Serial Number | 79209180 |
Word Mark | C2C |
Filing Date | Wednesday, November 2, 2016 |
Status | 700 - REGISTERED |
Status Date | Tuesday, March 19, 2019 |
Registration Number | 5699741 |
Registration Date | Tuesday, March 19, 2019 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, October 2, 2018 |
Description of Mark | The mark consists of the alpha-numeric element "C2C" within three smaller circles forming a triangular shape with a line from the top circle to each of the two bottom circles and with the number "2" appearing in the top circle and the letter "C" appearing in each of the bottom circles. |
Goods and Services | Chemical machinery, namely, industrial steel making machinery and steel mills for the manufacture of steel; Chemical machinery, namely, steel converters for decarburizing pig iron by means of blowing refines oxygen; Chemical machinery, namely, ladle treatment equipment in the nature of injection systems to inject reagents to molten steel, vacuum treatment for carbon deoxidation, dedusting and alloying systems, for ladle furnaces to be used in steelworks and steelmills; Chemical machinery, namely, vacuum treatment equipment for metallurgical vacuum treatment of molten steel using steel converters; Chemical machinery, namely, continuous slab casting machines or ingot casting machines; gas turbine power and steam turbine power electricity generation equipment consisting primarily of generators, low-pressure and high-pressure turbines, not for land vehicles; coal cutting mill machines; electrolysis machinery, namely, an electrolysis chamber to separate water into hydrogen and oxygen for increasing efficiency for use in internal combustion engines, turbines and air turbines, not for land vehicles |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Goods and Services | Hot blast furnaces for pig iron production, for industrial purposes; gas pipeline systems, namely, switchable separators for the cleaning and purification of gases, smelting gases, coke-oven gases, blast furnace top gases, converter gases, process gases, as well as mixed gases and utility gases composed from the specified gases which occur in pig iron production, crude steel production, and/or coke production; machinery for hydrogen production, namely, hydrogen generators; machinery for ammonia synthesis and urea synthesis, namely, electrochemical gas generator for producing ammonia and urea, and gas purification machines for chemical liquefaction and separation for the transformation and production of the basic chemical compounds ammonia and urea; thermal oxidizers for industrial air pollution control, namely, machinery for converting carbon monoxide proportions of a smelting gas by means of a water-gas shift reaction or a steam reforming with water vapor or a partial oxidation with air and/or oxygen; separators for the cleaning and purification of gases, namely, machinery for separating process gases in a gas mixture by means of a pressure swing adsorption; gas purification machines, namely, machinery for gas purification and gas conditioning of utility gases, and facilities consisting thereof, for yielding, treatment, recovery, and/or production of chemical products from industrial exhaust gas emissions and/or synthesis gases, which contain the components of the respective end product, particularly of ammonia, methanol, or other hydrocarbon compounds, as well as biotechnological facilities for fermenting synthesis gases; emission control systems consisting primarily of machinery and apparatus for reducing and processing gases that are harmful to the climate in steel production in particular in integrated steel mills; coke-oven machinery for producing coke and raw gas from coal by means of a distillation process, consisting primarily of industrial ovens for coke making with oven roofs for filling coke-oven batteries with coal and coke extinguisher equipment for quickly extinguishing and cooling produced coke; water cooling towers for gas turbine power plants and steam turbine power plants for electricity generation |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 031, 034, 035 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, June 6, 2017 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
US Class Codes | 013, 021, 023, 031, 034 |
Class Status Code | 6 - Active |
Class Status Date | Tuesday, June 6, 2017 |
Primary Code | 011 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | ThyssenKrupp AG |
Party Type | 30 - Original Registrant |
Legal Entity Type | 61 - NOT AVAILABLE |
Address | NOT AVAILABLE |
Party Name | ThyssenKrupp AG |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 61 - NOT AVAILABLE |
Address | DE |
Party Name | ThyssenKrupp AG |
Party Type | 10 - Original Applicant |
Legal Entity Type | 61 - NOT AVAILABLE |
Address | DE |
Event Date | Event Description |
Thursday, April 4, 2024 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Thursday, April 4, 2024 | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS |
Thursday, April 4, 2024 | TEAS WITHDRAWAL AS DOMESTIC REPRESENTATIVE RECEIVED |
Thursday, April 4, 2024 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Thursday, April 4, 2024 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Thursday, April 4, 2024 | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED |
Thursday, April 4, 2024 | TEAS CHANGE OF OWNER ADDRESS RECEIVED |
Tuesday, March 19, 2024 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
Friday, July 26, 2019 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Wednesday, July 10, 2019 | FINAL DISPOSITION NOTICE SENT TO IB |
Wednesday, July 10, 2019 | FINAL DISPOSITION PROCESSED |
Wednesday, June 19, 2019 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, March 19, 2019 | REGISTERED-PRINCIPAL REGISTER |
Sunday, February 10, 2019 | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED |
Thursday, January 10, 2019 | CHANGES/CORRECTIONS AFTER PUB APPROVAL ENTERED |
Wednesday, January 9, 2019 | ASSIGNED TO PETITION STAFF |
Friday, December 14, 2018 | TEAS POST PUBLICATION AMENDMENT RECEIVED |
Friday, November 23, 2018 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Wednesday, November 7, 2018 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, November 7, 2018 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Thursday, November 1, 2018 | EXTENSION OF TIME TO OPPOSE RECEIVED |
Tuesday, October 2, 2018 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, October 2, 2018 | PUBLISHED FOR OPPOSITION |
Friday, September 28, 2018 | NOTIFICATION PROCESSED BY IB |
Wednesday, September 12, 2018 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, September 12, 2018 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Wednesday, September 12, 2018 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Monday, August 27, 2018 | ASSIGNED TO LIE |
Thursday, August 16, 2018 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Thursday, August 16, 2018 | EXAMINER'S AMENDMENT ENTERED |
Thursday, August 16, 2018 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Thursday, August 16, 2018 | EXAMINERS AMENDMENT E-MAILED |
Thursday, August 16, 2018 | EXAMINERS AMENDMENT -WRITTEN |
Wednesday, July 11, 2018 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, July 10, 2018 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, July 10, 2018 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Thursday, January 11, 2018 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Thursday, January 11, 2018 | NON-FINAL ACTION E-MAILED |
Thursday, January 11, 2018 | NON-FINAL ACTION WRITTEN |
Monday, December 18, 2017 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, December 18, 2017 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Monday, December 18, 2017 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Tuesday, August 29, 2017 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Tuesday, August 29, 2017 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Saturday, July 8, 2017 | REFUSAL PROCESSED BY IB |
Monday, June 19, 2017 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Monday, June 19, 2017 | REFUSAL PROCESSED BY MPU |
Monday, June 12, 2017 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Sunday, June 11, 2017 | NON-FINAL ACTION WRITTEN |
Saturday, June 10, 2017 | APPLICATION FILING RECEIPT MAILED |
Tuesday, June 6, 2017 | ASSIGNED TO EXAMINER |
Tuesday, June 6, 2017 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, June 1, 2017 | SN ASSIGNED FOR SECT 66A APPL FROM IB |