BERTILO Trademark

Trademark Overview


On Wednesday, February 18, 2026, a trademark application was filed for BERTILO with the United States Patent and Trademark Office. The USPTO has given the BERTILO trademark a serial number of 79448399. The federal status of this trademark filing is NON-FINAL ACTION COUNTED - NOT MAILED as of Wednesday, June 10, 2026. This trademark is owned by OÜ Baltic Connexions. The BERTILO trademark is filed in the Non-Metallic Building Material Products category with the following description:

Buildings, not of metal; portable and modular constructions (non-metallic); prefabricated houses [kits]; garden shelters, summer houses, maisonettes (non-metallic); modular homes, not of metal; sectional buildings (non-metallic -); prefabricated non-metal buildings; bicycle sheds [structures] of non-metallic materials; kiosks [non-metallic structures]; arbours [structures not of metal]; pergolas (non-metallic -); modular shelters (non-metallic -); prefabricated non-metal buildings; prefabricated building elements (non-metallic -) for on site assembly; modular units (non-metallic -) for constructing prefabricated buildings; fencing panels (non-metallic -); balustrades, not of metal; framework for building, not of metal; stairways, not of metal for use in buildings; screens, not of metal; movable partitions [walls] of non-metallic materials; plant screens [trellis], not of metal; non-metal pickets; fence posts of non-metallic materials; non-metal fence stays; temporary floors, not of met...
bertilo

General Information


Serial Number79448399
Word MarkBERTILO
Filing DateWednesday, February 18, 2026
Status640 - NON-FINAL ACTION COUNTED - NOT MAILED
Status DateWednesday, June 10, 2026
Registration Number0000000
Registration DateNOT AVAILABLE
Mark Drawing3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s)
Published for Opposition DateNOT AVAILABLE

Trademark Statements


Description of MarkThe mark consists of the wording "Bertilo" in stylized font with a diamond-shaped dot appearing at the top of the letter "i".
Goods and ServicesBuildings, not of metal; portable and modular constructions (non-metallic); prefabricated houses [kits]; garden shelters, summer houses, maisonettes (non-metallic); modular homes, not of metal; sectional buildings (non-metallic -); prefabricated non-metal buildings; bicycle sheds [structures] of non-metallic materials; kiosks [non-metallic structures]; arbours [structures not of metal]; pergolas (non-metallic -); modular shelters (non-metallic -); prefabricated non-metal buildings; prefabricated building elements (non-metallic -) for on site assembly; modular units (non-metallic -) for constructing prefabricated buildings; fencing panels (non-metallic -); balustrades, not of metal; framework for building, not of metal; stairways, not of metal for use in buildings; screens, not of metal; movable partitions [walls] of non-metallic materials; plant screens [trellis], not of metal; non-metal pickets; fence posts of non-metallic materials; non-metal fence stays; temporary floors, not of metal; non-metal rails; building materials and elements (not of metal) for saunas; building components of wood; planks (wood for building); porches, not of metal, for building.

Classification Information


International Class019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal.
US Class Codes001, 012, 033, 050
Class Status Code6 - Active
Class Status DateThursday, April 23, 2026
Primary Code019
First Use Anywhere DateNOT AVAILABLE
First Use In Commerce DateNOT AVAILABLE

Trademark Owner History


Party NameOÜ Baltic Connexions
Party Type10 - Original Applicant
Legal Entity Type99 - Other
AddressEE

Trademark Events


Event DateEvent Description
Thursday, April 23, 2026SN ASSIGNED FOR SECT 66A APPL FROM IB
Monday, April 27, 2026NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Monday, April 27, 2026APPLICATION FILING RECEIPT MAILED
Tuesday, June 9, 2026ASSIGNED TO EXAMINER
Wednesday, June 10, 2026NON-FINAL ACTION WRITTEN
Thursday, June 11, 2026NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW