
| Serial Number | 79124038 |
| Word Mark | BIG FOOT SYSTEMS |
| Filing Date | Wednesday, October 10, 2012 |
| Status | 707 - PARTIAL SECTION 71 ACCEPTED |
| Status Date | Friday, July 22, 2022 |
| Registration Number | 4896720 |
| Registration Date | Tuesday, February 9, 2016 |
| Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
| Published for Opposition Date | Tuesday, November 24, 2015 |
| Description of Mark | The mark consists of a stylized triangular design inside of a circle above the wording "BIG FOOT SYSTEMS", all inside a polygon. |
| Goods and Services | Non-metallic frameworks for use in rooftop equipment support systems; [ non-metallic building materials, namely, stationary pre-fabricated walkways; non-metallic stairs and steps; non-metallic ducting; non-metallic railings; non-metallic protective railings; ] non-metallic goods for use in rooftop equipment support systems, namely, cross-over platforms, platform bases, non-metallic conduits for plumbing and drainage; all the aforementioned goods being for use in the support of plant, equipment, safe access systems and associated building services |
| Goods and Services | Metal building materials for use in rooftop equipment support systems, namely, rooftop mounted building services equipment being metal supports for metal pipework, metal cable trays/raceways, metal conduits, ducting for use in heating, ventilation and air conditioning systems; frameworks of metal for use in rooftop equipment support systems, namely, the support of heat pumps, variable refrigerant flow (VRF) air conditioning units, chillers for refrigeration and ventilation equipment in the nature of air handling units; [ stairs and steps of common metal; ] metal ducting for use in the support of heat pumps, variable refrigerant flow (VRF) air conditioning units, chillers for refrigeration and ventilation equipment in the nature of air handling units; [ metal building materials, namely, stationary prefabricated walkways of common metal; metal railings; protective railings of metal; goods of metal for use in rooftop support systems, namely, metal cross-over platforms, metal walkways, metal platforms; ] all the aforementioned goods being for use in the support of plant, equipment, safe access systems and associated building services |
| Goods and Services | [ Plastic sheets, bars, blocks, pellets, tubes for use in the manufacture of building materials, namely, mounting platforms for the support of light building services equipment, pipe supports, cable tray supports and ductwork supports for heating, ventilation, refrigeration and air conditioning systems and installations and platform bases for the support of solar panels; plastic sheets, bars, blocks, pellets, tubes for use in the manufacture of rooftop equipment support systems; insulating materials; flexible non-metallic pipes; all the aforementioned goods being for use in the support of plant, equipment, safe access systems and associated building services ] |
| Goods and Services | Building services, namely, construction [ and repair ] services relating to rooftop equipment support systems; [ repair, ] installation [ and maintenance ]services relating to rooftop equipment support systems; all the aforementioned services being for use in the support of plant, equipment, safe access systems and associated building services |
| Indication of Colors claimed | Color is not claimed as a feature of the mark. |
| NOT AVAILABLE | "SYSTEMS" |
| Goods and Services | Advisory services, namely, consultation relating to the design of engineering products; design services relating to the design and installation of rooftop equipment support systems; design engineering services relating to rooftop equipment support systems; all the aforementioned services being for use in the support of plant, equipment, safe access systems and associated building services |
| International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
| US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, January 25, 2013 |
| Primary Code | 006 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 017 - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal. |
| US Class Codes | 001, 005, 012, 013, 035, 050 |
| Class Status Code | G - NOT AVAILABLE |
| Class Status Date | Friday, July 22, 2022 |
| Primary Code | 017 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
| US Class Codes | 001, 012, 033, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, January 25, 2013 |
| Primary Code | 019 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 037 - Building construction; repair; installation services. |
| US Class Codes | 100, 103, 106 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, January 25, 2013 |
| Primary Code | 037 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
| US Class Codes | 100, 101 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, January 25, 2013 |
| Primary Code | 042 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | Aspen Pumps Limited |
| Party Type | 31 - New Owner After Registration |
| Legal Entity Type | 98 - Unknown |
| Address | GB |
| Party Name | BIG FOOT SYSTEMS LIMITED |
| Party Type | 30 - Original Registrant |
| Legal Entity Type | 99 - Other |
| Address | East Sussex BN27 3WA GB |
