BUILDING THE ROAD AHEAD Trademark

Trademark Overview


On Monday, October 13, 2025, a trademark application was filed for BUILDING THE ROAD AHEAD with the United States Patent and Trademark Office. The USPTO has given the BUILDING THE ROAD AHEAD trademark a serial number of 99440483. The federal status of this trademark filing is NEW APPLICATION - RECORD INITIALIZED NOT ASSIGNED TO EXAMINER as of Monday, October 13, 2025. This trademark is owned by E.R. Snell Contractor, Inc.. The BUILDING THE ROAD AHEAD trademark is filed in the Non-Metallic Building Material Products and Construction & Repair Services categories with the following description:

Asphalt paving compositions, namely, liquid asphalt; asphalt-based sealants for use on pavement and concrete; asphalt millings made from recycled asphalt pavement, namely, uncrushed asphalt millings and crushed asphalt millings; road asphalt

construction services, namely, asphalt, grading, and concrete paving; construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; asphalting; construction of buildings and structures, namely, roads, bridges, and walls; construction of culverts, namely, arch, concrete box, and precast culverts; construction of airports and airport facilities; namely, airport grading and paving, resurfacing taxiways, building and repairing airports; construction services, namely, geosynthetic aggregate base construction for roads and parking lots; construction services, namely, residential asphalt, grading, and concrete paving; construction contractor services, namely, asphalt paving contractor services
building the road ahead

General Information


Serial Number99440483
Word MarkBUILDING THE ROAD AHEAD
Filing DateMonday, October 13, 2025
Status630 - NEW APPLICATION - RECORD INITIALIZED NOT ASSIGNED TO EXAMINER
Status DateMonday, October 13, 2025
Registration Number0000000
Registration DateNOT AVAILABLE
Mark Drawing4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form
Published for Opposition DateNOT AVAILABLE

Trademark Statements


Goods and ServicesAsphalt paving compositions, namely, liquid asphalt; asphalt-based sealants for use on pavement and concrete; asphalt millings made from recycled asphalt pavement, namely, uncrushed asphalt millings and crushed asphalt millings; road asphalt
Goods and Servicesconstruction services, namely, asphalt, grading, and concrete paving; construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; asphalting; construction of buildings and structures, namely, roads, bridges, and walls; construction of culverts, namely, arch, concrete box, and precast culverts; construction of airports and airport facilities; namely, airport grading and paving, resurfacing taxiways, building and repairing airports; construction services, namely, geosynthetic aggregate base construction for roads and parking lots; construction services, namely, residential asphalt, grading, and concrete paving; construction contractor services, namely, asphalt paving contractor services

Classification Information


International Class019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal.
US Class Codes001, 012, 033, 050
Class Status Code6 - Active
Class Status DateMonday, October 13, 2025
Primary Code019
First Use Anywhere DateThursday, August 31, 2023
First Use In Commerce DateThursday, August 31, 2023

International Class037 - Building construction; repair; installation services.
US Class Codes100, 103, 106
Class Status Code6 - Active
Class Status DateMonday, October 13, 2025
Primary Code037
First Use Anywhere DateThursday, August 31, 2023
First Use In Commerce DateThursday, August 31, 2023

Trademark Owner History


Party NameE.R. Snell Contractor, Inc.
Party Type10 - Original Applicant
Legal Entity Type03 - Corporation
AddressSnellville, GA 30078

Trademark Events


Event DateEvent Description
Monday, October 13, 2025NEW APPLICATION ENTERED
Monday, October 13, 2025NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Monday, October 13, 2025APPLICATION FILING RECEIPT MAILED