 2008 |
Mark Drawing | 4000 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, February 26, 2008 |
Goods and Services | Apparatus and instruments for conducting, switching, transforming, storing, regulating and controlling of electricity, namely, electric conductors, electric switches, electric transformers, electric storage batteries and voltage regulators for electric power; electric apparatus and instruments, namely, electric accumulators, electric commutators in the field of photovoltaic and solar thermal; electric accumulators; electric cables; electric and electronic operating instruments and apparatus, namely, remote controls used for the regulation and control of interior and exterior window blinds, and temperature sensors; wind sensors and sun sensors for activating aforesaid instruments and apparatus; automatic switchboards for electronic control and operation of aforesaid apparatus and instruments; solar control systems consisting of installations and systems and parts thereof, namely, solar cells, solar modules, inverters, rectifiers, converter in the fields of photovoltaic and solar thermal; electric plugs, electric fuses, and electric fuse boxes; electric switches and automatic switchboards; replacement parts for all aforesaid goods, all aforesaid goods not in relation to the automobile industry |
Goods and Services | [ Non-metal building materials, in particular cement roofing slabs for inclined roofs in connection with energy generating systems for the use of environmental warmth; non-metal roofings featuring integrated solar cells; non-metal rigid pipes for building purposes; asphalt, pitch and bitumen asphalt; non-metal transportable buildings ] |
Goods and Services | [ Building construction; repair installation and maintenance of installations for generating regenerative energy; construction planning, namely, construction planning and consultation in connection with thermal and photovoltaic solar systems as well as in connection with energy saving house technology ] |
Goods and Services | [ Lighting apparatus, namely, lamps; heating apparatus relating to solar energy technology, namely, steam heating apparatus for industrial purposes; steam generating apparatus, namely, electric food steamers; ventilation apparatus, namely, ventilating exhaust fans; water supply apparatus, namely, water faucet spout; solar collectors for heating; solar energy systems consisting of solar heat collection panels, solar collectors, solar thermal installations and systems being solar heating plants and replacement parts thereof in the fields of photovoltaic and solar thermal but not for heating apparatus and solely relating to solar energy technology; hot-water tanks, furnace boilers, electrochemical gas generators, heating systems consisting of heating installations being photovoltaic solar power plants and heating components in the nature of solar radiant heater and replacement parts thereof but not for heating apparatus and solely relating to solar energy technology, cooling systems consisting of evaporative air cooling units for domestic purposes, water heating systems related to solar energy technology composed primarily of tubes, pipes and pre-assembled manifolds though which cold or low temperature water circulates solely; all aforesaid goods not in relation to the automobile industry ] |
Goods and Services | Scientific and technological services, namely, scientific research about solar energy; scientific research; technology research in the fields of photovoltaic and solar thermal; and technological design services for others in the fields of photovoltaic and solar thermal; industrial research services in the fields of photovoltaic and solar thermal; architectural consultation, engineering services including engineering services related to construction planning and engineering consultation relating to thermal and photovoltaic solar systems as well as of energy saving house technology; technical project planning in the fields of photovoltaic and solar thermal; technical research in the fields of photovoltaic and solar thermal; design and development of computer hardware and software, conversion of data and documents from physical to electronic media, technical development of measuring, signaling, controlling, checking and supervision apparatus and systems for third parties in the fields of photovoltaic and solar thermal and related technical consultation services; all aforesaid services in particular with regard to solar technology |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, April 9, 2020 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
US Class Codes | 013, 021, 023, 031, 034 |
Class Status Code | G - NOT AVAILABLE |
Class Status Date | Friday, November 14, 2014 |