| Party Name | BIG FOOT SYSTEMS LIMITED |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 99 - Other |
| Address | East Sussex BN27 3WA GB |
| Party Name | BIG FOOT SYSTEMS LIMITED |
| Party Type | 11 - New Owner Before Publication |
| Legal Entity Type | 99 - Other |
| Address | East Sussex BN27 3WA GB |
| Party Name | ASPEN PUMPS LIMITED |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 99 - Other |
| Address | GB |
| Event Date | Event Description |
| Monday, February 18, 2013 | NON-FINAL ACTION WRITTEN |
| Tuesday, February 19, 2013 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Thursday, January 24, 2013 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
| Friday, January 25, 2013 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Tuesday, January 29, 2013 | APPLICATION FILING RECEIPT MAILED |
| Friday, February 8, 2013 | ASSIGNED TO EXAMINER |
| Monday, February 11, 2013 | ASSIGNED TO EXAMINER |
| Monday, August 19, 2013 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Wednesday, September 11, 2013 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
| Tuesday, February 19, 2013 | REFUSAL PROCESSED BY MPU |
| Tuesday, February 19, 2013 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Tuesday, March 19, 2013 | REFUSAL PROCESSED BY IB |
| Monday, August 19, 2013 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, August 20, 2013 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Wednesday, September 11, 2013 | SUSPENSION LETTER WRITTEN |
| Wednesday, September 11, 2013 | LETTER OF SUSPENSION E-MAILED |
| Friday, April 17, 2015 | NON-FINAL ACTION E-MAILED |
| Friday, March 14, 2014 | ASSIGNED TO LIE |
| Wednesday, March 19, 2014 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
| Wednesday, June 25, 2014 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
| Wednesday, June 25, 2014 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Saturday, July 12, 2014 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Thursday, September 18, 2014 | CHANGE OF OWNER RECEIVED FROM IB |
| Wednesday, September 24, 2014 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
| Wednesday, March 25, 2015 | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION |
| Friday, April 17, 2015 | NON-FINAL ACTION WRITTEN |
| Friday, April 17, 2015 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
| Wednesday, November 4, 2015 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
| Tuesday, October 13, 2015 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Tuesday, October 13, 2015 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, October 13, 2015 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Wednesday, October 14, 2015 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Wednesday, October 14, 2015 | DATA MODIFICATION COMPLETED |
| Thursday, October 22, 2015 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
| Wednesday, November 4, 2015 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
| Wednesday, November 4, 2015 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
| Thursday, August 3, 2017 | NEW REPRESENTATIVE AT IB RECEIVED |
| Friday, November 20, 2015 | NOTIFICATION PROCESSED BY IB |
| Tuesday, November 24, 2015 | PUBLISHED FOR OPPOSITION |
| Tuesday, November 24, 2015 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
| Tuesday, February 9, 2016 | REGISTERED-PRINCIPAL REGISTER |
| Monday, May 9, 2016 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Wednesday, May 11, 2016 | FINAL DISPOSITION PROCESSED |
| Wednesday, May 11, 2016 | FINAL DISPOSITION NOTICE SENT TO IB |
| Tuesday, August 9, 2016 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
| Friday, August 19, 2016 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Tuesday, February 9, 2021 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
| Monday, March 8, 2021 | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED |
| Monday, March 8, 2021 | TEAS CHANGE OF OWNER ADDRESS RECEIVED |
| Monday, March 8, 2021 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
| Monday, March 8, 2021 | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS |
| Monday, March 8, 2021 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
| Monday, March 8, 2021 | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS |
| Monday, March 8, 2021 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
| Wednesday, February 9, 2022 | TEAS SECTION 71 RECEIVED |
| Tuesday, July 19, 2022 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
| Friday, July 22, 2022 | REGISTERED - PARTIAL SEC 71 ACCEPTED |
| Friday, September 2, 2022 | NEW REPRESENTATIVE AT IB RECEIVED |
| Friday, July 22, 2022 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED |
| Saturday, April 29, 2023 | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
| Friday, July 26, 2024 | CHANGE OF OWNER RECEIVED FROM IB |
| Thursday, October 27, 2022 | INTERNATIONAL REGISTRATION RENEWED |
| Wednesday, March 22, 2023 | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED |
| Friday, April 28, 2023 | INVALIDATION PROCESSED |
| Monday, June 12, 2023 | PARTIAL INVALIDATION PROCESSED BY THE IB |
| Sunday, October 1, 2023 | NEW REPRESENTATIVE AT IB RECEIVED |
| Sunday, February 9, 2025 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED |