
| Serial Number | 79345892 |
| Word Mark | BARLINEK NEXT STEP WATERPROOF HYBRID FLOORS |
| Filing Date | Friday, January 28, 2022 |
| Status | 602 - ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE |
| Status Date | Monday, August 7, 2023 |
| Registration Number | 0000000 |
| Registration Date | NOT AVAILABLE |
| Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
| Published for Opposition Date | NOT AVAILABLE |
| Goods and Services | Wood joints; construction plastic systems for mounting planks and wooden components; construction fixings, connectors, joints and holders for mounting and connecting boards and elements of wood; construction fasteners for boards and elements of wood; expansion joints of non-metallic materials for use in construction; milled joints in wooden panels and boards with a plastic element for laying floorboards in a traditional herringbone pattern without using the right and left woodblocks; floors, not of metal; wooden flooring; planks; parquet floor boards; duckboards, not of metal; floor boards, adhesive and non-adhesive; floor panels; parquet flooring, mosaics; floor tiles, not of metal; parquet floor boards; skirting; hybrid flooring with an external wooden layer and core including stone powder and pcv resin; pcv floors; hybrid flooring with an external wooden layer and core including stone powder and resin; rigid core floorings, resistant to water and high temperature fluctuations, made of minerals combined with a polymer; laminated parquet flooring; floating floors; rubber flooring; artificial wood flooring; plinths; sawn timber for floors; terrace boards; wooden components for decking and balconies; timber (sawn-), dressed timber, manufactured timber, veneer wood, building timber, building timber, worked timber; staircases, not of metal; wooden staircases; banisters; balustrading; handrails; wood veneers; veneer wood; wooden wainscoting |
| International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
| US Class Codes | 001, 012, 033, 050 |
| Class Status Code | 6 - Active |
| Class Status Date | Friday, July 29, 2022 |
| Primary Code | 019 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | BARLINEK S.A. |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 98 - Unknown |
| Address | PL |
| Event Date | Event Description |
| Thursday, July 28, 2022 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
| Friday, July 29, 2022 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Tuesday, August 2, 2022 | APPLICATION FILING RECEIPT MAILED |
| Tuesday, November 8, 2022 | ASSIGNED TO EXAMINER |
| Monday, November 14, 2022 | NON-FINAL ACTION WRITTEN |
| Tuesday, November 15, 2022 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| Friday, January 20, 2023 | REFUSAL PROCESSED BY MPU |
| Friday, January 20, 2023 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| Tuesday, February 14, 2023 | REFUSAL PROCESSED BY IB |
| Tuesday, February 21, 2023 | ASSIGNED TO EXAMINER |
| Monday, August 7, 2023 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
| Monday, August 7, 2023 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
| Monday, August 7, 2023 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
| Wednesday, January 3, 2024 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
| Thursday, August 8, 2024 | FINAL DISPOSITION NOTICE SENT TO IB |
| Thursday, August 8, 2024 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
| Saturday, August 24, 2024 | FINAL DECISION TRANSACTION PROCESSED BY IB |
| Monday, January 29, 2024 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
| Friday, January 5, 2024 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |