Serial Number | 97424539 |
Word Mark | ABF AMERICAN BATTERY FACTORY |
Filing Date | Monday, May 23, 2022 |
Status | 730 - FIRST EXTENSION - GRANTED |
Status Date | Tuesday, August 6, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 3 - Illustration: Drawing or design which also includes word(s) / letter(s) / number(s) |
Published for Opposition Date | Tuesday, December 12, 2023 |
Description of Mark | The mark consists of the letters "ABF" inside lines forming a battery located above the words "AMERICAN BATTERY FACTORY". |
Goods and Services | Fuel cells; Batteries; Lithium ion batteries; Lithium iron phosphate, lithium ion, and sodium fuel cells; Power generation systems, namely, fuel cells, batteries, lithium iron batteries, and lithium ion batteries; Lithium iron phosphate, lithium ion, and sodium fuel cells; Lithium iron phosphate, lithium ion, and sodium fuel cell power generation systems and subsystems, namely, anodes, electric sensors, cathodes, battery separators; Lithium iron phosphate, lithium ion, and sodium fuel cell power generation subsystems, namely, anodes, electric sensors, cathodes, battery separators; Integrated lithium iron phosphate, lithium ion, and sodium fuel cell power generating systems and subsystems comprising of lithium iron phosphate, lithium ion, and sodium fuel cell stacks; Components for fuel cell power generation systems and subsystems, namely, anodes, electric sensors, cathodes, battery separators; Components for lithium iron phosphate, lithium ion, and sodium fuel cell power generation systems and subsystems, namely, anodes, electric sensors, cathodes, battery separators; Downloadable computer software for diagnostics and operating fuel cell systems; Downloadable computer software for diagnostics and operating lithium iron phosphate, lithium ion, and sodium fuel cell systems; Downloadable diagnostic computer software for processing and validating fuel cell test parameter data; Downloadable diagnostic computer software for processing and validating lithium iron phosphate, lithium ion, and sodium fuel cell test parameter data; Integrated lithium iron phosphate, lithium ion, and sodium fuel cell systems, namely, anodes, electric sensors, cathodes, battery separators; Anodes, electric sensors, cathodes, battery separators; Parts and fittings for fuel cells; Parts and fittings for lithium iron phosphate, lithium ion, and sodium fuel cells |
Indication of Colors claimed | Color is not claimed as a feature of the mark. |
NOT AVAILABLE | "AMERICAN BATTERY FACTORY" |
International Class | 009 - Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire extinguishing apparatus. |
US Class Codes | 021, 023, 026, 036, 038 |
Class Status Code | 6 - Active |
Class Status Date | Thursday, May 26, 2022 |
Primary Code | 009 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | American Battery Factory Inc. |
Party Type | 20 - Owner at Publication |
Legal Entity Type | 03 - Corporation |
Address | American Fork, UT 84003 |
Party Name | American Battery Factory Inc. |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | American Fork, UT 84003 |
Event Date | Event Description |
Thursday, May 26, 2022 | NEW APPLICATION ENTERED |
Thursday, May 26, 2022 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Friday, May 27, 2022 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
Friday, March 10, 2023 | ASSIGNED TO EXAMINER |
Tuesday, March 14, 2023 | NON-FINAL ACTION WRITTEN |
Tuesday, March 14, 2023 | NON-FINAL ACTION E-MAILED |
Tuesday, March 14, 2023 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Wednesday, June 14, 2023 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, June 14, 2023 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Thursday, June 15, 2023 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Friday, August 4, 2023 | FINAL REFUSAL WRITTEN |
Friday, August 4, 2023 | FINAL REFUSAL E-MAILED |
Friday, August 4, 2023 | NOTIFICATION OF FINAL REFUSAL EMAILED |
Monday, November 6, 2023 | TEAS REQUEST FOR RECONSIDERATION RECEIVED |
Monday, November 6, 2023 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Tuesday, November 7, 2023 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Wednesday, November 8, 2023 | APPROVED FOR PUB - PRINCIPAL REGISTER |
Wednesday, November 22, 2023 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
Tuesday, December 12, 2023 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
Tuesday, December 12, 2023 | PUBLISHED FOR OPPOSITION |
Tuesday, August 6, 2024 | SOU TEAS EXTENSION RECEIVED |
Tuesday, August 6, 2024 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
Tuesday, August 6, 2024 | SOU EXTENSION 1 GRANTED |
Tuesday, August 6, 2024 | SOU EXTENSION 1 FILED |
Wednesday, February 5, 2025 | SOU TEAS EXTENSION RECEIVED |
Tuesday, February 6, 2024 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |