Serial Number | 79100019 |
Word Mark | AE PHOTONICS |
Filing Date | Saturday, April 23, 2011 |
Status | 404 - IR CANCELLED - US REGISTRATION CANCELLED |
Status Date | Friday, April 23, 2021 |
Registration Number | 4420224 |
Registration Date | Tuesday, October 22, 2013 |
Mark Drawing | 3000 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, August 6, 2013 |
Indication of Colors claimed | The color(s) white, cardinal red, silver-gray, iron grey and dark grey is/are claimed as a feature of the mark. |
Disclaimer with Predetermined Text | "PHOTONICS" |
Description of Mark | The mark consists of the following: the literal element "AE" in dark grey, the literal element "PHOTONICS" in iron grey. Appearing to the left of the two literal elements are three square-like designs with rounded corners. The left most design appears in cardinal red with three white lines intersecting within the design; the design to the right is in silver-gray with three white intersecting lines; and the design at the bottom is in iron gray with three white lines intersecting within the design. |
Goods and Services | Metal building materials, namely, soffits, fascia, ceiling boards and floor boards, metal trim for buildings, metal floor panels, wall panels of metal, composite panels composed primarily of metal; goods of common metal, in particular substructures for photovoltaic plants comprised of soffits, fascia, ceiling boards and floor boards, metal floor panels, wall panels of metal, composite panels composed primarily of metal, namely, aluminum and steel |
Goods and Services | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electrical circuit boards, electrical power distribution units, circuit boards that act as fuses, cables, transformers; apparatus and instruments for electric power generating in the area of photovoltaic energy, namely, solar modules for power generation; inverters; control and communication systems comprised of irradiation and temperature sensors, computers, electronic data loggers, network routers |
Goods and Services | Organizational preparation of building projects by providing organizational services for business purposes in the field of photovoltaic building projects |
Goods and Services | Financial preparation of building projects in the photovoltaic field through the transfer of financing and loan services, provision of financing, and bridge financing of photovoltaic projects |
Goods and Services | Execution of building projects, namely, installation, operation, and maintenance and repair services for buildings and industrial facilities in the field of photovoltaic apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, apparatus and instruments for electric power generating in the area of photovoltaic, in particular solar modules for power generation, inverter, control and communication systems |
Goods and Services | Transportation and delivery services, namely, transportation, delivery, distribution of products and materials of others in the photovoltaic field |
Goods and Services | Technical preparations of building projects in the photovoltaic field, namely, engineering services, technical project planning and design engineering of photovoltaic power plants, technical consultancy in the field of operating photovoltaic power plants, coordination of electrical grid connections between photovoltaic power plants and an electrical network operator |
International Class | 006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; nonelectric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. |
US Class Codes | 002, 012, 013, 014, 023, 025, 050 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, February 26, 2021 |
Primary Code | 006 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, February 26, 2021 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 035 - Advertising; business management; business administration; office functions. |
US Class Codes | 100, 101, 102 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, February 26, 2021 |
Primary Code | 035 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 036 - Insurance; financial affairs; monetary affairs; real estate affairs. |
US Class Codes | 100, 101, 102 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, February 26, 2021 |
Primary Code | 036 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 037 - Building construction; repair; installation services. |
US Class Codes | 100, 103, 106 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, February 26, 2021 |
Primary Code | 037 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 039 - Transport; packaging and storage of goods; travel arrangement. |
US Class Codes | 100, 105 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, February 26, 2021 |
Primary Code | 039 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
International Class | 042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software. |
US Class Codes | 100, 101 |
Class Status Code | F - NOT AVAILABLE |
Class Status Date | Friday, February 26, 2021 |
Primary Code | 042 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | AE Photonics GmbH |
Party Type | 30 - Original Registrant |
Legal Entity Type | 99 - Other |
Address | DE |
Party Name | AE Photonics GmbH |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 99 - Other |
Address | DE |
Party Name | AE Photonics GmbH |
Party Type | 10 - Original Applicant |
Legal Entity Type | 99 - Other |
Address | DE |
Event Date | Event Description |
Friday, January 21, 2022 | TOTAL INVALIDATION PROCESSED BY THE IB |
Monday, December 20, 2021 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
Monday, December 20, 2021 | INVALIDATION PROCESSED |
Monday, November 22, 2021 | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED |
Monday, November 22, 2021 | DEATH OF INTERNATIONAL REGISTRATION |
Tuesday, October 26, 2021 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
Friday, February 26, 2021 | CANCELLED SECTION 71 |
Monday, October 22, 2018 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
Monday, January 11, 2016 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
Tuesday, February 18, 2014 | FINAL DECISION TRANSACTION PROCESSED BY IB |
Monday, January 27, 2014 | FINAL DISPOSITION NOTICE SENT TO IB |
Monday, January 27, 2014 | FINAL DISPOSITION PROCESSED |
Wednesday, January 22, 2014 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
Tuesday, October 22, 2013 | REGISTERED-PRINCIPAL REGISTER |
Sunday, September 29, 2013 | NOTIFICATION PROCESSED BY IB |
Tuesday, August 6, 2013 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, August 6, 2013 | PUBLISHED FOR OPPOSITION |
Wednesday, July 17, 2013 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, July 17, 2013 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
Wednesday, July 17, 2013 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Friday, June 28, 2013 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
Thursday, June 27, 2013 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Thursday, June 27, 2013 | EXAMINER'S AMENDMENT ENTERED |
Thursday, June 27, 2013 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
Thursday, June 27, 2013 | EXAMINERS AMENDMENT E-MAILED |
Thursday, June 27, 2013 | EXAMINERS AMENDMENT -WRITTEN |
Thursday, June 27, 2013 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Thursday, June 27, 2013 | NON-FINAL ACTION E-MAILED |
Thursday, June 27, 2013 | NON-FINAL ACTION WRITTEN |
Wednesday, June 5, 2013 | SUSPENSION CHECKED ¿ TO ATTORNEY FOR ACTION |
Saturday, January 26, 2013 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
Wednesday, January 9, 2013 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
Wednesday, January 9, 2013 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
Monday, December 3, 2012 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Tuesday, May 29, 2012 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |
Tuesday, May 29, 2012 | ASSIGNED TO LIE |
Friday, February 24, 2012 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
Monday, November 28, 2011 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Monday, November 28, 2011 | LETTER OF SUSPENSION E-MAILED |
Monday, November 28, 2011 | SUSPENSION LETTER WRITTEN |
Friday, November 4, 2011 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, November 4, 2011 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Friday, November 4, 2011 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Saturday, August 27, 2011 | REFUSAL PROCESSED BY IB |
Thursday, August 11, 2011 | APPLICATION FILING RECEIPT MAILED |
Monday, August 8, 2011 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
Monday, August 8, 2011 | REFUSAL PROCESSED BY MPU |
Monday, August 8, 2011 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
Sunday, August 7, 2011 | NON-FINAL ACTION WRITTEN |
Sunday, August 7, 2011 | ASSIGNED TO EXAMINER |
Sunday, August 7, 2011 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
Thursday, August 4, 2011 | SN ASSIGNED FOR SECT 66A APPL FROM IB |