Serial Number | 79235991 |
Word Mark | BONATTI WELL PRODUCTION SERVICES |
Filing Date | Friday, December 22, 2017 |
Status | 602 - ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE |
Status Date | Tuesday, March 5, 2019 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | NOT AVAILABLE |
Description of Mark | The mark consists of the naming "BONATTI WELL PRODUCTION SERVICES", preceded by stylized representation of three triangular elements, converging to the bottom; a vertical straight line is on the right side of the name BONATTI, followed by the wording WELL PRODUCTION SERVICES, on three lines. |
Goods and Services | Non-metal building materials, namely, rigid pipes for construction purposes, non-metallic transportable buildings |
Goods and Services | Machines and machine tools for treatment of materials and for manufacturing; motors and engines except for land vehicles; machine coupling and transmission components except for land vehicles; automatic vending machines; pumps and compressors as parts of machines, motors and engines; fans for motors and engines; pumps for the extraction of gases (machines); pumps for the extraction of liquids (machines); sludge pumps |
Goods and Services | Building materials, namely, transportable buildings of metal, prefabricated metal buildings, prefabricated buildings made substantially of metal; non-electric cables and wires of common metal; metal containers for the storage and transportation of goods |
Description of the Colors Claimed | Word elements and vertical line in black; triangular elements in red. |
Goods and Services | Building construction and repair; laying and construction of pipelines; installation of industrial plants; construction project management services in the field of construction of offshore oil and gas facilities; maintenance of oil and petrochemical installations; turnkey construction of installations for transporting liquids; transport infrastructure; civil and industrial construction; repair of off-shore installations; extraction of gas; oil and gas drilling; construction of structures for transporting petroleum and natural gas; drilling of oil or gas wells; construction of pipelines; construction of fountains; pipeline construction and maintenance; drilling and pumping of oil |
Indication of Colors claimed | The color(s) red and black is/are claimed as a feature of the mark. |
Goods and Services | Engineering services in the fields of oil and gas industry; consultancy and survey services in the field of engineering; research in the field of ecology; geological surveys and research; oil-field surveys; oil-field testing; design of oil-field surveys; analysis for oil-field exploitation; oil-well testing; oil-well surveys; design of oil-well surveys; analysis for oil-well exploitation; analysis of oil reservoirs; analysis and testing services in the field of oil industry |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, July 12, 2018 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements other than hand-operated; incubators for eggs. |
US Class Codes | 013, 019, 021, 023, 031, 034, 035 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, July 12, 2018 |
Primary Code | 007 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, July 12, 2018 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, July 12, 2018 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, July 12, 2018 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | BONATTI S.p.A. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 09 - Joint Stock Company |
Address | IT |
Event Date | Event Description |
Saturday, March 30, 2024 | NEW REPRESENTATIVE AT IB RECEIVED |
Friday, March 20, 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Thursday, March 5, 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
Thursday, March 5, 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Friday, December 27, 2019 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Wednesday, December 11, 2019 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, December 11, 2019 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Tuesday, March 5, 2019 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
Tuesday, March 5, 2019 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
Saturday, August 25, 2018 | REFUSAL PROCESSED BY IB |
Tuesday, August 7, 2018 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Tuesday, August 7, 2018 | REFUSAL PROCESSED BY MPU |
Tuesday, July 24, 2018 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Monday, July 23, 2018 | NON-FINAL ACTION WRITTEN |
Tuesday, July 17, 2018 | APPLICATION FILING RECEIPT MAILED |
Thursday, July 12, 2018 | ASSIGNED TO EXAMINER |
Thursday, July 12, 2018 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Tuesday, July 10, 2018 | LIMITATION FROM ORIGINAL APPLICATION ENTERED |
Thursday, July 5, 2018 | SN ASSIGNED FOR SECT 66A APPL FROM IB |