Serial Number | 79208857 |
Word Mark | C 2 C |
Filing Date | Wednesday, November 2, 2016 |
Status | 709 - CANCELLED - SECTION 71 |
Status Date | Friday, September 5, 2025 |
Registration Number | 5677175 |
Registration Date | Tuesday, February 19, 2019 |
Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, August 21, 2018 |
Description of Mark | The mark consists of the alpha-numeric element "C2C". There is a circular carrier and inside this carrier are three smaller circles forming a triangular shape with a line from the top circle to each of the two bottom circles and with the number "2" appearing in the top circle and the letter "C" appearing in each of the bottom circles. |
Goods and Services | Steelworks and steelmills consisting primarily of steel converters for decarburizing pig iron by means of blowing refines oxygen, ladle treatment equipment for ladle furnaces to be used in steelworks and steelmills for carrying out metallurgical reactions in the ladle to operate a primary furnace as a high-speed melter and to adjust the final chemical composition and temperature of the steel after tapping and to perform certain metallurgical reactions, namely, to add deoxidizers, slag formers, and small amounts of alloying agents, vacuum treatment equipment for metallurgical vacuum treatment of molten steel using steel converters, continuous slab casting or ingot casting equipment; gas turbine power and steam turbine power electricity generation equipment consisting primarily of generators, low-pressure and high-pressure turbines, coal cutting mill machines; electrolysis machinery, namely, an electrolysis chamber to separate water into hydrogen and oxygen for increasing efficiency for use in internal combustion engines, turbines and air turbines, not for land vehicles |
Pseudo Mark | C TWO C; C TO C |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Goods and Services | Hot blast furnaces for pig iron production; gas pipeline systems, namely, switchable separators for the cleaning and purification of gases, smelting gases, coke-oven gases, blast furnace top gases, converter gases, process gases, as well as mixed gases and utility gases composed from the specified gases which occur in pig iron production, crude steel production, coke production; machinery for hydrogen production, hydrogen generators; machinery for ammonia synthesis and urea synthesis, namely, reactors for chemical liquefaction and separation for the transformation and production of the basic chemical compounds ammonia and urea, and valves for producing ammonia and urea; thermal oxidizers for industrial air pollution control, namely, machinery for converting carbon monoxide proportions of a smelting gas by means of a water-gas shift reaction or a steam reforming with water vapor or a partial oxidation with air and/or oxygen; separators for the cleaning and purification of gases, namely, machinery for separating process gases in a gas mixture by means of a pressure swing adsorption; gas purification machines, namely, machinery for gas purification and gas conditioning of utility gases, and facilities consisting thereof, for yielding, treatment, recovery, and/or production of chemical products from industrial exhaust gas emissions and/or synthesis gases, which contain the components of the respective end product, particularly of ammonia, methanol, or other hydrocarbon compounds, as well as biotechnological facilities for fermenting synthesis gases; emission control systems consisting primarily of machinery and apparatus for reducing and processing gases that are harmful to the climate in steel production in particular in integrated steel mills; coke-oven machinery for producing coke and raw gas from coal by means of a distillation process, consisting primarily of industrial ovens for coke making with oven roofs for filling coke-oven batteries with coal and coke extinguisher equipment for quickly extinguishing and cooling produced coke; water cooling towers for gas turbine power plants and steam turbine power plants for electricity generation |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 031, 034, 035 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, September 5, 2025 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
US Class Codes | 013, 021, 023, 031, 034 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, September 5, 2025 |
Primary Code | 011 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | thyssenkrupp Carbon2Chem GmbH |
Party Type | 31 - New Owner After Registration |
Legal Entity Type | 16 - Limited Liability Company |
Address | DE |
Party Name | thyssenkrupp AG |
Party Type | 31 - New Owner After Registration |
Legal Entity Type | 09 - Joint Stock Company |
Address | DE |
Party Name | ThyssenKrupp AG |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | DE |
Party Name | ThyssenKrupp AG |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | DE |
Party Name | ThyssenKrupp AG |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | DE |
Event Date | Event Description |
Thursday, June 1, 2017 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Monday, June 5, 2017 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Monday, June 5, 2017 | ASSIGNED TO EXAMINER |
Monday, June 5, 2017 | NON-FINAL ACTION WRITTEN |
Tuesday, June 6, 2017 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Friday, June 9, 2017 | APPLICATION FILING RECEIPT MAILED |
Friday, June 16, 2017 | REFUSAL PROCESSED BY MPU |
Tuesday, August 29, 2017 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Friday, June 16, 2017 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Saturday, July 8, 2017 | REFUSAL PROCESSED BY IB |
Tuesday, August 29, 2017 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Monday, December 18, 2017 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Monday, December 18, 2017 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, December 18, 2017 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, December 27, 2017 | NON-FINAL ACTION E-MAILED |
Wednesday, December 27, 2017 | NON-FINAL ACTION WRITTEN |
Wednesday, December 27, 2017 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Tuesday, June 26, 2018 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Tuesday, June 26, 2018 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, June 26, 2018 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, July 11, 2018 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, August 1, 2018 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, August 1, 2018 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Wednesday, August 1, 2018 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Friday, August 17, 2018 | NOTIFICATION PROCESSED BY IB |
Tuesday, August 21, 2018 | PUBLISHED FOR OPPOSITION |
Tuesday, August 21, 2018 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Thursday, September 20, 2018 | EXTENSION OF TIME TO OPPOSE RECEIVED |
Wednesday, November 7, 2018 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Wednesday, November 7, 2018 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Friday, November 23, 2018 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Friday, December 14, 2018 | TEAS POST PUBLICATION AMENDMENT RECEIVED |
Thursday, January 10, 2019 | POST PUBLICATION AMENDMENT - ENTERED |
Sunday, December 30, 2018 | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED |
Wednesday, January 9, 2019 | ASSIGNED TO PETITION STAFF |
Tuesday, February 19, 2019 | REGISTERED-PRINCIPAL REGISTER |
Friday, June 14, 2019 | FINAL DISPOSITION PROCESSED |
Thursday, April 4, 2024 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
Thursday, April 4, 2024 | TEAS WITHDRAWAL AS DOMESTIC REPRESENTATIVE RECEIVED |
Thursday, April 4, 2024 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
Thursday, April 4, 2024 | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS |
Thursday, April 4, 2024 | TEAS CHANGE OF OWNER ADDRESS RECEIVED |
Thursday, April 4, 2024 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Sunday, May 19, 2019 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Friday, June 14, 2019 | FINAL DISPOSITION NOTICE SENT TO IB |
Friday, July 5, 2019 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Monday, February 19, 2024 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
Thursday, April 4, 2024 | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED |
Thursday, August 7, 2025 | CHANGE OF OWNER RECEIVED FROM IB |
Friday, September 5, 2025 | CANCELLED SECTION 71 |