ARGO PROJECT ACCIONA RESEARCH ON GBS FOR OFFSHORE WIND Trademark

Trademark Overview


On Tuesday, November 23, 2021, a trademark application was filed for ARGO PROJECT ACCIONA RESEARCH ON GBS FOR OFFSHORE WIND with the United States Patent and Trademark Office. The USPTO has given the ARGO PROJECT ACCIONA RESEARCH ON GBS FOR OFFSHORE WIND trademark a serial number of 79331846. The federal status of this trademark filing is REGISTERED as of Tuesday, June 6, 2023. This trademark is owned by ACCIONA CONSTRUCCIÓN, S.A.. The ARGO PROJECT ACCIONA RESEARCH ON GBS FOR OFFSHORE WIND trademark is filed in the Construction & Repair Services and Computer & Software Services & Scientific Services categories with the following description:

Construction and repair of metal structures in the nature of buildings; supervision of structural engineering in the nature of construction supervision; construction of infrastructure, namely, building construction for civil infrastructure projects; marine construction

Architectural and engineering services; consulting in the field of engineering in the nature of providing technological estimates done by engineers; conducting technical project studies in the field of engineering gravity-based structures for offshore wind applications; development of building projects, namely, planning and design of buildings and structures; industrial research in the field of engineering and construction; technology supervision and inspection in the field of construction of structures; engineering services for the design of structures; design services relating to civil engineering; technical consultancy services relating to marine engineering
argo project acciona research on gbs for offshore wind

General Information


Serial Number79331846
Word MarkARGO PROJECT ACCIONA RESEARCH ON GBS FOR OFFSHORE WIND
Filing DateTuesday, November 23, 2021
Status700 - REGISTERED
Status DateTuesday, June 6, 2023
Registration Number7070669
Registration DateTuesday, June 6, 2023
Mark Drawing3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s)
Published for Opposition DateTuesday, March 21, 2023

Trademark Statements


Description of MarkThe mark consists of the wording "ARGO PROJECT", with "ARGO" appearing in blue and the wording "PROJECT" in red appearing beneath it. To the left of these words, there is an incomplete U-shaped square appearing in a red, blue, and purple gradient. Inside it is a complete square appearing in gray. Beneath all these word elements and graphics appears the wording "ACCIONA RESEARCH ON GBS FOR OFFSHORE WIND", in a smaller size and in gray.
Goods and ServicesConstruction and repair of metal structures in the nature of buildings; supervision of structural engineering in the nature of construction supervision; construction of infrastructure, namely, building construction for civil infrastructure projects; marine construction
Indication of Colors claimedThe color(s) blue, red, purple and gray is/are claimed as a feature of the mark.
Disclaimer with Predetermined Text"PROJECT" AND "RESEARCH ON GBS FOR OFFSHORE WIND"
Goods and ServicesArchitectural and engineering services; consulting in the field of engineering in the nature of providing technological estimates done by engineers; conducting technical project studies in the field of engineering gravity-based structures for offshore wind applications; development of building projects, namely, planning and design of buildings and structures; industrial research in the field of engineering and construction; technology supervision and inspection in the field of construction of structures; engineering services for the design of structures; design services relating to civil engineering; technical consultancy services relating to marine engineering

Classification Information


International Class037 - Building construction; repair; installation services.
US Class Codes100, 103, 106
Class Status Code6 - Active
Class Status DateFriday, January 28, 2022
Primary Code037
First Use Anywhere DateNOT AVAILABLE
First Use In Commerce DateNOT AVAILABLE

International Class042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software.
US Class Codes100, 101
Class Status Code6 - Active
Class Status DateFriday, January 28, 2022
Primary Code042
First Use Anywhere DateNOT AVAILABLE
First Use In Commerce DateNOT AVAILABLE

Trademark Owner History


Party NameACCIONA CONSTRUCCIÓN, S.A.
Party Type30 - Original Registrant
Legal Entity Type85 - NOT AVAILABLE
AddressES

Party NameACCIONA CONSTRUCCIÓN, S.A.
Party Type20 - Owner at Publication
Legal Entity Type85 - NOT AVAILABLE
AddressES

Party NameACCIONA CONSTRUCCIÓN, S.A.
Party Type10 - Original Applicant
Legal Entity Type85 - NOT AVAILABLE
AddressES

Trademark Events


Event DateEvent Description
Friday, September 8, 2023GENERIC MADRID TRANSACTION SENT TO IB
Friday, September 8, 2023GENERIC MADRID TRANSACTION CREATED
Wednesday, September 6, 2023FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Tuesday, June 6, 2023NOTICE OF REGISTRATION CONFIRMATION EMAILED
Tuesday, June 6, 2023REGISTERED-PRINCIPAL REGISTER
Tuesday, March 21, 2023NOTIFICATION PROCESSED BY IB
Tuesday, March 21, 2023OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Tuesday, March 21, 2023PUBLISHED FOR OPPOSITION
Wednesday, March 1, 2023NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Wednesday, March 1, 2023NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Wednesday, March 1, 2023NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Friday, February 10, 2023APPROVED FOR PUB - PRINCIPAL REGISTER
Tuesday, January 31, 2023TEAS/EMAIL CORRESPONDENCE ENTERED
Tuesday, January 31, 2023CORRESPONDENCE RECEIVED IN LAW OFFICE
Tuesday, January 31, 2023TEAS RESPONSE TO OFFICE ACTION RECEIVED
Monday, December 5, 2022REFUSAL PROCESSED BY IB
Thursday, November 17, 2022NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Wednesday, November 16, 2022REFUSAL PROCESSED BY MPU
Wednesday, September 14, 2022NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Tuesday, September 13, 2022NON-FINAL ACTION WRITTEN
Tuesday, September 6, 2022ASSIGNED TO EXAMINER
Tuesday, February 1, 2022APPLICATION FILING RECEIPT MAILED
Friday, January 28, 2022NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Thursday, January 27, 2022SN ASSIGNED FOR SECT 66A APPL FROM IB