
| Serial Number | 97467497 |
| Word Mark | BAAS |
| Filing Date | Monday, June 20, 2022 |
| Status | 733 - FOURTH EXTENSION - GRANTED |
| Status Date | Thursday, October 30, 2025 |
| Registration Number | 0000000 |
| Registration Date | NOT AVAILABLE |
| Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
| Published for Opposition Date | Tuesday, September 5, 2023 |
| Goods and Services | Design of tunnels and underground structures; Providing temporary use online non-downloadable software for management, control, mapping, operation, and leasing of tunnels, subsurface real estate, and underground structures; Engineering design services in the field of construction; Engineering system analysis; Technical advice and technical assistance, namely, engineering services in the field of utility tunnel design and maintenance; Structural analysis and expertise services for the design and construction of underground utility tunnels; Providing temporary use online non-downloadable software for design, management, and operation of tunnels; Providing temporary use non-downloadable software for management of underground real estate; Design and management of underground real estate |
| Goods and Services | Construction and construction management of tunnels and underground structures; Consulting in the field of construction and construction management of tunnels and underground structures; Providing information about construction of tunnels and underground structures; Construction of civil engineering structures underground; Construction of underground boring tunnels; Construction management of tunnels for others; Construction and excavation services, namely, directional drilling, tunneling and earth boring; Directional drilling, tunneling and earth boring tunnels for utilities; Directional drilling, tunneling and earth boring for power lines, fiber, pipelines, and transportation uses; Construction services, namely, underground drilling of tunnels and underground structures; Construction of underground utility lines; Power construction services; Construction management of tunnels and underground structures for others; Underground boring as a service; Construction of large diameter tunnels; Construction and construction management of large diameter utility tunnels; Construction and excavation services, namely, rock drilling; Trenchless tunnel construction services; Directional drilling of tunnels; Lining the interior of a tunnel by applying a fluid-impervious barrier ; Pipeline construction and pipeline installation; Plumbing services, namely, installing, repairing, and replacing sewer pipes, water pipes, and gas pipes using directional drilling methods; Inspection services in the course of construction of utility tunnels; Consulting services in the field of construction of tunnels and underground structures; Maintenance of industrial machinery and equipment used in drilling and boring underground; Consultation services in the field of construction; Real estate development; Construction of underground real estate using tunnels |
| International Class | 037 - Building construction; repair; installation services. |
| US Class Codes | 100, 103, 106 |
| Class Status Code | 6 - Active |
| Class Status Date | Thursday, July 7, 2022 |
| Primary Code | 037 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
| US Class Codes | 100, 101 |
| Class Status Code | 6 - Active |
| Class Status Date | Thursday, July 7, 2022 |
| Primary Code | 042 |
| First Use Anywhere Date | NOT AVAILABLE |
| First Use In Commerce Date | NOT AVAILABLE |
| Party Name | EarthGrid PBC |
| Party Type | 20 - Owner at Publication |
| Legal Entity Type | 03 - Corporation |
| Address | Richmond, CA 94801 |
| Party Name | EarthGrid PBC |
| Party Type | 10 - Original Applicant |
| Legal Entity Type | 03 - Corporation |
| Address | Berkeley, CA 94705 |
| Event Date | Event Description |
| Thursday, June 23, 2022 | NEW APPLICATION ENTERED |
| Thursday, July 7, 2022 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| Thursday, January 5, 2023 | TEAS VOLUNTARY AMENDMENT RECEIVED |
| Tuesday, March 21, 2023 | ASSIGNED TO LIE |
| Tuesday, March 21, 2023 | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED |
| Thursday, March 30, 2023 | ASSIGNED TO EXAMINER |
| Monday, April 10, 2023 | NON-FINAL ACTION WRITTEN |
| Monday, April 10, 2023 | NON-FINAL ACTION E-MAILED |
| Monday, April 10, 2023 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
| Monday, July 10, 2023 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
| Monday, July 10, 2023 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
| Tuesday, July 11, 2023 | TEAS/EMAIL CORRESPONDENCE ENTERED |
| Friday, July 28, 2023 | EXAMINERS AMENDMENT -WRITTEN |
| Friday, July 28, 2023 | EXAMINERS AMENDMENT E-MAILED |
| Friday, July 28, 2023 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
| Friday, July 28, 2023 | EXAMINER'S AMENDMENT ENTERED |
| Friday, July 28, 2023 | APPROVED FOR PUB - PRINCIPAL REGISTER |
| Wednesday, August 16, 2023 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
| Tuesday, September 5, 2023 | PUBLISHED FOR OPPOSITION |
| Tuesday, September 5, 2023 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
| Tuesday, October 31, 2023 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
| Friday, April 26, 2024 | SOU TEAS EXTENSION RECEIVED |
| Friday, April 26, 2024 | SOU EXTENSION 1 FILED |
| Friday, April 26, 2024 | SOU EXTENSION 1 GRANTED |
| Saturday, April 27, 2024 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
| Wednesday, October 23, 2024 | SOU TEAS EXTENSION RECEIVED |
| Wednesday, October 23, 2024 | SOU EXTENSION 2 FILED |
| Wednesday, October 23, 2024 | SOU EXTENSION 2 GRANTED |
| Wednesday, October 23, 2024 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
| Tuesday, April 29, 2025 | SOU TEAS EXTENSION RECEIVED |
| Tuesday, April 29, 2025 | SOU EXTENSION 3 FILED |
| Wednesday, April 30, 2025 | SOU EXTENSION 3 GRANTED |
| Wednesday, April 30, 2025 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
| Thursday, October 30, 2025 | SOU TEAS EXTENSION RECEIVED |
| Thursday, October 30, 2025 | SOU EXTENSION 4 FILED |
| Thursday, October 30, 2025 | SOU EXTENSION 4 GRANTED |
| Friday, October 31, 2025 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |