Serial Number | 79401617 |
Word Mark | ANOTHERM |
Filing Date | Tuesday, April 16, 2024 |
Status | 645 - FINAL REFUSAL - MAILED |
Status Date | Thursday, June 5, 2025 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Stone, namely, natural stone; rock, namely, natural and artificial stone; minerals, namely, feldspar; non-metallic building and construction materials and construction elements made of sand, stone, rock, clay, minerals and concrete used in building flooring, roofing, countertops, walls, cladding and fireplaces; non-metallic minerals for building or construction; building glass; structural elements of glass, namely, glass bricks, glass door lites, glass panels for building construction purposes, and glass slabs for use in building; building materials consisting of glass, namely, glass incorporating fine electrical conductors for building; laminated building glass incorporating fine electrical conductors; infrared reflective glass for use in building; heat reflecting glass for building; thermal insulating glass for use in building; Infrared-ray absorbing glass for building; feldspar; sand; sandstone; rock grit used in building flooring, roofing, countertops, walls, cladding and fireplaces; natural and artificial stone chippings used in building flooring, roofing, countertops, walls, cladding and fireplaces; building materials made of rock fibres, namely, rock materials used in building flooring, roofing, countertops, walls, cladding and fireplaces; building materials made of mineral fibres, namely, mineral pellets for use in the building industry; stone, namely, porphyry |
Goods and Services | Plastics and resins in extruded form for use in manufacture; insulating materials for insulation against light; slag wool for use as a building insulator; mineral wool for use as a building insulator; mineral wool for insulating purposes; mineral fibres for insulating purposes; insulation board made from mineral wool; lightweight mineral wool slabs for thermal insulation purposes; lightweight mineral wool slabs for fire insulation purposes |
International Class | 017 - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal. |
US Class Codes | 001, 005, 012, 013, 035, 050 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, August 8, 2024 |
Primary Code | 017 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 019 - Building materials (non-metallic); nonmetallic rigid pipes for building; asphalt, pitch and bitumen; nonmetallic transportable buildings; monuments, not of metal. |
US Class Codes | 001, 012, 033, 050 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, August 8, 2024 |
Primary Code | 019 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Lumina Sustainable Materials A/S |
Party Type | 10 - Original Applicant |
Legal Entity Type | 84 - NOT AVAILABLE |
Address | DK |
Event Date | Event Description |
Thursday, August 8, 2024 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
Friday, August 16, 2024 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Tuesday, October 29, 2024 | ASSIGNED TO EXAMINER |
Friday, August 16, 2024 | APPLICATION FILING RECEIPT MAILED |
Tuesday, November 5, 2024 | NON-FINAL ACTION WRITTEN |
Tuesday, November 12, 2024 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Wednesday, November 6, 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Tuesday, November 12, 2024 | REFUSAL PROCESSED BY MPU |
Thursday, May 8, 2025 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, May 8, 2025 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Thursday, June 5, 2025 | FINAL REFUSAL WRITTEN |
Thursday, June 5, 2025 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Thursday, June 5, 2025 | FINAL REFUSAL E-MAILED |
Saturday, November 30, 2024 | REFUSAL PROCESSED BY IB |
Thursday, May 8, 2025 | TEAS/EMAIL CORRESPONDENCE ENTERED |