Serial Number | 79163159 |
Word Mark | APTUS |
Filing Date | Tuesday, April 29, 2014 |
Status | 709 - CANCELLED - SECTION 71 |
Status Date | Friday, May 19, 2023 |
Registration Number | 5075549 |
Registration Date | Tuesday, November 8, 2016 |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | Tuesday, August 23, 2016 |
Goods and Services | Non-metal building materials, namely, partitions, pillars, slabs, composite panels, door panels, floor panels, ceiling panels, roofing panels, wall panels, beams, pre-fabricated architectural columns, poles in the nature of concrete poles for use as building materials, posts, wall framing in the nature of non-metal window and door frames, non-metal components for building foundations in the nature of cementitious-based mastics for foundations of buildings, non-metallic reinforcements for concrete and wood building construction, namely, plates, rods and bars, and cladding; concrete; concrete building materials, namely, concrete building elements joined by metal connectors, namely, concrete blocks, beams, bollards, panels, piles, pipes, poles, pillars, posts, slabs, bricks, walls, and columns; concrete blocks, panels and beams; concrete prefabrication, namely, prefabricated concrete blocks, beams, bollards, panels, piles, pipes, poles, pillars, posts, slabs, bricks, walls, and columns; concrete pipes; water storage tanks made of masonry, bricks or concrete; storage tanks of masonry, brick or concrete; structural parts and fittings for all the aforesaid goods allowed in this class |
Goods and Services | Metal building materials, namely, partitions, pillars, slabs, composite panels, door panels, floor panels, ceiling panels, roofing panels, wall panels, beams, pre-fabricated architectural columns, poles, posts, wall framing, fabricated metal components for building foundations, reinforcement materials, and metal concrete construction hardware, namely, cladding metal connectors in the nature of structure joint connectors of metal used to join concrete building elements together; metal hose fittings, namely, connectors of metal for hoses; connectors of metal for pipes; connectors of metal for tube, namely, metal junctions for tubes; metal connectors used to join panels together; structural parts and fittings for all the aforesaid goods allowed in this class |
Pseudo Mark | APT US |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, May 19, 2023 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, May 19, 2023 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | M3S IP Pty Ltd as trustee for M3S IP Trust |
Party Type | 31 - New Owner After Registration |
Legal Entity Type | 98 - Unknown |
Address | AU |
Party Name | M3S Holdings Pty Ltd |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | AU |
Party Name | M3S Holdings Pty Ltd |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | AU |
Party Name | M3S Holdings Pty Ltd |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | AU |
Event Date | Event Description |
Wednesday, April 22, 2015 | NON-FINAL ACTION WRITTEN |
Thursday, April 9, 2015 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Friday, April 10, 2015 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Friday, April 10, 2015 | ASSIGNED TO EXAMINER |
Tuesday, April 14, 2015 | APPLICATION FILING RECEIPT MAILED |
Friday, December 4, 2015 | FINAL REFUSAL MAILED |
Thursday, April 23, 2015 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Thursday, April 23, 2015 | REFUSAL PROCESSED BY MPU |
Thursday, April 23, 2015 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Friday, May 8, 2015 | REFUSAL PROCESSED BY IB |
Tuesday, October 20, 2015 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Friday, November 6, 2015 | ASSIGNED TO LIE |
Friday, November 13, 2015 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, November 13, 2015 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Thursday, December 3, 2015 | FINAL REFUSAL WRITTEN |
Tuesday, July 19, 2016 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Wednesday, May 4, 2016 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Wednesday, May 4, 2016 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
Wednesday, May 4, 2016 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, May 4, 2016 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Tuesday, June 28, 2016 | EXAMINERS AMENDMENT -WRITTEN |
Tuesday, June 28, 2016 | EXAMINERS AMENDMENT E-MAILED |
Tuesday, June 28, 2016 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Tuesday, June 28, 2016 | EXAMINER'S AMENDMENT ENTERED |
Wednesday, July 13, 2016 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, February 8, 2017 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Wednesday, August 3, 2016 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Wednesday, August 3, 2016 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, August 3, 2016 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Tuesday, August 23, 2016 | PUBLISHED FOR OPPOSITION |
Tuesday, August 23, 2016 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Wednesday, September 14, 2016 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Wednesday, September 14, 2016 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Sunday, October 2, 2016 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Tuesday, November 8, 2016 | REGISTERED-PRINCIPAL REGISTER |
Saturday, September 17, 2022 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
Friday, March 3, 2017 | FINAL DISPOSITION PROCESSED |
Friday, March 3, 2017 | FINAL DISPOSITION NOTICE SENT TO IB |
Friday, March 24, 2017 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Friday, July 21, 2017 | NOTIFICATION PROCESSED BY IB |
Friday, March 5, 2021 | CHANGE OF OWNER RECEIVED FROM IB |
Monday, November 8, 2021 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
Friday, May 19, 2023 | CANCELLED SECTION 71 |
Friday, June 7, 2024 | INTERNATIONAL REGISTRATION RENEWED |
Friday, January 19, 2024 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |