Serial Number | 79235987 |
Word Mark | BONATTI WPS GAZELLE |
Filing Date | Friday, December 22, 2017 |
Status | 602 - ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE |
Status Date | Wednesday, March 6, 2019 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | NOT AVAILABLE |
Description of Mark | The mark consists of the naming "BONATTI WPS GAZELLE" on two lines. On the first line, the name "BONATTI", preceded by the stylized representation of three triangular elements, converging to the bottom; a vertical straight line, followed by the initials WPS in vertical, is on the right side of the name; on the second line, there is the word GAZELLE. |
Goods and Services | Non-metal building materials, namely, rigid pipes for construction purposes, non-metallic transportable buildings |
Goods and Services | Machines and machine tools for treatment of materials and for manufacturing; motors and engines except for land vehicles; machine coupling and transmission components except for land vehicles; automatic vending machines; pumps and compressors as parts of machines, motors and engines; fans for motors and engines; pumps for the extraction of gases (machines); pumps for the extraction of liquids (machines); sludge pumps |
Goods and Services | Building materials, namely, transportable buildings of metal, prefabricated metal buildings, prefabricated buildings made substantially of metal; non-electric cables and wires of common metal; metal containers for the storage and transportation of goods |
Description of the Colors Claimed | Word elements and vertical line in black; triangular elements in red. |
Goods and Services | Building construction and repair; laying and construction of pipelines; installation of industrial plants; construction project management services in the field of construction of offshore oil and gas facilities; maintenance of oil and petrochemical installations; turnkey construction of installations for transporting liquids; transport infrastructure; civil and industrial construction; repair of off-shore installations; extraction of gas; oil and gas drilling; construction of structures for transporting petroleum and natural gas; drilling of oil or gas wells; construction of pipelines; construction of fountains; pipeline construction and maintenance; drilling and pumping of oil |
Indication of Colors claimed | The color(s) red and black is/are claimed as a feature of the mark. |
Goods and Services | Engineering services in the fields of oil and gas industry; consultancy and survey services in the field of engineering; research in the field of ecology; geological surveys and research; oil-field surveys; oil-field testing; design of oil-field surveys; analysis for oil-field exploitation; oil-well testing; oil-well surveys; design of oil-well surveys; analysis for oil-well exploitation; analysis of oil reservoirs; analysis and testing services in the field of oil industry |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, July 13, 2018 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 031, 034, 035 |
Class Status Code | 6 - Active |
Class Status Date | Friday, July 13, 2018 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Friday, July 13, 2018 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Friday, July 13, 2018 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Friday, July 13, 2018 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | BONATTI S.p.A. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 09 - Joint Stock Company |
Address | IT |
Event Date | Event Description |
Saturday, March 30, 2024 | NEW REPRESENTATIVE AT IB RECEIVED |
Friday, March 27, 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Friday, March 6, 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
Friday, March 6, 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Friday, December 27, 2019 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Wednesday, December 11, 2019 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, December 11, 2019 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Wednesday, March 6, 2019 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
Wednesday, March 6, 2019 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
Saturday, August 25, 2018 | REFUSAL PROCESSED BY IB |
Wednesday, August 8, 2018 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Wednesday, August 8, 2018 | REFUSAL PROCESSED BY MPU |
Wednesday, July 25, 2018 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Tuesday, July 24, 2018 | NON-FINAL ACTION WRITTEN |
Tuesday, July 17, 2018 | APPLICATION FILING RECEIPT MAILED |
Friday, July 13, 2018 | ASSIGNED TO EXAMINER |
Friday, July 13, 2018 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Thursday, July 12, 2018 | LIMITATION FROM ORIGINAL APPLICATION ENTERED |
Thursday, July 5, 2018 | SN ASSIGNED FOR SECT 66A APPL FROM IB |