Primary Code | 011 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | G - NOT AVAILABLE |
Class Status Date | Friday, November 14, 2014 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, April 9, 2020 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | G - NOT AVAILABLE |
Class Status Date | Friday, November 14, 2014 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | CENTROSOLAR Group AG |
Party Type | 30 - Original Registrant |
Legal Entity Type | 98 - Unknown |
Address | 80807 München DE |
Party Name | CENTROSOLAR Group AG |
Party Type | 21 - New Owner After Publication |
Legal Entity Type | 98 - Unknown |
Address | DE |
Party Name | CENTROSOLAR AG |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 03 - Corporation |
Address | 80807 München DE |
Party Name | CENTROSOLAR AG |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | 80807 München DE |
Event Date | Event Description |
Sunday, December 25, 2022 | NEW REPRESENTATIVE AT IB RECEIVED |
Thursday, June 17, 2021 | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE |
Sunday, June 13, 2021 | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED |
Tuesday, October 13, 2020 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED |
Tuesday, October 13, 2020 | REGISTERED-SEC.71 ACCEPTED |
Friday, October 9, 2020 | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED |
Friday, June 5, 2020 | USPTO CORRECTION PROCESSED BY IB |
Thursday, April 9, 2020 | POST REGISTRATION ACTION MAILED - SEC.71 |
Thursday, April 9, 2020 | REINSTATED |
Friday, November 29, 2019 | TOTAL INVALIDATION PROCESSED BY THE IB |
Sunday, September 8, 2019 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Sunday, September 8, 2019 | INVALIDATION PROCESSED |
Wednesday, August 21, 2019 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
Friday, December 21, 2018 | CANCELLED SECTION 71 |
Monday, November 19, 2018 | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED |
Monday, November 19, 2018 | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED |
Thursday, May 17, 2018 | POST REGISTRATION ACTION MAILED - SEC.71 |
Monday, May 14, 2018 | TEAS SECTION 71 RECEIVED |
Saturday, May 13, 2017 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED |
Saturday, January 30, 2016 | INTERNATIONAL REGISTRATION RENEWED |
Friday, September 11, 2015 | PARTIAL INVALIDATION PROCESSED BY THE IB |
Thursday, August 20, 2015 | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Thursday, August 20, 2015 | INVALIDATION PROCESSED |
Tuesday, July 14, 2015 | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED |
Friday, November 14, 2014 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED |
Friday, November 14, 2014 | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. |
Friday, November 14, 2014 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
Wednesday, November 5, 2014 | TEAS SECTION 71 & 15 RECEIVED |
Saturday, December 22, 2012 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Friday, August 29, 2008 | FINAL DISPOSITION NOTICE SENT TO IB |
Friday, August 29, 2008 | FINAL DISPOSITION PROCESSED |
Wednesday, August 13, 2008 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, May 13, 2008 | REGISTERED-PRINCIPAL REGISTER |
Thursday, March 13, 2008 | CHANGE OF OWNER RECEIVED FROM IB |
Tuesday, February 26, 2008 | PUBLISHED FOR OPPOSITION |
Wednesday, February 6, 2008 | NOTICE OF PUBLICATION |
Friday, January 18, 2008 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Thursday, January 17, 2008 | EXAMINERS AMENDMENT MAILED |
Wednesday, January 16, 2008 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, January 16, 2008 | EXAMINER'S AMENDMENT ENTERED |
Wednesday, January 16, 2008 | EXAMINERS AMENDMENT -WRITTEN |
Wednesday, July 25, 2007 | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED |
Friday, July 20, 2007 | FINAL REFUSAL MAILED |
Friday, July 20, 2007 | FINAL REFUSAL WRITTEN |
Friday, July 20, 2007 | ASSIGNED TO EXAMINER |
Friday, July 20, 2007 | CORRECTION TRANSACTION RECEIVED FROM IB |
Saturday, June 23, 2007 | AMENDMENT FROM APPLICANT ENTERED |
Saturday, June 23, 2007 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Saturday, June 23, 2007 | ASSIGNED TO LIE |
Tuesday, June 12, 2007 | PAPER RECEIVED |
Friday, December 29, 2006 | REFUSAL PROCESSED BY IB |
Tuesday, December 12, 2006 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Tuesday, December 12, 2006 | REFUSAL PROCESSED BY MPU |
Thursday, December 7, 2006 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Wednesday, December 6, 2006 | NON-FINAL ACTION WRITTEN |
Friday, November 24, 2006 | ASSIGNED TO EXAMINER |
Friday, November 24, 2006 | NEW APPLICATION ENTERED IN TRAM |
Thursday, November 23, 2006 | SN ASSIGNED FOR SECT 66A APPL FROM IB |