Serial Number | 77655431 |
Word Mark | BLUE CANYON HEALTHY HOME SYSTEM FOUNDATION EXPERTS |
Filing Date | Friday, January 23, 2009 |
Status | 710 - CANCELLED - SECTION 8 |
Status Date | Friday, April 1, 2016 |
Registration Number | 3672323 |
Registration Date | Tuesday, August 25, 2009 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, June 9, 2009 |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
Disclaimer with Predetermined Text | "HEALTHY HOME SYSTEM" AND "FOUNDATION EXPERTS" |
Description of Mark | The mark consists of the words "BLUE CANYON HEALTHY HOME SYSTEM", "FOUNDATION EXPERTS" and circular design containing an oval and design element extending from within the oval to the outer boundary of the circular design. |
Goods and Services | Basement ventilation, radon and harmful gas mitigation, humidity reduction, and air quality control system comprised of air flow ventilation infrastructure, namely, piping and dampers, air exhaust equipment, antimicrobial spray treatment, and climate and environmental monitoring and support equipment; crawlspace ventilation, radon and harmful gas mitigation, humidity reduction, and air quality control system comprised of air flow ventilation infrastructure, namely, piping and dampers, air exhaust equipment, antimicrobial spray treatment, dehumidifier, and encapsulation sheeting; consultation in the field of a basement ventilation, radon and harmful gas mitigation, humidity reduction, and air quality control system; consultation in the field of a crawlspace ventilation, radon and harmful gas mitigation, humidity reduction, and air quality control system |
Goods and Services | Foundation, chimney, footer, porch stoop, slab floor, and wall repair services; consultation services in the fields of foundation, chimney, footer, porch stoop, slab floor, and wall repair; installation and maintenance in the field of a basement ventilation, radon and harmful gas mitigation, humidity reduction, and air quality control system; installation and maintenance in the field of a crawlspace ventilation, radon and harmful gas mitigation, humidity reduction, and air quality control system; remodeling of basements; consultation in the field of basement remodeling; construction management |
International Class | 011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply, and sanitary purposes. |
US Class Codes | 013, 021, 023, 031, 034 |
Class Status Code | 2 - Sec. 8 - Entire Registration |
Class Status Date | Friday, April 1, 2016 |
Primary Code | 011 |
First Use Anywhere Date | Wednesday, April 30, 2008 |
First Use In Commerce Date | Wednesday, April 30, 2008 |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | 2 - Sec. 8 - Entire Registration |
Class Status Date | Friday, April 1, 2016 |
Primary Code | 037 |
First Use Anywhere Date | Wednesday, April 30, 2008 |
First Use In Commerce Date | Wednesday, April 30, 2008 |
Party Name | Blue Canyon Solutions, LLC |
Party Type | 30 - Original Registrant |
Legal Entity Type | 16 - Limited Liability Company |
Address | Louisville, KY 40202 |
Party Name | Blue Canyon Solutions, LLC |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 16 - Limited Liability Company |
Address | Louisville, KY 40202 |
Party Name | Blue Canyon Solutions, LLC |
Party Type | 10 - Original Applicant |
Legal Entity Type | 16 - Limited Liability Company |
Address | Louisville, KY 40202 |
Event Date | Event Description |
Friday, April 1, 2016 | CANCELLED SEC. 8 (6-YR) |
Tuesday, August 25, 2009 | REGISTERED-PRINCIPAL REGISTER |
Tuesday, June 9, 2009 | PUBLISHED FOR OPPOSITION |
Wednesday, May 20, 2009 | NOTICE OF PUBLICATION |
Monday, May 4, 2009 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Monday, April 27, 2009 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Monday, April 27, 2009 | EXAMINER'S AMENDMENT ENTERED |
Monday, April 27, 2009 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Monday, April 27, 2009 | EXAMINERS AMENDMENT E-MAILED |
Monday, April 27, 2009 | EXAMINERS AMENDMENT -WRITTEN |
Tuesday, April 14, 2009 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, April 14, 2009 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, April 14, 2009 | ASSIGNED TO LIE |
Monday, April 13, 2009 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Tuesday, March 31, 2009 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Tuesday, March 31, 2009 | NON-FINAL ACTION E-MAILED |
Tuesday, March 31, 2009 | NON-FINAL ACTION WRITTEN |
Tuesday, March 31, 2009 | ASSIGNED TO EXAMINER |
Wednesday, January 28, 2009 | NOTICE OF DESIGN SEARCH CODE MAILED |
Tuesday, January 27, 2009 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |