
| Serial Number | 79383469 |
| Word Mark | BKV CONNECT |
| Filing Date | Thursday, September 28, 2023 |
| Status | 681 - PUBLICATION/ISSUE REVIEW COMPLETE |
| Status Date | Monday, December 22, 2025 |
| Registration Number | 0000000 |
| Registration Date | NOT AVAILABLE |
| Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
| Published for Opposition Date | Tuesday, January 13, 2026 |
| NOT AVAILABLE | "CONNECT" as to "CONNECTING MODULES" |
| Goods and Services | Wireless transmitters; Wireless receivers; Wireless communication devices for transmitting data collected by measuring and monitoring sensors for industrial machinery; Data transmission apparatus; Intelligent gateways, namely, gateway routers for real-time data analysis; Intelligent gateways for data processing in relation to industrial machinery operations, namely, mobile computing and operating platforms consisting of data transceivers, wireless networks and gateways for collection, management and analysis of real-time data; Connecting modules, namely, data receivers and transmitters for electric controls; Computer hardware for remotely accessing and transmitting data in the nature of numerical performance and operation data collected by measuring and monitoring sensors for industrial machinery; Vibration sensors; Vibration meters; Sensor controllers for controlling the operation of sensors that detect, measure and monitor vibration, displacement, velocity, acceleration and condition of industrial machinery; Motion sensors; Measuring sensors, namely, sensors for measuring vibration, displacement, velocity, acceleration and condition of industrial machinery; Sensors, detectors and monitoring instruments, not for medical use, all of the aforementioned being for detecting, measuring and monitoring the vibration, displacement, velocity, acceleration and condition of industrial machinery; Sensors used in industrial plant control, namely, detecting, measuring and monitoring the vibration, displacement, velocity, acceleration and condition of industrial machinery; Vibration sensors for detecting, measuring and monitoring the vibration and condition of industrial machinery for installation in windmill housings; Sensors for detecting, measuring and monitoring vibration, displacement, velocity and acceleration for use in the control of engines; Data collection apparatus, namely, sensors for detecting, measuring and monitoring the vibration and condition of industrial machinery and transmitting data to centralized software platforms for monitoring and evaluation of the data |
| Pseudo Mark | BRUEL AND KJAER VIBRO CONNECT |
| International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
| US Class Codes | 021, 023, 026, 036, 038 |
| Class Status Code | 6 - Active |
| Class Status Date | Monday, November 20, 2023 |
| Primary Code | 009 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | Brüel & Kjaer Vibro GmbH |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 99 - Other |
| Address | DE |
| Event Date | Event Description |
| Thursday, November 16, 2023 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
| Monday, November 20, 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Friday, November 24, 2023 | APPLICATION FILING RECEIPT MAILED |
| Monday, May 20, 2024 | ASSIGNED TO EXAMINER |
| Monday, May 20, 2024 | NON-FINAL ACTION WRITTEN |
| Wednesday, June 5, 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Wednesday, June 5, 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Monday, June 24, 2024 | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW |
| Saturday, July 6, 2024 | NON-FINAL ACTION WRITTEN |
| Tuesday, April 15, 2025 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
| Tuesday, April 15, 2025 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Tuesday, April 22, 2025 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Thursday, April 24, 2025 | REFUSAL PROCESSED BY MPU |
| Thursday, April 24, 2025 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Monday, April 28, 2025 | ATTORNEY REVIEW COMPLETED |
| Saturday, May 3, 2025 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Friday, May 9, 2025 | REFUSAL PROCESSED BY IB |
| Friday, October 24, 2025 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Friday, October 24, 2025 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Friday, October 24, 2025 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Saturday, November 15, 2025 | NON-FINAL ACTION WRITTEN |
| Saturday, November 15, 2025 | NON-FINAL ACTION E-MAILED |
| Saturday, November 15, 2025 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
| Wednesday, December 10, 2025 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Wednesday, December 10, 2025 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Wednesday, December 10, 2025 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Friday, December 12, 2025 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Tuesday, December 23, 2025 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Wednesday, December 24, 2025 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |